Plan Review Details - Permit 16070715
Plan Review Stops For Permit 16070715
Review Stop AD ADDRESSING
Rev No 2 Status P Date 2016-11-19 Cont ID  
Sent By shill Date 2016-11-19 Time 08:42 Rev Time 0.00
Received By shill Date 2016-11-19 Time 08:42 Sent To  
Notes
***NONE***

Review Stop AD ADDRESSING
Rev No 1 Status F Date 2016-10-05 Cont ID  
Sent By shill Date 2016-10-05 Time 08:17 Rev Time 0.00
Received By shill Date 2016-10-05 Time 08:17 Sent To  
Notes
2016-10-05 08:18:08ADDRESS WILL BE ASSIGNED PRIOR TO PERMIT ISSUANCE.
  

Review Stop AIPP ART IN PUBLIC PLACES
Rev No 1 Status P Date 2016-11-22 Cont ID  
Sent By shill Date 2016-11-22 Time 16:47 Rev Time 0.00
Received By shill Date 2016-11-22 Time 16:47 Sent To  
Notes
2016-11-22 16:47:31OK PER EMAIL FROM SYBILLE WELTER DATED 11/22/16

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2017-01-17 Cont ID  
Sent By shill Date 2017-01-17 Time 14:43 Rev Time 0.00
Received By shill Date 2017-01-17 Time 07:38 Sent To  
Notes
2017-06-26 12:42:3416070715 - BUILDING DATA FOR C.O. AND REPORTING
 USC-404 TYPE 105 - NEW:RES FIVE OR MORE UNITS
 SQUARE FEET - 641051
  
 CONSTRUCTION TYPE: 14-1-A
 UNITS: 290
 FLOORS: 25
 BEDROOMS: 391
 ROOMS: 3101
 SQ FT LIVABLE: 641051
 SQ FT FOOTPRINT: 38078
 SQ FT ROOF: 38078
  
 SETBACKS FRONT (USE THIS TO ENTER VERTICAL DATUM IF
 KNOWN):
 SETBACKS BACK (USE THIS TO ENTER FIRST FLOOR IF KNOWN):
 XX.XX
 SETBACKS LEFT (USE THIS TO ENTER SECOND FLOOR IF KNOWN:
 XX.XX
 OCC LOAD: 4837
 PROP USE: GAR/R2/M/A
 SPRINKLER SYS? Y
 SPRK REQ'D? Y
 BATHRMS: 391
  
 BLDG CODE: FL 2014
 OCC CLASS: 5TH ED R-2
2017-01-17 14:43:45****PROVISOS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 A. PROVISO: TCO AT EACH PHASE IS SUBJECT TO APPROVAL OF
 THE BUILDING OFFICIAL (OR HIS REPRESENTATIVE) AND FIRE
 DEPARTMENT, AND MAY INCLUDE ITEMS NOT WITHIN THE SCOPE
 OF THIS REVIEW. A TCO REQUEST FORM AND FEE WILL BE
 REQUIRED. THIS FORM IS AVAILABLE UPON REQUEST BY EMAIL.
  
 C. SEPARATE PERMITS (APPLICATION, PLANS, REVIEWS, AND
 FEES) REQUIRED FOR ALL ITEMS OTHER THAN MECHANICAL,
 ELECTRICAL, AND PLUMBING FOR THE BUILDING AS SHOWN ON
 THE PLANS. THIS INCLUDES SIGNS, FIRE ALARM, FIRE
 SPRINKLERS, LANDSCAPING.
  
 SUB PERMITS (APPLICATION, SUB PERMIT FEE) ARE REQUIRED
 FOR MECHANICAL, ELECTRICAL, AND PLUMBING PRIOR TO
 COMMENCEMENT OF WORK.
  
 A ROOFING SUB PERMIT IS REQUIRED PRIOR TO COMMENCEMENT
 OF ROOFING WORK. AS ROOF DOCUMENTS HAVE NOT BEEN
 PROVIDED, THIS IS A DEFERRED SUBMITTAL. PRODUCT
 APPROVALS REVIEWED BY DESIGNER OF RECORD, SELECTED
 ASSEMBLY, ENGINEERING IF APPLICABLE ARE TO BE SUBMITTED
 AS A REVISION WITH A ROOF PERMIT APPLICATION.
  
 D. COMPONENTS AND CLADDING PRODUCT APPROVALS ARE TO BE
 REVIEWED BY DESIGNER OF RECORD AND SUBMITTED PRIOR TO
 INSTALLATION.
  
 E. PROVISO, THIS STUCTURE SERVES A BUILDING WHICH HAS
 NOT BEEN REVIEWED BY THIS DEPARTMENT (TRAIN STATION).
 ACCESSIBLE ROUTE IN COMPLIANCE WITH FBC 5TH EDITION
 ACCESSIBILITY IS REQUIRED AND WILL BE VERIFIED IN THE
 FIELD.
  
 F. PROVISO, THE PROJECT MANUAL HAS NOT BEEN REVIEWED.
 DOOR HARDWARE TO COMPLY WITH FBC BUILDING, FBC
 ACCESSIBILITY.
 G. PROVISO, ALL DOORS AND GATES IN THE MEANS OF EGRESS
 FOR ASSEMBLY OCCUPANCY ARE TO INCLUDE PANIC DEVICES OR
 FIRE EXIT HARDWARE, FBC 1008.
 H. PROVISO, PRODUCT APPROVALS FOR COMPONENTS AND
 CLADDING HAVE NOT BEEN SUBMITTED. THEY MAY BE
 SUBMITTED, PRIOR TO INSTALLATION, AS A REVISION, PRIOR
 TO INSTALLATION.
  
 I. PROVISO, FLOORING UNDERLAYMENT IS TO COMPLY WITH FBC
 1207.2, 1207.3, AND 603.1. THIS MAY BE A DEFERRED
 SUBMITTAL. IF DEFERRED, THE TEST REPORTS ARE TO BE
 SUBMITTED AS A REVISION PRIOR TO INSTALLATION. AS
 STRUCTURAL PLANS SHOW AN 8 INCH SLAB, PRODUCTS TESTED
 WITH EITHER A 6 INCH OR AN 8 INCH SLAB ARE ACCEPTABLE.
  
 1. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING
 DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR
 SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS
 (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR
 BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90.
 THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM
 CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 2. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN
 DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC
 OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN
 IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN
 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH
 ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED
 GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 3. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE
 BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE
 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84
 OR UL 723.
  
 J. FBC ACCESSIBILITY 207, MEANS OF EGRESS SHALL COMPLY
 WITH IBC 2000 WITH 2001 SUPPLEMENT 1003.2.13 OR IBC
 2003 1007.
  
 PER ARCHITECT, BOTH BANKS OF ELEVATORS (EAST SIDE AND
 WEST SIDE) WILL HAVE A MINIMUM OF ONE ELEVATOR OPERABLE
 ON STANDBY POWER.
  
 K. STANDBY POWER, FBC 403.4.8, EMERGENCY POWER 403.4.9
 REQUIRED.
  
 L. FBC ACCESSIBILITY 208.3.1(2) ADVISORY, EV SPACE WITH
 AN ACCESS AISLE, LOCATED ON AN ACCESSIBLE ROUTE, IS
 REQUIRED. A REVISION IS TO BE SUBMITTED, REVIEWED AND
 ISSUED PRIOR TO C.O.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2016-11-23 Cont ID  
Sent By shill Date 2016-11-23 Time 06:50 Rev Time 0.00
Received By shill Date 2016-11-19 Time 08:42 Sent To  
Notes
2016-11-23 06:50:59****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 14. SPECIFY ACCESSIBLE MEANS OF EGRESS SELECTED, FBC
 BUILDING 1007, FBC ACCESSIBILITY 207. REVISE PLAN TO
 SHOW COMPLIANCE WITH METHOD SELECTED IF ALL ITEMS ARE
 NOT IMMEDIATELY APPARENT (FOR EXAMPLE, IBC2000 ELEVATOR
 AS MEANS OF EGRESS COMPONENT).
  
 2ND REVIEW, IT IS NOT CLEAR WHICH METHOD WAS SELECTED.
 RESPONSE STATES STAIRS ARE THE ACCESSIBLE MEANS OF
 EGRESS.
  
 APPLICABLE TO THE TRANSIT PORTION OF THIS BUILDING, SEE
 FBC 1007, ACCESSIBLE MEANS OF EGRESS SHALL BE PROVIDED
 IN ACCORDANCE WITH THE APPLICABLE SECTIONS OF THE FBC
 ACCESSIBILITY.
  
 FBC ACCESSIBILITY 207, MEANS OF EGRESS SHALL COMPLY
 WITH IBC 2000 WITH 2001 SUPPLEMENT 1003.2.13 OR IBC
 2003 1007.
  
 YOU MAY FIND THIS SITE HELPFUL:
  
 HTTPS://WWW.ACCESS-BOARD.GOV/GUIDELINES-AND-STANDARDS/B
 UILDINGS-AND-SITES/ABOUT-THE-ADA-STANDARDS/GUIDE-TO-THE
 -ADA-STANDARDS/CHAPTER-4-ACCESSIBLE-MEANS-OF-EGRESS?TMP
 L=COMPONENT&PAGE=
  
 REVISE PLAN TO CLARIFY COMPLIANCE.
  
 15. A200 REGARDING SIGNAGE ITEM 2; CLARIFY ACCESSIBLE
 MEANS OF EGRESS SELECTED AND REVISE NOTE IF APPLICABLE.
  
 RESPONSE STATES REVISION IS NOT NECESSARY; THIS ITEM
 NOT REVIEWED AT THIS TIME PENDING RESPONSE TO ITEM 14.
  
 16 - 26, OK.
  
 27. SEE PLUMBING COMMENTS REGARDING ACCESSIBILITY AND
 FAIR HOUSING AND REVISE PLAN TO SHOW COMPLIANCE.
 DISREGARD IF COMMENT IS NOT APPLICABLE.
  
 28 - 31. OK
  
  
 32. REVISE PLAN TO SHOW THE 18IN MANEUVERING CLEARANCE,
 PULL SIDE (FBC ACCESSIBILITY 404.2.4), DOOR LOCATED ON
 SHEET A301, DOOR R03H (FBC 5TH ED. ACCESSIBILITY
 206.4.5), OR OTHERWISE INDICATE THAT THIS WILL NOT BE
 THE ONLY DOOR SERVING A TENANT SPACE, OR PROVIDE AN
 OPENER.
  
 2ND REVIEW, THIS WAS DISCUSSED, BUT IT IS NOT CLEAR HOW
 THIS WAS ADDRESSED. PLAN HAS BEEN REDLINED (18IN
 REQUIRED), AND WHEN SCALED APPEARS COMPLIANT. NO ACTION
 REQUIRED UNLESS THIS SHEET IS REVISED FOR OTHER
 REASONS.
  
 33 - 40. OK
  
 41. STANDBY POWER, FBC 403.4.8, EMERGENCY POWER 403.4.9
 REQUIRED.
  
 2ND REVIEW, THE SPECIFICATION BOOK WAS NOT REVIEWED AND
 IS CONSIDERED SUPPLEMENTARY TO THE PLANS. THIS ITEM
 WILL BE A PROVISO BUT CLARIFICATION REGARDING THE
 ELEVATOR(S) REQUIRED FOR THE ACCESSIBLE MEANS OF EGRESS
 IS REQUESTED.
  
 42-50. OK
  
 51. SMOKE CONTROL REFERENCED, BUT REPORT NOT PROVIDED,
 FBC 909.4.
  
 SEE MECHANICAL COMMENTS AND ADDRESS ACCORDINGLY.
  
 52. OK
  
 53. THIS PERMIT WILL BE ISSUED WITH THE FOLLOWING
 PROVISOS:
  
 A. PROVISO: TCO AT EACH PHASE IS SUBJECT TO APPROVAL OF
 THE BUILDING OFFICIAL (OR HIS REPRESENTATIVE) AND FIRE
 DEPARTMENT, AND MAY INCLUDE ITEMS NOT WITHIN THE SCOPE
 OF THIS REVIEW. A TCO REQUEST FORM AND FEE WILL BE
 REQUIRED. THIS FORM IS AVAILABLE UPON REQUEST BY EMAIL.
  
 C. SEPARATE PERMITS (APPLICATION, PLANS, REVIEWS, AND
 FEES) REQUIRED FOR ALL ITEMS OTHER THAN MECHANICAL,
 ELECTRICAL, AND PLUMBING FOR THE BUILDING AS SHOWN ON
 THE PLANS. THIS INCLUDES SIGNS, FIRE ALARM, FIRE
 SPRINKLERS, LANDSCAPING.
  
 SUB PERMITS (APPLICATION, SUB PERMIT FEE) ARE REQUIRED
 FOR MECHANICAL, ELECTRICAL, AND PLUMBING PRIOR TO
 COMMENCEMENT OF WORK.
  
 A ROOFING SUB PERMIT IS REQUIRED PRIOR TO COMMENCEMENT
 OF ROOFING WORK. AS ROOF DOCUMENTS HAVE NOT BEEN
 PROVIDED, THIS IS A DEFERRED SUBMITTAL. PRODUCT
 APPROVALS REVIEWED BY DESIGNER OF RECORD, SELECTED
 ASSEMBLY, ENGINEERING IF APPLICABLE ARE TO BE SUBMITTED
 AS A REVISION WITH A ROOF PERMIT APPLICATION.
  
 D. COMPONENTS AND CLADDING PRODUCT APPROVALS ARE TO BE
 REVIEWED BY DESIGNER OF RECORD AND SUBMITTED AS A
 REVISION PRIOR TO INSTALLATION.
  
 E. PROVISO, THIS STUCTURE SERVES A BUILDING WHICH HAS
 NOT BEEN REVIEWED BY THIS DEPARTMENT (TRAIN STATION).
 ACCESSIBLE ROUTE IN COMPLIANCE WITH FBC 5TH EDITION
 ACCESSIBILITY IS REQUIRED AND WILL BE VERIFIED IN THE
 FIELD.
  
 F. PROVISO, THE PROJECT MANUAL HAS NOT BEEN REVIEWED.
 DOOR HARDWARE TO COMPLY WITH FBC BUILDING, FBC
 ACCESSIBILITY.
 G. PROVISO, ALL DOORS AND GATES IN THE MEANS OF EGRESS
 FOR ASSEMBLY OCCUPANCY ARE TO INCLUDE PANIC DEVICES OR
 FIRE EXIT HARDWARE, FBC 1008.
 H. PROVISO, PRODUCT APPROVALS FOR COMPONENTS AND
 CLADDING HAVE NOT BEEN SUBMITTED. THEY MAY BE
 SUBMITTED, PRIOR TO INSTALLATION, AS A REVISION, PRIOR
 TO INSTALLATION.
  
 I. PROVISO, FLOORING UNDERLAYMENT IS TO COMPLY WITH FBC
 1207.2, 1207.3, AND 603.1. THIS MAY BE A DEFERRED
 SUBMITTAL. IF DEFERRED, THE TEST REPORTS ARE TO BE
 SUBMITTED AS A REVISION PRIOR TO INSTALLATION. AS
 STRUCTURAL PLANS SHOW AN 8 INCH SLAB, PRODUCTS TESTED
 WITH EITHER A 6 INCH OR AN 8 INCH SLAB ARE ACCEPTABLE.
  
 A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING
 DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR
 SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS
 (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR
 BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90.
 THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM
 CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN
 DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC
 OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN
 IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN
 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH
 ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED
 GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE
 BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE
 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84
 OR UL 723.
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-09-15 Cont ID  
Sent By shill Date 2016-09-15 Time 18:00 Rev Time 0.00
Received By shill Date 2016-08-17 Time 15:43 Sent To  
Notes
2016-09-15 18:01:36****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. UPDATE PLANS WITH THE CHANGES MADE TO PERMIT
 16040755, STRUCTURE PERMIT. SOME OF THE COMMENTS IN
 THIS LIST HAVE ALREADY BEEN CORRECTED IN THE STRUCTURE
 PERMIT AND HAVE BEEN FOUND CODE COMPLIANT.
  
 2. FOR C.O. INFORMATION, PROVIDE THE FOLLOWING:
 TOTAL NUMBER OF BEDROOMS
 TOTAL NUMBER OF BATHROOMS
 TOTAL NUMBER OF ROOMS
  
 3. FBC TABLE 705.8. SHEET A100 SHOWS THE NORTH
 ELEVATION (PARTIAL) AS 12FT 1IN FROM THE BUILDING TO
 THE CENTER LINE OF THE ALLEY; SHEET A200 INCLUDES THE
 LIMITATION OF 45 PERCENT UNPROTECTED OPENINGS ALLOWED.
 REVISE THE PLAN TO INCLUDE THE PERCENTAGE OF
 UNPROTECTED OPENINGS FOR THIS BUILDING, NORTH
 ELEVATION.
  
 4. A100 SITE PLAN SHOWS THE APPROX CENTER OF ALLEY.
 REVISE TO INCLUDE EXACT DIMENSION BASED ON THE SURVEY
 OR PLAT SO COMPLIANCE WITH FBC TABLE 602, 705.8 CAN BE
 DETERMINED.
  
 5. FBC TABLE 602, BASED ON FIRE SEPARATION DISTANCE
 (CHAPTER 2), THE NORTH WALL REQUIRES A 1 HOUR RATING.
 A. REVISE TO INCLUDE ON SHEET A201 AND ALL OTHER SHEETS
 AFFECTED OR REVISE SITE PLAN ON A100 TO CLARIFY FIRE
 SEPARATION DISTANCE.
 B. REVISE DOOR SCHEDULE TO COMPLY WITH FBC TABLE 716.5
 FOR AFFECTED DOORS.
  
 6. FBC TABLES 601, 602, PROVIDE DETAILS FOR THE FIRE
 RATED ELEMENTS, INCLUDING THE NORTH WALL WHICH HAS A
 FIRE SEPARATION DISTANCE LESS THAN 30FT, FBC 703, 704.
  
 7. A200, STRUCTURAL FIRE RESISTANCE RATING
 REQUIREMENTS, REVISE STRUCTURE AND ROOF REQUIREMENTS TO
 BE CONSISTENT WITH TABLE 601 OR REVISE PLAN TO INCLUDE
 APPLICABLE EXCEPTION.
  
 8. A200, STRUCTURAL FIRE RESISTANCE RATING
 REQUIREMENTS, A TABLE FROM THE FBC WAS INCLUDED BUT
 DOES NOT INDICATE HOW THE TABLE APPLIES TO THIS
 PROJECT. REVISE TO INCLUDE THE WALLS AFFECTED, FBC
 TABLE 602, FBC 107.
  
 9. FBC 403.5.3 AND 403.5.3(1), REVISE PLAN TO CLARIFY
 PROPOSED EXIT STAIR DOOR OPERATION (OR ADVISE WHERE
 THIS INFORMATION CAN BE FOUND).
  
 10. A200 SPECIFIES BOTH OCCUPANCY SEPARATION AND NON
 SEPARATED OCCUPANCIES. REVISE PLAN TO CLARIFY WHICH OF
 THE TWO METHODS IS PROPOSED, FBC 508. THIS INFORMATION
 IS ALSO REQUIRED FOR THE TENANT BUILD OUTS, FBC 107.
  
 11. A200 OCCUPANCY SEPARATION REFERS TO ASSEMBLY WITHIN
 EDUCATIONAL OCCUPANCIES (NOTE 1), REMOVE THIS AND OTHER
 NOTES WHICH DO NOT APPLY TO THIS PROJECT, OR CLARIFY
 WHERE THIS IS OR MAY BE APPLICABLE.
  
 12. A200 OCCUPANCY CLASSIFICATION INCLUDES A1 THEATER;
 ADVISE WHERE THIS CAN BE LOCATED, OR IS THIS A FUTURE
 IMPROVEMENT? FBC 107. REMOVE IF NOT APPLICABLE.
  
 13. A200 AND OTHER PAGES, FIRE RESISTANCE REQUIREMENTS
 WALLS, ITEM C, IS NOT CLEAR WHERE THIS IS APPLICABLE.
 REVISE TO REFLECT THE REQUIREMENT FOR THIS PROJECT. IT
 WOULD BE HELPFUL IF THE ACTUAL FIRE RATING REQUIREMENTS
 SPECIFIC TO THIS PROJECT WERE INCORPORATED INTO THIS
 TABLE (SUGGESTED, NOT REQUIRED).
  
 14. SPECIFY ACCESSIBLE MEANS OF EGRESS SELECTED, FBC
 BUILDING 1007, FBC ACCESSIBILITY 207. REVISE PLAN TO
 SHOW COMPLIANCE WITH METHOD SELECTED IF ALL ITEMS ARE
 NOT IMMEDIATELY APPARENT (FOR EXAMPLE, IBC2000 ELEVATOR
 AS MEANS OF EGRESS COMPONENT).
  
 15. A200 REGARDING SIGNAGE ITEM 2; CLARIFY ACCESSIBLE
 MEANS OF EGRESS SELECTED AND REVISE NOTE IF APPLICABLE.
  
 16. A200, SIGNAGE NOTE 3, THE LANGUAGE, LOCATION AND
 CODE REFERENCE ARE NOT CONSISTENT WITH FBC 703.7;
 REVISE OR CLARIFY. VERIFY THAT ALL NOTES HAVE
 SPECIFICATIONS AND CODE REFERENCES CONSISTENT WITH FBC
 2014, FBC 107. IT APPEARS THAT SEVERAL REFERENCES ARE
 FROM A PREVIOUS CODE VERSION.
  
 17. A200 FIRE EXTINGUISHER NOTES DO NOT REFERENCE FBC
 906, REVISE.
  
 18. A200 INCIDENTAL USE AREAS AND NON PROTECTED SHAFT
 DO NOT APPEAR TO BE APPLICABLE. EITHER REMOVE OR REVISE
 TO CLARIFY LOCATIONS PROPOSED, FBC 107.
  
 19. FOR C.O., AN ACCURATE OCCUPANT LOAD FOR THE
 BUILDING IS REQUIRED. SEE A202; GARAGE OCC LOAD IN THE
 CHART IS NOT CONSISTENT WITH THE GARAGE OCC LOAD ON THE
 PLAN. THE TOTAL OCCUPANTS PER LEVEL AND OCCUPANT LOAD
 CATEGORY ARE LACKING SEVERAL FLOORS (15 TO 23),
 PLEASE CORRELATE AND UPDATE TO REFLECT CORRECTED
 OCCUPANT LOAD ON THE POOL DECK AND ANY OTHER CHANGES.
  
 20. FBC 406.4, CLASSIFY THE PARKING GARAGE AS EITHER
 ENCLOSED OR OPEN. IT IS SUGGESTED THAT THIS BE
 INCORPORATED WITH THE BUILDING GENERAL DATA A201. IF
 OPEN, PROVIDE PERCENTAGE OF OPENINGS PROVIDED TO SHOW
 COMPLIANCE WITH FBC 406.5. IF ENCLOSED, PROVIDE
 VENTILATION 406.6.2.
  
 21. A202, LIFE SAFETY TCO NOTES INCLUDES FOUR TCO
 PHASES; PLAN SHOWS TWO, PLEASE CORRELATE.
  
 22. A202, THE LIFE SAFETY PLAN LACKS STAIR NUMBER
 DESIGNATIONS. PROVIDE IN ORDER TO CORRELATE WITH
 DETAILS ON A701-A712, FBC 107. CHECK ALL SHEETS.
  
 23. IT IS NOT CLEAR WHERE THE EXIT DISCHARGE IS LOCATED
 FOR STAIR LOCATED AT GRIDLINES H3 SHEET A202, FBC 107.
 (ITEM ADDRESSED IN STRUCTURE PERMIT, PLEASE UPDATE.)
  
 24. AS301 LEVEL 1, THE ACCESSIBLE ROUTE FOR THE
 ACCESSIBLE VAN PARKING SPACE IS NOT CLEAR; THIS WAS
 ADDRESSED IN STRUCTURE PERMIT, PLEASE UPDATE PLANS.
  
 25. AVIS, LEASING OFFICE, RETAIL/RESTAURANT, AND
 PASSENGER PARKING MINIMUM REQUIREMENTS ARE COVERED BY
 FBC 5TH EDITION ACCESSIBILITY 208, RESIDENTIAL PARKING
 MINIMUM REQUIREMENTS DETERMINED BY FBC 5TH EDITION
 ACCESSIBILITY FAIR HOUSING.
  
 A100, PARKING SCHEDULE, AND OTHER PAGES, REVISE TO SHOW
 COMPLIANCE WITH THE FOLLOWING ITEMS:
  
 THE OPERATION OF THE AVIS BUSINESS AND SPACES IS NOT
 CLEAR. REVISE THE PLAN TO CLARIFY HOW THIS BUSINESS
 WILL OPERATE. WILL CUSTOMERS PICK UP THE CARS, OR WILL
 THE CAR BE BROUGHT TO THE CUSTOMER? IT APPEARS THAT AN
 ACCESSIBLE AVIS SPACE OR A PASSENGER LOADING ZONE MAY
 BE REQUIRED. REVISE PLAN TO DEMONSTRATE COMPLIANCE (OR
 EXEMPTION), INCLUDING APPLICABLE DETAILS. IF THE
 PARKING SPACES ARE FOR AUTO STORAGE ONLY, REVISE PLAN
 TO INCLUDE THIS INFORMATION AS WELL AS DETAILS FOR THE
 PASSENGER LOADING ZONE (FBC ACCESSIBILITY 208.1, 503),
 OR REVISE PLAN TO INCORPORATE INFORMATION REGARDING
 FUNCTION OF THE AUTO RENTAL AREA AND HOW THIS AREA
 COMPLIES WITH (OR IS EXEMPT FROM) ACCESSIBILITY.
  
 26. FBC ACCESSIBILITY 208, PARKING FOR THE RETAIL AND
 RESTAURANT AREAS IS NOT CLEAR. REVISE PLAN TO INDICATE
 NUMBER OF SPACES, ACCESSIBLE SPACES, VAN SPACES, AND
 LOCATION OR NOTE IF NONE OF THE PARKING SPACES IN THIS
 STRUCTURE ARE FOR THE RETAIL/RESTAURANT AREAS.
  
 27. SEE PLUMBING COMMENTS REGARDING ACCESSIBILITY AND
 REVISE PLAN TO SHOW COMPLIANCE.
  
 28. A212, CLARIFY USE OF THE AMENITIES ROOM, FBC 107.
  
 29. LEASING OFFICE PARKING PROVIDED IS NOT CLEAR.
 REVISE PLAN TO DESIGNATE NUMBER OF PARKING SPACES
 DEDICATED TO LEASING, ACCESSIBLE AND VAN SPACES (NUMBER
 AND LOCATIONS), FBC ACCESSIBILITY 208. IT MAY BE
 HELPFUL TO DESIGNATE WHICH FLOORS OR AREAS ARE FOR
 RESIDENTS, RETAIL VISITORS, AND TRANSIT.
  
 30. ONE GUEST SPACE IS SHOWN ON THE PARKING SCHEDULE.
 REVISE TO DESIGNATE WHETHER THIS IS FOR PASSENGER,
 LEASING, RETAIL OR RESIDENT PARKING AND NOTE LOCATION
 ON PLAN, FBC ACCESSIBILITY 208.
  
 31. A212, POOL DECK OCCUPANT LOAD SHOULD BE CALCULATED
 AT 15SF GROSS PER PERSON, PLEASE REVISE TABLES AND
 OCCUPANT LOAD FOR THE POOL DECK. IT DOES NOT APPEAR
 THAT EXITING IS ADEQUATE FOR THIS ASSEMBLY AREA; FBC
 5TH EDITION TABLE 1004.1.2. THIS ITEM WAS ADDRESSED IN
 THE STRUCTURE PERMIT; PLEASE REVISE TO BE CONSISTENT
 WITH 16040755.
 32. REVISE PLAN TO SHOW THE 18IN MANEUVERING CLEARANCE,
 PULL SIDE (FBC ACCESSIBILITY 404.2.4), DOOR LOCATED ON
 SHEET A301, DOOR R03H (FBC 5TH ED. ACCESSIBILITY
 206.4.5), OR OTHERWISE INDICATE THAT THIS WILL NOT BE
 THE ONLY DOOR SERVING A TENANT SPACE, OR PROVIDE AN
 OPENER.
  
 33. SHEET AS212A, DOORS TO LOBBY FROM POOL AREA SWING
 AGAINST PATH OF TRAVEL, FBC 1008.1.2.
  
 34. ADVISORY; SHEET AS203, THE SOUTH ACCESSIBLE PARKING
 SPACE (GRIDLINE G4) REQUIRES THE OCCUPANT TO TRAVEL
 BEHIND THE VAN PARKING SPACE TO ACCESS THE LOBBY, AVIS,
 AND RESIDENTIAL LOBBY. THIS WILL BE REQUIRED TO BE
 CORRECTED ON THE BUILDING PERMIT.
  
 35. FBC 505, LEVEL 12.5 IS NOT SHOWN AS A STORY ON THE
 BUILDING DATA. EITHER REVISE PLAN TO SHOW COMPLIANCE
 WITH REQUIREMENTS FOR MEZZANINES, OR REVISE BUILDING
 DATA INFORMATION.
  
 36. COMPLIANCE WITH FBC 5TH EDITION ACCESSIBILITY, FAIR
 HOUSING IS NOT CLEAR. IF DESIGNING USING THE FAIR
 HOUSING ACT DESIGN MANUAL, PROVIDE UNIT LAYOUTS WITH
 UNIT TYPE AND DIMENSIONS SHOWING COMPLIANCE.
  
 IF USING ANOTHER METHOD, PROVIDE DETAILS AND DIMENSIONS
 TO SHOW COMPLIANCE.
  
 37. F202 AND E202 SHOW A MEZZANINE, PROVIDE AN
 ARCHITECTURAL FLOOR PLAN; LOCATION IS NOT CLEAR, AND IS
 THIS A MEZZANINE PER FBC505? INCLUDE ALL INFORMATION
 REQUIRED TO DETERMINE CODE COMPLIANCE FOR THIS AREA,
 FBC 107. IF THIS IS NOT A MEZZANINE, IT IS SUGGESTED
 THAT THE NAME OF THE AREA BE REVISED FOR CLARITY.
  
 38. UNIT NAMES ON LIFE SAFETY SHEETS ARE NOT THE SAME
 AS FLOOR PLANS (FOR INSTANCE, SEE A202 AND A302),
 CORRELATE.
  
 39. A FIRE ALARM SYSTEM IN COMPLIANCE WITH FBC
 907.2.13.1 IS REQUIRED PER FBC 403.4.2. SMOKE DETECTORS
 IN COMPLIANCE WITH FBC 907.2.13.1 IS REQUIRED PER FBC
 403.4.1. REVISE PLAN TO INCLUDE NOTES, OR ADVISE WHERE
 COMPLIANCE WITH THESE STANDARDS CAN BE LOCATED ON THE
 PLAN. BOTH ITEMS REQUIRE SEPARATE APPLICATIONS,
 PERMITS, PLANS AND FEES, FBC 107, AND WILL BE REVIEWED
 AT THAT TIME.
  
 40. FBC 403.4.5, EMERGENCY RESPONDER RADIO COVERAGE,
 REVISE PLAN TO INCLUDE A NOTE TO SHOW COMPLIANCE WITH
 THIS SECTION.
  
 NFPA 1, CHAPTER 11, BUILDING SERVICES; 11.10 TWO-WAY
 RADIO ENHANCEMENT SERVICES.
 11.10.1 IN ALL NEW AND EXISTING BUILDINGS, MINIMUM
 RADIO SIGNAL STRENGTH FOR FIRE DEPARTMENT
 COMMUNICATIONS SHALL BE MAINTAINED AT A LEVEL
 DETERMINED BY THE AHJ.
 MAINTAIN A MINIMUM RADIO SIGNAL STRENGTH OF 102.0 DBM
 FOR THE RADIO SYSTEM USED BY WEST PALM BEACH FIRE
 RESCUE. IF THE MINIMUM CANNOT BE MAINTAINED, A
 BI-DIRECTIONAL AMPLIFIED SYSTEM SHALL BE INSTALLED WITH
 A MINIMUM 2-HOUR RUN TIME BATTERY BACK-UP.
  
 41. STANDBY POWER, FBC 403.4.8, EMERGENCY POWER 403.4.9
 REQUIRED. REVISE PLAN TO SHOW COMPLIANCE OR ADVISE AS
 TO WHERE THIS CAN BE LOCATED. CLARIFY WHICH ITEMS WILL
 BE ON EMERGENCY POWER. WHICH ELEVATOR(S) WILL BE
 INCLUDED (FBC 1007)?
  
 42. FBC 403.5.4 SMOKEPROOF EXIT, THE NEW STAIR (5?)
 DOES NOT APPEAR ON THE MECHANICAL SHEETS (MEZZANINE
 LEVEL AS SHOWN ON FIRE AND ELEC PAGES, M704, OTHER
 PAGES).
  
 43. FBC 905.4, STANDPIPE REQUIRED IN STAIRS, UNABLE TO
 LOCATE THIS FOR THE NEW STAIR.
  
 44. FBC 403.6.1, COMPLIANCE WITH FIRE SERVICE ACCESS
 ELEVATOR REQUIREMENTS IS NOT CLEAR. SHEET A202 (AND
 OTHER LIFE SAFETY SHEETS) SHOW A FIRE SERVICE LOBBY ON
 THE WEST SIDE WHICH IS NOT INCLUDED IN TCO AREA 1. ALL
 LIFE SAFETY SYSTEMS ARE TO BE IN PLACE FOR TCO.
  
 THE ELEVATORS DESIGNATED AS FIRE SERVICE IS NOT CLEAR.
 FOR INSTANCE, SEE LEVEL 8. IT APPEARS THAT ONLY THE
 NORTH ELEVATOR, WEST SIDE IS DESIGNATED AS THE FIRE
 SERVICE ELEVATOR, BUT AT LEAST TWO ARE REQUIRED PER FBC
 403.6.1.
 REVISE PLAN TO SHOW COMPLIANCE WITH THE FIRE SERVICE
 ELEVATORS REQUIREMENT, INCLUDING THE WEIGHT CAPACITY
 REQUIREMENT. FIRE SERVICE ELEVATORS ARE TO COMPLY WITH
 FBC 3007. REVISE PLAN TO SHOW COMPLIANCE WITH 3007.2
 RECALL, 3007.7.5 SIGNAGE, 3007.3 SPRINKLERS, 3007.4
 WATER PROTECTION, 3007.6.1, 3007.6.2 HOISTWAY LIGHTING,
 3007.7.2 1 HOUR SMOKE BARRIER FOR LOBBY, 3007.7.3 LOBBY
 DOORS, 3007.8 MONITORING, 3007.9 ELECTRICAL POWER,
 3007.9.1 PROTECTION OF WIRING AND CABLES.
  
 45. SOME LEVELS (FOR INSTANCE, LEVELS 12.5, 13) LACK A
 FIRE SERVICE ELEVATOR FBC 403.
  
 46. FBC 3004, HOISTWAY VENTING NOT CLEAR, REVISE PLAN
 TO SHOW COMPLIANCE.
  
 47. FBC 3002.4, SHOW LOCATION OF STRETCHER ELEVATOR
 SIGNAGE.
  
 48. FBC 908.7, CARBON MONOXIDE DETECTORS ARE REQUIRED,
 REVISE.
  
 49. PRODUCT APPROVALS FOR COMPONENTS AND CLADDING HAVE
 NOT BEEN SUBMITTED. THEY MAY BE A DEFERRED SUBMITTAL.
 THEY MAY BE SUBMITTED, PRIOR TO INSTALLATION, AS A
 REVISION, PRIOR TO INSTALLATION.
  
 50. FLOORING UNDERLAYMENT IS TO COMPLY WITH FBC 1207.2,
 1207.3, AND 603.1. THIS MAY BE A DEFERRED SUBMITTAL. IF
 DEFERRED, THE TEST REPORTS ARE TO BE SUBMITTED AS A
 REVISION PRIOR TO INSTALLATION. AS STRUCTURAL PLANS
 SHOW AN 8 INCH SLAB, PRODUCTS TESTED WITH EITHER A 6
 INCH OR AN 8 INCH SLAB ARE ACCEPTABLE.
  
 A. FBC 1207.2, FLOOR/CEILING ASSEMBLIES SEPARATING
 DWELLING UNITS FROM EACH OTHER OR FROM PUBLIC OR
 SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION CLASS
 (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED) FOR AIR
 BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM E 90.
 THE TEST REPORT CANNOT INCLUDE A DROPPED GYPSUM
 CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 B. FBC 1207.3, FLOOR/CEILING ASSEMBLIES BETWEEN
 DWELLING UNITS OR BETWEEN A DWELLING UNIT AND A PUBLIC
 OR SERVICE AREA WITHIN THE STRUCTURE SHALL HAVE AN
 IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN
 50 (45 IF FIELD TESTED) WHEN TESTED IN ACCORDANCE WITH
 ASTM E 492. THE TEST REPORT CANNOT INCLUDE A DROPPED
 GYPSUM CEILING. PROVIDE A COPY OF THE TEST REPORT.
  
 C. FBC 603.1, ALLOWABLE MATERIALS IN NON COMBUSTIBLE
 BUILDINGS, SEE ITEM 2, EXCEPTION 2, ACOUSTICAL
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200. SEE
 803.1.1, PROVIDE TEST DATA IN ACCORDANCE WITH ASTM E 84
 OR UL 723.
  
 51. SMOKE CONTROL REFERENCED, BUT REPORT NOT PROVIDED,
 FBC 909.4.
  
 52. A SPOT CHECK ON THE ENERGY CALCS WAS DONE. PLEASE
 CLARIFY THE FOLLOWING:
 EXTERNAL LIGHTING SHOWS NO ENTRY.
  
 53. THIS PERMIT WILL BE ISSUED WITH THE FOLLOWING
 PROVISOS:
  
 A. PROVISO: TCO AT EACH PHASE IS SUBJECT TO APPROVAL OF
 THE BUILDING OFFICIAL (OR HIS REPRESENTATIVE) AND FIRE
 DEPARTMENT, AND MAY INCLUDE ITEMS NOT WITHIN THE SCOPE
 OF THIS REVIEW. A TCO REQUEST FORM AND FEE WILL BE
 REQUIRED. THIS FORM IS AVAILABLE UPON REQUEST BY EMAIL.
  
 C. SEPARATE PERMITS (APPLICATION, PLANS, REVIEWS, AND
 FEES) REQUIRED FOR ALL ITEMS OTHER THAN MECHANICAL,
 ELECTRICAL, AND PLUMBING FOR THE BUILDING AS SHOWN ON
 THE PLANS. THIS INCLUDES SIGNS, FIRE ALARM, FIRE
 SPRINKLERS, LANDSCAPING.
  
 SUB PERMITS (APPLICATION, SUB PERMIT FEE) ARE REQUIRED
 FOR MECHANICAL, ELECTRICAL, AND PLUMBING PRIOR TO
 COMMENCEMENT OF WORK.
  
 A ROOFING SUB PERMIT IS REQUIRED PRIOR TO COMMENCEMENT
 OF ROOFING WORK. AS ROOF DOCUMENTS HAVE NOT BEEN
 PROVIDED, THIS IS A DEFERRED SUBMITTAL. PRODUCT
 APPROVALS REVIEWED BY DESIGNER OF RECORD, SELECTED
 ASSEMBLY, ENGINEERING IF APPLICABLE ARE TO BE SUBMITTED
 AS A REVISION WITH A ROOF PERMIT APPLICATION.
  
 D. COMPONENTS AND CLADDING PRODUCT APPROVALS ARE TO BE
 REVIEWED BY DESIGNER OF RECORD AND SUBMITTED AS A
 REVISION PRIOR TO INSTALLATION.
  
 E. PROVISO, THIS STUCTURE SERVES A BUILDING WHICH HAS
 NOT BEEN REVIEWED BY THIS DEPARTMENT (TRAIN STATION).
 ACCESSIBLE ROUTE IN COMPLIANCE WITH FBC 5TH EDITION
 ACCESSIBILITY IS REQUIRED AND WILL BE VERIFIED IN THE
 FIELD.
  
  

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2017-01-06 Cont ID  
Sent By vperez Date 2017-01-06 Time 11:10 Rev Time 0.00
Received By vperez Date 2017-01-06 Time 11:10 Sent To  
Notes
2017-01-06 11:11:23VE CHANGES OK
  
 PREVIOUS PROVISO:
  
 PLEASE SUBMIT TO OUR OFFICE A COPY OF THE EASEMENT
 AGREEMENT WITH FPL UTILITY TO ENSURE THAT THE UTILITY
 VAULT ROOMS ARE NOT UNDER OUR AHJ.
  
 VAL PEREZ
 ELECTRICAL PLANS EXAMINER
 *6717

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2016-11-02 Cont ID  
Sent By vperez Date 2016-11-02 Time 11:49 Rev Time 0.00
Received By vperez Date 2016-11-02 Time 11:49 Sent To  
Notes
2016-11-02 12:02:58PREVIOUS COMMENTS ADDRESSED BASED ON ORIGINAL REVIEW
 PERFORMED BY MIKE ALBARRAN...
  
 PROVISO:
  
 PLEASE SUBMIT TO OUR OFFICE A COPY OF THE EASEMENT
 AGREEMENT WITH FPL UTILITY TO ENSURE THAT THE UTILITY
 VAULT ROOMS ARE NOT UNDER OUR AHJ.
  
 VAL PEREZ
 ELECTRICAL PLANS EXAMINER
 *6717

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2016-10-11 Cont ID  
Sent By albarran Date 2016-10-11 Time 18:50 Rev Time 0.00
Received By albarran Date 2016-08-05 Time 10:45 Sent To  
Notes
2016-10-11 18:51:08REVIEWED FOR COMPLIANCE WITH: 5TH EDITION FBC 2014 &
 NFPA 70 2011 (NEC)
  
 BELOW ARE THE ELECTRICAL COMMENTS FOR THE FAILED PLAN
 REVIEW:
  
 TYPICAL COMMENT: CITY OF WEST PALM BEACH AMENDMENTS TO
 THE FBC-B SECTION 107.2.1.4 REQUIRES THAT BUILDING
 PLANS BE DRAWN TO A MINIMUM 1/8? SCALE. THE SUBMITTED
 DRAWINGS ARE DRAWN TO A 3/32? SCALE MAKING THEM A BIT
 SMALLER THAN THE REQUIRED. PLEASE CORRECT ACCORDINGLY.
  
 SHEET E000
 1. CLARIFY THE FRONT OF PANEL WHEN RECESSED IN THE
 DISTRIBUTION EQUIPMENT BOX
 2. IS IT YOUR INTENT TO SHARE THESE SYMBOLS IN THE
 LIGHTING LEGEND
 3. IS IT YOUR INTENT TO SHARE THIS SYMBOL IN THE POWER
 CONNECTIONS BOX
 4. FIRE ALARM WORK SHALL BE UNDER SEPARATE PERMIT &
 SUBMITTAL
 SHEET E001
 5. PLEASE TRY TO BE CONSISTENT WITH THE ABBREVIATIONS
 THROUGHOUT THE SET. I SEE MULTIPLE SYMBOLS W/THE SAME
 DESIGNATION. SYMBOLS NOT ALIGNED TO DESCRIPTION.
 6. IS IT YOUR INTENT TO SHARE THIS SYMBOL IN THE
 DEMOLITION NOTES BOX
 SHEET E201A
 7. NEC 422.31: EWH-4 REQUIRES A DISCONNECT
 8. NEC 210.8(B): RECEPTACLE OUTLETS IN GARAGES OR
 INDOOR WET LOCATIONS SHALL BE GFI PROTECTED
 9. SEE NEC 430 FOR THE REQUIRED DISCONNECTS AND
 ADDITIONAL CONTROLS AND SAFETY DEVICES REQUIRED,
 TYPICAL TO ALL MOTOR LOADS
 SHEET E202
 10. HIGHLY UNLIKELY THAT THERE WILL ONLY BE 2 OUTLETS
 IN THE MEZZANINE
 SHEET E203
 11. THE FOLLOWING MOTORS AND APPLIANCES REQUIRED
 DISCONNECTS AS MENTIONED ABOVE AHU2-1, FCU2-2, EWH-8,
 FCU2-1.1, FCU2-3, FCU2-1.2, EWH-4
 SHEET E204
 12. SAME AS ABOVE FOR FCU3-1
 SHEET E208
 13. SAME AS ABOVE FOR FCU7-1
 SHEET E210
 14. SAME AS ABOVE FOR FCU9-3, SF9-3, AS WELL AS EVERY
 MOTOR & HVAC EQUIPMENT ON ROOF
 SHEET E211
 15. SAME AS ABOVE FOR FCU10-1
 SHEET E212
 16. SAME AS ABOVE FOR UNITS SF11-1, FCU12.5-1, FCU11-2
 & CU12.5-1
 SHEET E213
 17. SAME AS ABOVE FOR AHU12-6, EF12-1
 SHEET E214
 18. SAME AS ABOVE FOR ALL MOTORS AND ELECTRIC WATER
 HEATER IN ROOM 12.508
 SHEET E301A
 19. RETAIL R02 ? LIGHTING ARRANGEMENT AS DESCRIBED DOES
 NOT MEET THE DAYLIGHT ZONE CONTROL REQUIREMENTS OF THE
 FBC-E405.2.2.3
 20. FBC-B 1011.1 EXITS AND EXIT ACCESS SHALL BE MARKED
 BY AN APPROVED EXIT SIGN READILY VISIBLE FROM ANY
 DIRECTION OF EGRESS TRAVEL. THE PATH OF EGRESS SHALL BE
 CLEARLY MARKED WHEN NOT READILY VISIBLE. THERE SHALL
 NOT BE MORE 100? BETWEEN EXIT SIGN ALONG THE PATH OF
 EGRESS.
 21. RETAIL R01 ? LIGHTING ARRANGEMENT AS DESCRIBED DOES
 NOT MEET THE DAYLIGHT ZONE CONTROL REQUIREMENTS OF THE
 FBC-E405.2.2.3
 22. RETAIL R03 ? LIGHTING ARRANGEMENT AS DESCRIBED DOES
 NOT MEET THE DAYLIGHT ZONE CONTROL REQUIREMENTS OF THE
 FBC-E405.2.2.3
 23. DUE TO THE LACK OF ROOM LABELS, ADDITIONAL LIGHTING
 CONTROLS MAY BE REQUIRED
 SHEET E303, E304, E305, E306, E307, E308, E309, E310,
 E311, E312
 24. THIS SHEET DOES NOT CLEARLY INDICATE THE LOCATION
 OF EGRESS DOORS OR UP/DOWN RAMP, THEREFORE PROPER EXIT
 LIGHT LOCATION IS NOT IDENTIFIABLE
 SHEET E314
 25. THIS AREA IS NOT IDENTIFIED ON THE PLANS, THEREFORE
 EXIT LIGHTING AND LIGHTING CONTROL REQUIREMENTS CAN?T
 BE PROPERLY DETERMINED
 SHEET E318
 26. EXIT LIGHT REQUIRED BY ROOF EXIT DOORWAY
 SHEET E501
 27. NEC 210.52(C)(4): (UNITS 6, 2, 04,) AN OUTLET IS
 REQUIRED ON EITHER SIDE OF THIS SINK
 28. NEC 210.70: (UNIT 04) THE AREA LEADING TO THE
 BEDROOM IS MISSING ILLUMINATION
 SHEET E503
 29. NEC 210.52(A)(2): WALL SPACE. ANY WALL SPACE 2 FT.
 OR MORE IN WIDTH SHALL REQUIRE A RECEPTACLE. SEE LIVING
 ROOM OF UNIT 20
 30. NEC 210.52(C)(4): (UNITS 20 ) AN OUTLET IS REQUIRED
 ON EITHER SIDE OF THIS SINK
 31. NEC 110.26(D): ILLUMINATION SHALL BE PROVIDED FOR
 ALL WORKING SPACES ABOUT SERVICE EQUIPMENT,
 SWITCHBOARDS, AND PANELBOARDS. THIS LIGHT SHALL NOT BE
 CONTROLLED BY AUTOMATIC MEANS ONLY. CHECK THE SMC
 CLOSET OF UNIT 20
 32. NEC 210.52(C)(4): (UNITS 18) AN OUTLET IS REQUIRED
 ON EITHER SIDE OF THIS SINK
 33. NEC 210.52 (A)(1): RECEPTACLES SHALL BE INSTALLED
 SUCH THAT NO POINT MEASURED HORIZONTALLY ALONG THE
 FLOOR LINE IN ANY WALL SPACE IS MORE THAN 6 FT. FROM A
 RECEPTACLE OUTLET. THIS INCLUDES THE DISTANCE FROM THE
 EDGE OF THE WALL. A FLOOR BOX IS REQUIRED ALONG THE
 WALL WITH ALL THE WINDOWS IN THE LIVING ROOM OF UNIT 18
 34. NEC 210.52(H): IN DWELLING UNITS, HALLWAYS OF 10 FT
 OR MORE IN LENGTH SHALL HAVE AT LEAST ONE RECEPTACLE
 OUTLET. SEE THE MASTER BEDROOM CORRIDOR OF UNIT 18
 35. NEC 210.52(A)(2): WALL SPACE. ANY WALL SPACE 2 FT.
 OR MORE IN WIDTH SHALL REQUIRE A RECEPTACLE. SEE WALL
 BEHIND MASTER BEDROOM SINK OF UNIT 18
 36. NEC 110.26(D): ILLUMINATION SHALL BE PROVIDED FOR
 ALL WORKING SPACES ABOUT SERVICE EQUIPMENT,
 SWITCHBOARDS, AND PANELBOARDS. THIS LIGHT SHALL NOT BE
 CONTROLLED BY AUTOMATIC MEANS ONLY. SEE AREA IN FRONT
 OF ELECTRICAL PANEL OF UNIT 18.
 SHEET E504, UNIT L1
 37. FBC-RE3901.4: IF THE AREA ADJACENT TO THE
 REFRIGERATOR IS COUNTER SPACE, AN OUTLET IS REQUIRED.
 38. FBC-ER3901.4.1: KITCHEN RECEPTACLE REQUIRED
 39. ARE YOU SURE THAT YOU WANT THE SWITCH FOR THE
 DISPOSAL THAT FAR AWAY FROM THE SINK
 40. FBC-RE3901.2.1: A RECEPTACLE IS REQUIRED NO MORE
 THAN 6? FROM THE WALL EDGE OF THE KITCHEN TO THE LR.
 41. FBC-RE3901.2.1: THE LINEAR WALL SPACE BETWEEN THESE
 TWO OUTLETS EXCEEDS THE 12? RULE OF THE CODE. THIS
 APPLIES TO THE BEDROOM OUTLETS.
 SHEET E504, UNIT L2
 42. SEE UNIT L1 KITCHEN COMMENTS.
 SHEET E504, UNIT L3
 43. SEE UNIT L1 KITCHEN COMMENTS.
 44. SEE UNIT L1 COMMENT 41.
 45. SEE COMMENTS 40 & 41 FOR UNIT L1.
  
 SHEET E505, UNIT L4
 46. SEE COMMENT 37 ABOVE FOR UNIT L1.
 47. SEE COMMENTS 41 ABOVE FOR UNIT L1. LOWER BEDROOM.
 48. PLEASE ABIDE BY THE 6 - 12 RECEPTACLE SPACING RULE
 AND RELOCATE YOUR RECEPTACLES ACCORDINGLY. (UPSTAIRS
 SITTING AREA).
 49. SEE COMMENT 41 ABOVE. UPPER BEDROOM.
 SHEET E505, UNIT L5
 50. SEE COMMENT 39 ABOVE. KITCHEN DISPOSAL
 51. SEE COMMENT 41 ABOVE FOR UNIT L1. LOWER BEDROOM.
 52. SEE COMMENT 41 ABOVE FOR UNIT L1. UPPER BEDROOM.
 53. SEE COMMENT 48 ABOVE FOR UNIT L4. UPPER SITTING
 AREA.
 SHEET E506, UNIT L6
 54. FBC-RE3901.2.1SPACING. RECEPTACLES SHALL BE
 INSTALLED SUCH THAT NO POINT MEASURED HORIZONTALLY
 ALONG THE FLOOR LINE IN ANY WALL SPACE IS MORE THAN 6
 FT. FROM A RECEPTACLE OUTLET. THIS INCLUDES THE
 DISTANCE FROM THE EDGE OF THE WALL. LOWER BEDROOM
 55. FBC-RE3903.4 STORAGE OR EQUIPMENT SPACES. AT LEAST
 ONE LIGHTING OUTLET CONTAINING A SWITCH OR CONTROLLED
 BY A WALL SWITCH SHALL BE INSTALLED WHERE THESE SPACES
 ARE USED FOR STORAGE OR CONTAIN EQUIPMENT REQUIRING
 SERVICING. THE LIGHTING OUTLET SHALL BE PROVIDED AT OR
 NEAR THE EQUIPMENT REQUIRING SERVICING. EWH CLOSET
 56. CAREFUL NOT TO PLACE THIS SWITCH BEHIND THE DOOR TO
 THIS BEDROOM. DOOR TO ROOM NOT DRAWN PLAN. UPPER
 BEDROOM.
 57. FBC-RE3901.2.1: RELOCATE THIS OUTLET TO MEET CODE
 SPACING REQUIREMENTS. UPPER SITTING AREA.
 58. SEE NOTE 54 ABOVE. UPPER BEDROOM.
 SHEET E506, UNIT L7
 59. SEE COMMENT 55 ABOVE. EWH CLOSET
 60. FBC-ER3901.4.4/NEC 210.52(C)(4) COUNTERTOP SPACES
 SEPARATED BY RANGETOPS, REFRIGERATORS, OR SINKS SHALL
 BE CONSIDERED AS SEPARATE COUNTERTOP SPACES IN APPLYING
 THE REQUIREMENTS OF 210.52(C)(1). THEREFORE AN OUTLET
 IS MISSING FROM THIS END OF THE PENINSULA.
 61. SEE COMMENT 57 ABOVE.
  
 62. SHEET E506, UNIT L8
 63. SEE COMMENT 55 ABOVE.
 64. SEE COMMENT 57 ABOVE. BEDROOM & LIVING ROOM
 SHEET E506, UNIT L9
 65. SEE COMMENT 55 ABOVE
 66. SEE COMMENT 57 ABOVE. BEDROOM & LIVING ROOM
 SHEET E507, PENTHOUSE
 67. THIS IS AN INTERIOR BATHROOM AND IT REQUIRES AN
 EXHAUST FAN. IF A NON-CONTINUOUS UNIT IS USED, IT SHALL
 BE CONTROLLED WITH THE LIGHT SWITCH. HALF BATH
 68. ADJUST OUTLETS ALONG THESE WALLS TO MEET CODE
 COMPLIANCE. CURTAIN WALL LIVING ROOM & DINING ROOM.
 69. IN THE INTEREST OF LIFE SAFETY, CONVENIENCE AND
 ENERGY CONSERVATION THESE LIGHTS SHOULD BE ON A 3 WAY
 SWITCH.
 SHEET E507, UNIT 8B
 70. SEE COMMENT 55 ABOVE.
 71. FBC-RE3901.2.2: ANY WALL SPACE 2 FT. OR MORE IN
 WIDTH SHALL REQUIRE A RECEPTACLE. ROOM ADJACENT TO
 KITCHEN
 SHEET E601, E602, E610, APPROVED W/PROVISO
 72. NEC110.26 (D) ILLUMINATION: ILLUMINATION SHALL BE
 PROVIDED FOR ALL WORKING SPACES ABOUT ELECTRICAL
 SERVICE EQUIPMENT INSTALLED INDOORS AND SHALL NOT BE
 CONTROLLED BY AUTOMATIC MEANS ONLY. THIS APPLIES TO ALL
 ROOMS ENLARGED ON THIS SHEET.
 SHEET E701
 73. NEC 110.24: ALL SERVICE EQUIPMENT SHALL BE LEGIBLY
 MARKED IN THE FIELD WITH THE MAXIMUM AVAILABLE FAULT
 CURRENT. THE FIELD MARKING(S) SHALL INCLUDE THE DATE
 THE FAULT CURRENT CALCULATION WAS PERFORMED AND BE OF
 SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT
 INVOLVED.
 74. CLARIFY FEEDER LABELED AS E702D'S DESTINATION. I
 CAN?T FIND IT ON SHEET E702.
 SHEET E703, APPROVED W/PROVISO
 75. FIRE ALARM WORK UNDER SEPARATE PERMIT
 SHEET E1401
 76. THE PANEL SCHEDULE OF N1MSBHA DOES NOT MATCH THE
 RISER DIAGRAM OF SHEET E701.
 77. CORRECT CKT. 17, 19. 21 OF LS1DPH TO MATCH SHEET
 E702 (LS21HA)
 78. PANEL SCHEDULE OF E1DPH DOES NOT MATCH RISER
 DIAGRAM OF SHEET E702
 SHEET E1406
 79. OCP FOR UNIT PENT PANEL DOES NOT MATCH WHAT IS
 REFLECTED ON RISER OF SHEET E701
  
 WHEN RESUBMITTING, FOR A QUICKER RETURN ON YOUR
 RE-SUBMITTAL, PLEASE PROVIDE A RESPONSE LETTER
 (NARRATIVE) ADDRESSING EACH ITEM AND THE PAGE NUMBER
 WHERE THE CORRECTIONS APPEAR ALONG WITH THE STANDARD
 CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PAGES INTO THE SUBMITTAL PACKAGE. MARK VOID
 AND LEAVE THE PREVIOUSLY REVIEWED SHEETS FOR
 COMPARATIVE REVIEW. CLOUDING THE CHANGES WILL BE
 GREATLY APPRECIATED.
  
 IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO
 CONTACT ME DIRECTLY.
 THANK YOU,
 MIKE ALBARRAN
 ELECTRICAL PLANS EXAMINER
 PH: 561-805-6746
 EMAIL: [email protected]
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2016-12-14 Cont ID  
Sent By mgonzale Date 2016-12-14 Time   Rev Time 1.00
Received By mgonzale Date 2016-12-14 Time   Sent To  
Notes
2016-12-14 15:36:48REVISED PLANS DATED 12/14/2016 HAVE BEEN SUBMITTED AND
 APPROVED THRU ENGINEERING.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2016-10-05 Cont ID  
Sent By mgonzale Date 2016-10-05 Time   Rev Time 0.50
Received By   Date 2016-10-05 Time   Sent To HIST
Notes
2016-10-05 09:22:22PLEASE RESPOND TO COMMENTS IN WRITING.
  
 BACKFLOWS MUST BE AS CLOSE TO CITY OF WPB SOURCE AS
 POSSIBLE.
  
 IF BACKFLOWS ARE SHOWN IN THE CLOSEST LOCATION AS
 POSSIBLE, REPLY IN WRITING TO THIS COMMENT SO THAT A
 MEETING CAN BE ARRANGED WITH UTILITIES CUSTOMER SERVICE
 TO GET A VARIANCE IF THERE IS LEGITIMATE HARDSHIP. AN
 ENLARGE VIEW OF THE WATER METER AND BACLFLOWS LOCATIONS
 MAY BE ADEQUATE TO BETTER DESCRIBE THE CLEARANCES
 AROUND THESE CONSTRICTED AREAS. ENOUGH CLEARANCE SHALL
 BE (18") AROUND THE DEVICES TO ALLOW PROPER MAINTENANCE
 SPACE. BACKFLOWS JUST INSIDE BUILDING OR HARD SURFACE
 SHALL HAVE A FLOOR DRAIN TO AVOID FLOODING WHEN
 BACKFLOWS ARE NOT WORKING PROPERLY OR WHEN ROUTINE
 MAINTENANCE IS REQUIRED.
  
 SUBMIT SHOP DRAWINGS FOR DCDA AND RPPA FOR DOMESTIC,
 FIRE, IRRGIGATION. ETC./IMPORTANT MESSAGE: AS OF
 DECEMBER 20, 2015 THE CITY OF WEST PALM BEACH.
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED MAKING
 KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD FREE."
 FOR MORE INFORMATION REFER TO THE LINK BELOW: HTTP://WP
 B.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLICATIONS/B
 ACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2017-01-09 Cont ID  
Sent By pleduc Date 2017-01-09 Time   Rev Time 0.00
Received By pleduc Date 2016-12-29 Time 09:55 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2016-11-23 Cont ID  
Sent By pleduc Date 2016-11-23 Time   Rev Time 0.00
Received By pleduc Date 2016-10-28 Time 14:25 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2016-09-09 Cont ID  
Sent By pleduc Date 2016-09-09 Time   Rev Time 0.00
Received By pleduc Date 2016-08-12 Time 09:56 Sent To  
Notes
2016-09-09 13:47:03THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) THIS PLAN SET NEEDS TO BE UPDATED WITH THE SUBMITTED
 REVISIONS OF PERMIT # 16040755.
  
  
 2) PLEASE PROVIDE PLAN SHEET REVISION CLOUDS OR
 NUMBERED NARRATIVE RESPONSES TO THE ABOVE.
  
 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 3 Status P Date 2017-01-24 Cont ID  
Sent By tklarge Date 2017-01-24 Time 13:44 Rev Time 0.00
Received By tklarge Date 2017-01-24 Time 04:28 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2016-11-29 Cont ID  
Sent By tklarge Date 2016-11-28 Time 09:48 Rev Time 0.00
Received By tklarge Date 2016-11-28 Time 05:35 Sent To  
Notes
2016-11-27 08:14:021) SHT. P717 SHOWS( 2 )-2 1/2 INCH LINES TO THE RETAIL
 SPACE. SHOW HOW THESE LINES CONNECT TO THE GAS MAIN.
 WPB AMEND. TO FBC SEC. 107.3.5.1.5. FUTURE LINES SHALL
 BE EQUIPPED WITH REGULATORS AND THE OUTLET FROM THE
 REGULATOR SHALL HAVE A NIPPLE, VALVE AND CAP INSTALLED.
 THE REGULATOR VENT OUTLET SHALL BE CAPPEDOR PLUGGED
 UNTIL PUT INTO USE.
 2) SHOW THE APPROXIMATE DISTANCE OF THE RUN OF THE PIPE
 TO THE RETAIL SPACE FROM THE METER.WPB AMEND. TO FBC
 SEC. 107.2.1.
 3) SHT.P718 REFERS TO A DETAIL FOR THE SHUTOFF VALVE
 FOR THE APPLIANCE AT THE AMENITIES AND ALSO FOR THE
 SHUTOFF VALVE FOR THE POOL EQUIPMENT. SPECIFIY THE
 SHEET WHERE THIS DETAIL CAN BE FOUND. I DID NOT FIND IT
 ON ANY OF THE DETAIL SHEETS.
 4) PLACE THE TOTAL BTU LOAD FOR EACH SYSTEM IN THE
 APPROPRIATE SYSTEM SIZING BOX ( SYSTEM #1, #2 #3 ). IT
 IS TIME CONSUMNING ADDDING IT UP ON THE RISERS AND THIS
 WILL AID IN THE RE-EVIEW TIME FOR THE GAS.WPB AMEND. TO
 FBC SEC. 107.2.1.
 5) REFER TO THE SHEET NUMBER FOR THE CONTINUATION OF
 THE GAS RISERS, NOT JUST THE LETTER.WPB AMEND. TO FBC
 SEC. 107.2.1.
 6) SHOW THE CONNECTION POINT OF THE RISER Q-Q TO THE
 MAIN GAS SYSTEM AND REFERENCE THE SHEET NUMBER.WPB
 AMEND. TO FBC SEC. 107.2.1.
 7) SHT.P719 - THE SIZING SYSTEM BOXES REFER TO THE 2009
 IFC. THE FUEL GAS CODE IN EFFECT IS THE 2014 FBC-FUEL
 GAS.
 8) SHT. P719 - SIZING SYSTEM #1 BOX - THE GAS TABLE
 REFERENCED, 402.3 (3) IS FOR LESS THAN 2 PSI IN THE FBC
 FUEL GAS BUT THE TEXT IN THE BOX STATES THE SYSTEM IS A
 2 PSI SYSTEM WITH A PRESSURE DROP OF 1.0 PSI. CLARIFY.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2016-09-08 Cont ID  
Sent By gjohnson Date 2016-09-08 Time 14:41 Rev Time 0.00
Received By gjohnson Date 2016-09-08 Time 14:41 Sent To  
Notes
2016-09-08 14:57:101ST REVIEW
  
  
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
  
 GAS COMMENTS:
  
 1. SHOW ALL CUT SECTIONS OF PIPE AND CORRESPONDING
 LENGTHS PER FBC-2014 FUEL GAS, SECS. 402.4.1, 402.4.2.
  
 2. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL
 GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA
 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2
  
 3. THE SYSTEM IS TO BE DESIGNED AND SIZED PER IFGC 2014
 OR FBC FG 2014 5TH EDITION. CHECK TABLE NUMBERS THEY
 HAVE CHANGED.
  
 4. PROVIDE SHUT OFF AND DRIP LEG AT EACH APPLIANCE. PER
 FBC FG
 408.4 SEDIMENT TRAP.
 WHERE A SEDIMENT TRAP IS NOT INCORPORATED AS PART OF
 THE APPLIANCE, A SEDIMENT TRAP SHALL BE INSTALLED
 DOWNSTREAM OF THE APPLIANCE SHUTOFF VALVE AS CLOSE TO
 THE INLET OF THE APPLIANCE AS PRACTICAL. THE SEDIMENT
 TRAP SHALL BE EITHER A TEE FITTING HAVING A CAPPED
 NIPPLE OF ANY LENGTH INSTALLED VERTICALLY IN THE
 BOTTOMMOST OPENING OF THE TEE AS ILLUSTRATED IN FIGURE
 408.4 OR OTHER DEVICE APPROVED AS AN EFFECTIVE SEDIMENT
 TRAP. ILLUMINATING APPLIANCES, RANGES, CLOTHES DRYERS,
 DECORATIVE VENTED APPLIANCES FOR INSTALLATION IN VENTED
 FIREPLACES, GAS FIREPLACES, AND OUTDOOR GRILLS NEED NOT
 BE SO EQUIPPED.
 409.5 APPLIANCE SHUTOFF VALVE.
 EACH APPLIANCE SHALL BE PROVIDED WITH A SHUTOFF VALVE
 IN ACCORDANCE WITH SECTION 409.5.1, 409.5.2 OR 409.5.3.
  
 5. PROVIDE LENGTH AND SIZE OF PIPING TO POOL EQUIPMENT.
 PER FBC-2014 FUEL GAS, SECS. 402.4.1, 402.4.2.
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2017-01-24 Cont ID  
Sent By shill Date 2017-01-24 Time 14:27 Rev Time 0.00
Received By shill Date 2016-12-21 Time 09:25 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-12-21 Cont ID  
Sent By cpuell Date 2016-12-21 Time 11:09 Rev Time 0.00
Received By cpuell Date 2016-10-27 Time 14:46 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-10-12 Cont ID  
Sent By lmarchan Date 2016-10-12 Time 07:40 Rev Time 0.00
Received By lmarchan Date 2016-08-04 Time 15:05 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2016-11-19 Cont ID  
Sent By shill Date 2016-11-19 Time 09:34 Rev Time 0.00
Received By shill Date 2016-11-16 Time 14:21 Sent To  
Notes
2016-11-19 09:13:47MU 2016 18622
 MU 2016 18623
  
 RECEIPTS (ALSO WITH PERMIT 16040755) ROUTED TO RECORDS
 PLAN PAGES FROM IMPACT FEE REVIEW W/PALM BEACH COUNTY
 ROUTED TO RECORDS (SHEETS A300 THROUGH A318, A500)
 SHEETS SUBMITTED TO IMPACT HAVE A "PROGRESS SET" DATE
 OF 7/6/16; SHEETS IN PROJECTDOX HAVE A "PERMIT SET"
 DATE OF 11/20/16. PAGES APPEAR THE SAME, IN PARTICULAR
 SHEET A500. VERIFIED THAT SQ FT AREA AND UNIT TOTALS
 ARE IDENTICAL.
  
  
  
  
  
  
2016-11-17 14:21:39IMPACT FEES GUVEN TO SHILL

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2016-09-07 Cont ID  
Sent By shill Date 2016-09-07 Time 11:42 Rev Time 0.00
Received By shill Date 2016-09-07 Time 11:42 Sent To  
Notes
2016-09-07 11:45:24****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 IMPACT FEE ASSESSMENT BY PALM BEACH COUNTY REQUIRED.
 CONTACT 561-233-5025 FOR MORE INFORMATION. A PLAN
 STAMPED BY THE COUNTY AND THE RECEIPT SHOWING THAT FEES
 DUE HAVE BEEN PAID ARE TO BE PROVIDED.
  
  

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2017-01-13 Cont ID  
Sent By ccole Date 2017-01-13 Time 15:46 Rev Time 0.00
Received By ccole Date 2017-01-11 Time 07:49 Sent To  
Notes
2017-01-13 15:50:45MECHANICAL PROVISOS:
 PERMIT #16070715
 1/13/17
  
 1) REVISE SHEETS M204, M206, M208, M502, M503, M504,
 M505, M506, M507, & M601 TO SHOW ALL OUTSIDE AIR DUCT
 RUNS AND REQUIRED AUTOMATIC SHUTOFF DAMPERS.
  
 2) PROVIDE REFRIGERANT PIPING RISER DIAGRAMS FOR THE
 SPLIT AC SYSTEMS
  
 3) FINAL COMMISSIONING REPORT:
 A REPORT OF TEST PROCEDURES AND RESULTS IDENTIFIED AS
 "FINAL COMMISSIONING REPORT" SHALL BE DELIVERED TO THE
 BUILDING OWNER AND SHALL INCLUDE:
 1. RESULTS OF FUNCTIONAL PERFORMANCE TESTS.
 2. DISPOSITION OF DEFICIENCIES FOUND DURING TESTING,
 INCLUDING DETAILS OF CORRECTIVE MEASURES USED OR
 PROPOSED.
 3. FUNCTIONAL PERFORMANCE TEST PROCEDURES USED DURING
 THE COMMISSIONING PROCESS INCLUDING MEASURABLE CRITERIA
 FOR TEST ACCEPTANCE, PROVIDED HEREIN FOR REPEATABILITY.
 EXCEPTION: DEFERRED TESTS WHICH CANNOT BE PERFORMED AT
 THE TIME OF REPORT PREPARATION DUE TO CLIMATIC
 CONDITIONS.
  
 4) PROVIDE A SIGNED AND SEALED COPY OF THE SMOKE
 CONTROL SYSTEM RATIONAL ANALYSIS BY JAMES S. LUKE P.E.
 COMMISSIONING OF THE SMOKE CONTROL SYSGTEMS REQUIRED AT
 FINAL INSPECTION.
  
 5) SEPARATE PERMITS ARE REQUIRED FOR FIRE SPRINKLER,
 FIRE SUPPRESSION, KITCHEN HOOD EXHAUST SYSTEMS, AND
 WALK-IN COOLERS AND FREEZERS.
  
 6) REQUIRED SUBMITTALS:
 A) STAIRWAY PRESSURIZATION FANS.
 B) CORRIDOR EXHAUST FAN.
 C) SMOKE EXHAUST DUCTWORK.
 D) FIRE/SMOKE AND FIRE DAMPERS.
 E) WINDLOAD ENGINEERING FOR INSTALLATION OF ALL ROOFTOP
 MECHANICAL EQUIPMENT, CURBS, STANDS,
 DUCTS, AND SUPPORTS
 F) MOTORIZED DAMPERS.
 G) OUTSIDE AIR AND EXHAUST LOUVERS AND TERMINATION
 CAPS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  
  
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2016-11-17 Cont ID  
Sent By ccole Date 2016-11-17 Time 16:51 Rev Time 0.00
Received By ccole Date 2016-11-15 Time 15:03 Sent To  
Notes
2016-11-17 16:54:142ND REVIEW FBC-2014 MECHANICAL
 PERMIT #16070715
 11/16/17
  
 1) REFER TO PAGE 11 OF THE SMOKE CONTROL RATIONAL
 ANALYSIS AND PROVIDE SUBMITTALS FOR ALL OF THE SMOKE
 CONTROL FANS AND DAMPERS WITH SHOP DRAWING APPROVAL
 SIGNATURES BY THE ENGINEER OF RECORD. PLACE NOTES IN
 THE FAN SCHEDULES CORRELATING TO THE REQUIREMENTS
 LISTED FOR SMOKE-CONTROL FANS INCLUDING UL LISTINGS AND
 ITEMS 1.A, B, & C IN THE ANALYSIS. PROVIDE AN EQUIPMENT
 SCHEDULE ON THE PLANS FOR ALL DAMPERS INVOLVED WITH THE
 SMOKE CONTROL SYSTEM.
  
 2) ON PAGE 4 OF THE RATIONAL ANALYSIS UNDER ITEM II
 SYSTEM PURPOSE, THE LOCATION OF THE BUILDING IS
 INCORRECTLY IDENTIFIED AS MIAMI, FL. AND ATTACHMENT C
 IS ALSO INCORRECTLY LISTING DESIGN CONDITIONS FOR
 MIAMI.
  
 3) THE RATIONAL ANALYSIS DOES NOT INCLUDE ANY DESIGN
 AND CONTROL OPERATION INFORMATION FOR THE TOWER
 CORRIDOR SMOKE CONTROL AND EXHAUST SYSTEMS AS DEPICTED
 ON SHEET M703. THESE SYSTEMS INVOLVE THE USE OF THE DOA
 UNITS WHICH ARE PROVIDING BOTH THE OUTSIDE AIR TO THE
 CORRIDORS AND APARTMENTS, AND ALSO MAKE-UP AIR FOR THE
 SMOKE EXHAUST AND PRESSURIZATION OF THE CORRIDORS.
  
 PLEASE ADDRESS THE FOLLOWING COMMENTS:
  
 A) IT APPEARS BY THE NOTES IN THE SEQUENCE OF OPERATION
 THAT ALL CORRIDORS WILL BE PRESSURIZED DURING AN ALARM,
 INCLUDING THE CORRIDOR AT THE FLOOR OF INCIDENT WHICH
 IS ALSO BEING EXHAUSTED. IS THIS CORRECT?
  
 B) PRESSURIZATION OF THE APARTMENTS IS NOT INDICATED IN
 THE SEQUENCE OF OPERATION ON M703, HOWEVER THE NOTES BY
 THE DOA TA-1 & TA-2 RISER DRAWINGS ON M702 INDICATE THE
 SYSTEMS ARE ALSO INCLUDED IN THE SMOKE CONTROL
 SEQUENCE- PLEASE CLARIFY.
  
 C) REFER TO SECTION 909.10 (513.10- FMC) WHICH REQUIRES
 THE DOA'S TO BE "SUITABLE FOR THE PROBABLE EXPOSURE
 TEMPERATURES THAT THE RATIONAL ANALYSIS INDICATES".
 PROVIDE DATA INDICATING THE SELECTED UNITS ARE IN
 COMPLIANCE.
  
 D) REFER TO SECTION 909.10.5 (513.10.1) WHICH REQUIRES
 A MINIMUM OF TWO BELTS FOR THE DOA FANS (IF THE FANS
 ARE BELT DRIVEN).
  
 E) REFER TO SECTION 909.10.2 AND VERIFY THE SPECIFIED
 DUCTWORK FOR THE SYSTEMS ARE IN COMPLIANCE FOR
 TEMPERATURE AND DESIGN PRESSURE RATINGS.
  
 4) REFER TO SECTION 403.4.7 FBC-14 BUILDING AND
 INDICATE HOW SMOKE REMOVAL WILL BE ACCOMPLISHED AT
 FLOORS 1-11 INCLUDING THE EAST AND WEST LINER
 APARTMENTS. PROVIDE DETAILS ON THE PLAN AND NOTES IN
 THE RATIONAL ANALYSIS.
  
 5) REVISED ENERGYGAUGE PERFORMANCE COMPLIANCE
 SUBMITTAL:
  
 A) 2ND REQUEST FOR OWNER/AGENT SIGNATURE TO BE PROVIDED
 ON PAGE 3.
  
 B) COOLING CAPACITIES SHOWN IN THE CALCS FOR AC E-1, AC
 E-2, AC E-3, AC 1-C, AC 2-F, & AC 2D DO NOT MATCH
 CAPACITIES SHOWN IN THE SCHEDULE ON M1301.
  
 C) COOLING AND HEATING CAPACITIES FOR FCU-2-2 SHOWN IN
 THE CALCS DON'T MATCH THE CAPACITIES SHOWN IN THE
 SCHEDULE (COOLING IN THE CALCS- 8100 BTUH, COOLING IN
 THE SCHEDULE- 120,000 BTUH).
  
 D) FCU 1-6 IS IN THE CALCS BUT IS NOT INDICATED IN THE
 SCHEDULE.
  
 E) AHU'S-12-1,2,3,4,5 & 6 ARE LISTED AS HEAT PUMPS IN
 THE CALCS BUT LISTED AS STRAIGHT COOL UNITS WITH HEAT
 STRIPS IN THE SCHEDULE.
  
 F) FCU-25-1 IS IN THE CALCS BUT NOT IN THE SCHEDULE.
  
 G) UNABLE TO VERIFY DIGITAL SIGNATURES TO BE VALID.
  
 6) AC CALCULATIONS:
  
 A) THE LT SYSTEMS (36.6MBH/ 7.5KW) SELECTED FOR UNITS
 W01- W04 ARE OVERSIZED FOR COOLING AND HEATING PER THE
 CALCS.
  
 B) THE L-2 SYSTEM SELECTED FOR W205 & W206 ARE
 OVERSIZED FOR COOLING.
  
 C) THE 2-F SYSTEM FOR TOWER UNIT 18 IS OVERSIZED FOR
 COOLING.
  
 D) THE 2-F SYSTEM FOR THE PENTHOUSE IS UNDERSIZED FOR
 COOLING.
  
 E) DIGITAL SIGNATURES REQUIRED ON THE CALCULATIONS.
  
 7) PLEASE PLACE THE EXHAUST FAN SIZING CALCULATION
 TABLE THAT WAS ATTACHED TO THE NARRATIVE ON SHEET
 M1303.
  
 8) M201: THE CORRIDOR SHALL NOT BE USED TO CONVEY
 RETURN AIR. PLEASE REMOVE THE RETURN TRANSFERS FROM THE
 MAIL AND PACKAGE ROOMS.
  
 9) M201: 2ND REQUEST FOR REQUIRED O/A INLET AND EXHAUST
 OUTLET CLEARANCES TO BE NOTED ON THE PLANS WITH
 MEASUREMENTS- SEE SECTION 501.3.1. THIS REQUEST
 INCLUDES THE GENERATOR RADIATOR EXHAUST.
  
 10) M201: FIRE DAMPER REQUIRED FOR THE AIR INTAKE
 LOUVER IN THE 2HR. FIRE-RATED GENERATOR ROOM WALL-
 SECTION 607.5.2 FBC-14 MECHANICAL, SECTION 4.1.2.1.5
 NFPA 37.
  
 11) M201: THE NARRATIVE RESPONSE INDICATES AN EXHAUST
 VENTILATION RATE OF 1 CFM/SF FOR THE GENERATOR ROOM,
 HOWEVER THE ROOM HAS NOT BEEN EQUIPPED WITH A FAN.
  
 12) M201: SHOW LOCATIONS OF ACCESS PANELS FOR ANY FCU'S
 INSTALLED ABOVE HARD CEILINGS, AND PROVIDE DETAILS FOR
 CONSTRUCTION OF THE PANELS.
  
 13) M201: CLARIFY WHICH EXCEPTION TO THE CODE IS BEING
 USED FOR THE OMITTED FIRE DAMPERS FOR DUCTS PENETRATING
 THE FIRE-RATED CORRIDOR AND ROOM WALLS. THE FBC SECTION
 716.5.2 EXCEPTION CITED IN THE NARRATIVE IS FROM THE
 2010 CODE AND IS NOT APPLICABLE. PLACE THE SECTION(S)
 NUMBERS IN THE NOTES AND PROVIDE A FIRESTOPPING
 ASSEMBLY FOR THE PENETRATIONS.
  
 14) M201: WHERE FIRE AND FIRE/SMOKE DAMPERS ARE
 PROVIDED, PLACE A NOTE INDICATING WHERE DETAILS FOR
 INSTALLATION OF THE DAMPERS AND EQUIPMENT SCHEDULES CAN
 BE FOUND IN THE PLANS.
  
 15) M203: LABEL THE AC SYSTEMS SHOWN IN THE LEASING
 OFFICE AND ADJOINING ROOMS.
  
 16) M203: REFER TO COMMENTS 12, 13, & 14 ABOVE AND SHOW
 COMPLIANCE ON THIS LEVEL.
  
 17) M203: IN REFERENCE TO COMMENT #11 FROM THE 1ST
 REVIEW REGARDING THE GREASE DUCT TERMINATION AT THE
 GARAGE WALL, PLEASE PLACE THE RESPONSE NOTES TO THIS
 COMMENT IN THE NARRATIVE ON THE PLAN AT THE GREASE DUCT
 LOCATION.
  
 18) COMMENT #11B & 12 FROM THE 1ST REVIEW STILL EXISTS:
 AS PREVIOUSLY REQUESTED PROVIDE EXHAUST VENTILATION FOR
 THE TRASH CHUTE VESTIBULES SHOWN ON M204, 205, 206, 207
 & 208. THE CODE DOES NOT MAKE ANY DISTINCTION BETWEEN
 TRASH ROOMS AND TRASH VESTIBULES. THIS COMMENT ALSO
 APPLIES TO THE VESTIBULES IN THE TOWER.
  
 19) M204: OUTSIDE AIR IS NOT BEING SUPPLIED TO THE TWO
 NORTHERNMOST UNITS AT THE WEST LINER. THE UNIT NUMBERS
 ARE NOT IDENTIFIED (WHICH WAS A PREVIOUS IGNORED
 REQUEST) HOWEVER THEIR FLOOR PLANS ARE TAGGED- 1//M505
 & 3/M504.
  
 20) M204, 205, 206, 207, 208, & 209: REFER TO COMMENTS
 12, 13, & 14 ABOVE AND SHOW COMPLIANCE ON THESE LEVELS.
  
 21) M210: PLEASE PROVIDE EXTERIOR DUCTWORK
 SPECIFICATIONS IN THE NOTES.
  
 22) M211: THE EXHAUST FROM THE BIKE STORAGE ROOM MUST
 DISCHARGE TO THE OUTDOORS PER SECTION 501.3.
  
 23) M212: THE EXHAUST FROM THE POOL EQUIPMENT ROOM AND
 THE TOILET ROOM MUST DISCHARGE TO THE OUTDOORS- SECTION
 501.3.
  
 24) M212: PROVIDE VENTILATION FOR THE FIREMAN'S LIFT
 LOBBY 1104.
  
 25) M212: LABEL ALL OF THE STAIRWELLS.
  
 26) M212: CLARIFY THE USE OF THE GARAGE 1100 AREA. IT
 DOES NOT APPEAR THAT A CAR CAN ACCESS THE AREA.
  
 27) M213: MISSING FSD'S: A) 14X8" EXHAUST DUCT CROSSING
 THE FIRE-RATED CORRIDOR AT THE POOL BATHROOM. B) 10X10
 CORRIDOR TRANSFER AT THE MEN'S R.R. C) 10" ROUND DUCT
 PENETRATING CORRIDOR AT THE FITNESS CENT. D) FLEX DUCTS
 FROM THE YOGA ROOM PENETRATING THE FIRE-RATED CORRIDOR
 LEADING OUT TO THE POOL. E) PLEASE REVIEW ENTIRE FLOOR
 LEVEL AND REVISE TO SHOW LOCATIONS OF ALL REQUIRED
 DAMPERS.
 .
 30) M213: REFER TO COMMENTS 12, 13, & 14 ABOVE AND SHOW
 COMPLIANCE ON THIS LEVEL.
  
 31) M503: THE 8" DUCTS SUPPLYING 275 CFMS OF SUPPLY AIR
 IN UNIT 20 APPEAR TO BE UNDERSIZED WHEN CHECKED WITH
 THE TRANE DUCTOLATOR AT 0.1" W.C..
  
 32) M504: THE 8" DUCT SUPPLYING 300 CFMS OF SUPPLY AIR
 IN UNITS W01 & W206 APPEAR TO BE UNDERSIZED WHEN
 CHECKED WITH THE TRANE DUCTOLATOR AT 0.1" W.C..
  
 33) M505: THE 8" DUCT SUPPLYING 300 CFMS OF SUPPLY AIR
 IN UNITS W02 & W03 APPEAR TO BE UNDERSIZED WHEN CHECKED
 WITH THE TRANE DUCTOLATOR AT 0.1" W.C..
  
 34) M506: A) 8" DUCT SUPPLYING 300 CFMS IN UNIT W04
 UNDERSIZED. B) 8" DUCTS SUPPLYING 275 CFMS OF SUPPLY
 AIR IN UNIT E01 UNDERSIZED. C) 8" DUCT SUPPLYING 500
 CFMS OF SUPPLY AIR IN UNIT E02 UNDERSIZED.
  
 35) M507: A SMOKE DETECTOR MUST BE INSTALLED IN THE
 RETURN AIR SYSTEMS OF AC-2F IN ACCORDANCE WITH 606.2.1
  
 36) PLEASE PLACE A NOTE ON ALL UNIT PLANS TO INDICATE
 ALL AC CLOSET DOORS SHALL BE OF NON-COMBUSTIBLE
 MATERIALS. A) PROVIDE FL. PRODUCT APPROVALS AND/OR
 MIAMI-DADE NOA'S FOR THE DRYER VENT- SKU-DB-425, AND
 THE EV-2 SHOWN IN THE DRAWINGS.
  
 37) DEFERRED SUBMITTALS, AS REQUESTED BY THE DESIGN
 TEAM, ARE ACCEPTED FOR WIND LOAD ENGINEERING AND
 INSTALLATION OF ALL EXTERIOR MECHANICAL EQUIPMENT AND
 COMPONENTS, FOR ALL EQUIPMENT AND COMPONENTS ASSOCIATED
 WITH THE SMOKE CONTROL SYSTEM, AND FOR ALL OTHER HVAC
 EQUIPMENT .AND COMPONENTS. PLEASE PROVIDE A DOCUMENT
 LISTING ALL SUBMITTALS TO BE DEFERRED. PLEASE NOTE THAT
 FINAL CO WILL ALSO BE CONTINGENT ON RECEIVING THE
 COMMISSIONING REPORT.
  
 A) DEFERRED SUBMITTAL: 107.3.4.2 DEFERRED SUBMITTALS.
 FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS
 ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE
 NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT
 ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A
 SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL
 HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION
 DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
  
 B) DEFERRED SUBMITTAL. 2010 FBC 107.3.4.1 PRODUCT
 APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED BY THE
 DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN
 WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL
 FOR JURISDICTIONAL APPROVAL.
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2016-09-23 Cont ID  
Sent By ccole Date 2016-09-23 Time 13:52 Rev Time 0.00
Received By ccole Date 2016-08-22 Time 16:33 Sent To  
Notes
2016-09-23 13:56:321ST REVIEW FBC-2014 MECHANICAL, ENERGY CONSERVATION
 CODES
 PERMIT #16070715
 ALL ABOARD FLORIDA/ THE BRIGHTON
 9/22- 9/23/16
  
 1) REFER TO SECTION 513.4: A RATIONAL ANALYSIS
 SUPPORTING THE TYPES OF SMOKE CONTROL SYSTEMS TO BE
 EMPLOYED, THEIR METHODS OF OPERATION, THE SYSTEMS
 SUPPORTING THEM AND THE METHODS OF CONSTRUCTION TO BE
 UTILIZED SHALL ACCOMPANY THE SUBMITTED CONSTRUCTION
 DOCUMENTS AND SHALL INCLUDE, BUT NOT BE LIMITED TO THE
 ITEMS INDICATED IN SECTIONS 513.4.1 THROUGH 513.19
 PLEASE PROVIDE THE ANALYSIS.
  
 2) REFER TO SECTION C407 FBC-14 ENERGY CONSERVATION. A)
 THE UPLOADED ENERGYGAUGE SUMMIT TOTAL BUILDING
 PERFORMANCE COMPLIANCE DOCUMENT SHALL BE SIGNED BY THE
 DESIGN PROFESSIONALS AND THE OWNER/AGENT. THE DOCUMENT
 SHALL ALSO BEAR THE ELECTRONIC SIGNATURE OF THE DESIGN
 PROFESSIONAL. B) THE SUBMITTED AC PEAK COOLING LOAD
 CALCULATIONS ARE INCOMPLETE, AND NOT IN COMPLIANCE WITH
 THE REQUIREMENTS FOR THERMAL BLOCK LOAD DESIGN AS
 LISTED UNDER SECTIONS C407.5.2 THROUGH C407.5.2.3.
 PLEASE REVIEW AND PROVIDE CALCULATIONS AND DIAGRAMS IN
 COMPLIANCE. C) COMPLETE THE MANDATORY REQUIREMENTS
 CHECK LIST ON PAGE 35 OF THE SUBMITTAL.
  
 3) REFER TO SECTIONS C408 .1 THROUGH C408.3 AND PROVIDE
 A COMMISSIONING PLAN FOR THE MECHANICAL AND ELECTRICAL
 POWER AND LIGHTING SYSTEMS.
  
 4) THE ENERGYGAUGE SUBMITTAL DOC INDICATES RTU #4 AT
 85,000 BTUH, HOWEVER IT IS LISTED AS 71,000 IN THE AC
 SCHEDULE ON SHEET M1301.
  
 5) THE ENERGYGAUGE DOC LISTS HEATING COMPLIANCE DATA
 FOR THE VRF-FCU?S, HOWEVER THERE IS NO HEAT SHOWN IN
 THE SCHEDULE FOR THESE UNITS ON M1302.
  
 6) M1303 & M501: PLEASE CLARIFY HOW UNITS AC-2-A, 2-B,
 & 2-C CAN HAVE POSITIVE RESULTANT AIR BALANCES WHEN
 THERE IS MORE EXHAUST CFMS IN THE UNITS THEN O/A CFMS.
 PLEASE NOTE THE REQUIRED KITCHEN EXHAUST CFMS ARE NOT
 INCLUDED IN THE CALCULATIONS, AND NO EXHAUST IS SHOWN
 ON THE FLOOR PLANS. ADDITIONAL ISSUES CONCERNING THE
 UNIT MECHANICAL SYSTEMS WILL BE ADDRESSED LATER IN THIS
 REVIEW.
  
 7) M1303: CONCERNING THE AIR BALANCE SCHEDULE, PLEASE
 CLARIFY HOW THE "ACTUAL E.A. CFM" HAS BEEN CALCULATED.
  
 8) M1301: CLARIFY HOW EACH OF THE EXHAUST FANS SHOWN IN
 THE SCHEDULE WERE SIZED- PROVIDE CALCULATIONS IN
 ACCORDANCE WITH TABLE 403.3, OR ASHRAE-62.1.
  
 9) M201: A) FIRE DAMPER MISSING AT THE 8 FT. DUCT
 PENETRATING THE LOBBY/PACKAGE RM WALL. B) PROVIDE O/A
 TO THE FIRE COM. ROOM. C) VERIFY REQUIRED CLEARANCES
 FOR ALL AIR INTAKES ON THE NORTH WALL- SEE SECTION
 401.4. INDICATE HOW THE INTAKE OPENINGS WILL BE
 PROTECTED- SEE SECTION 401.5.
 D) VERIFY REQUIRED CLEARANCES FOR THE GENERATOR AND ALL
 OTHER EXHAUST TERMINATIONS ON THE NORTH WALL PER
 SECTION 501.3.1 & 501.3.1.1. PLEASE NOTE A301 SHOWS AN
 ACCESSIBLE ROUTE ALONG THE NORTH SIDE OF THE BUILDING.
 E) PROVIDE EXHAUST VENTILATION CALCULATIONS FOR THE
 GENERATOR ROOM.
 10) ADVISORY: PLEASE IDENTIFY ALL ROOMS AND SPACES, AND
 STAIRWELLS ON THE MECHANICAL PLANS AND, IF POSSIBLE,
 OVERLAY ALL FIRE-RATED WALLS AND SHAFTS FROM THE LIFE
 SAFETY PLAN. THIS WOULD GREATLY HELP SPEED UP THE
 REVIEW PROCESS.
  
 11) M203: A) REFER TO SECTION 506.3.13.2 AND INDICATE
 COMPLIANCE FOR THE GREASE EXHAUST TERMINATION SHOWN AT
 THE SOUTH WALL. B) PROVIDE EXHAUST VENTILATION FOR THE
 TRASH ROOM- SEE TABLE 6-4 ASHRAE 62.1.
  
 12) M204, M205, M206, M207, M208: PROVIDE EXHAUST
 VENTILATION FOR THE TRASH ROOMS- TABLE 6-4 ASHRAE 62.1.
  
 13) M205, M207, M209, M210, M211, M212: REQUIRED
 VENTILATION FOR THE FIREMAN?S LIFT LOBBIES NOT SHOWN.
  
 14) M206: SHOW THE CONDENSATE PIPING RUN AND DISCHARGE
 LOCATION FOR FCU-5-3.
  
 15) M208: SHOW THE CONDENSATE PIPING RUN AND DISCHARGE
 LOCATION FOR FCU-7-1.
  
 16) M210 & M1301: CORRECT THE DOAS-5 LOCATION IN THE
 SCHEDULE TO LEVEL 9 ROOF.
  
 17) M210: PROVIDE A DUCT SMOKE DETECTOR SYMBOL AT THE
 RETURN AIR DUCT TO RTU-3.
  
 18) M210: SHOW THE SIZES OF THE BRANCH DUCTS CONNECTING
 TO THE MAIN TRUNK LINE OF DOAS-4
  
 19) M210: PROVIDE A KEY NOTE AT EACH DOAS DUCT DROP.
  
 20) M210: SHOW THE CONDENSATE PIPING RUN AND DISCHARGE
 LOCATION FOR FCU?S 9-1, 9-2, & 9-3.
  
 21) M210: WIND LOAD TIE DOWN ENGINEERING IS REQUIRED
 FOR INSTALLATION OF THE ROOF TOP MECHANICAL EQUIPMENT
 INCLUDING THE O/A UNITS, RTU?S, CONDENSERS AND
 CONDENSER STANDS, FANS,
 DUCTWORK AND LOUVERS. PROVIDE KEY NOTES ON THE PLAN
 INDICATING WHERE THE DETAILS FOR INSTALLATIONS ARE
 LOCATED, AND SUBMIT FL. PRODUCT APPROVALS AND
 MIAMI-DADE NOA?S FOR THE STANDS, CURBS, AND LOUVER-
 SECTION 301.15 AND FLORIDA DEPARTMENT OF COMMUNITY
 AFFAIRS RULE 9N-3
  
 22) M211: SHOW THE CONDENSATE PIPING RUN AND DISCHARGE
 LOCATION FOR FCU-10-1.
  
 23) M211: INDICATE HOW THE BIKE STORAGE AREA WILL BE
 VENTILATED.
  
 24) M211: IDENTIFY THE AREA AND THE SHAFTS SHOWN TO THE
 EAST OF STAIR #2.
  
 25) M212: REFER TO SECTION 304.3.1 AND PROVIDE A
 VESTIBULE FOR THE POOL EQUIPMENT ROOM. A) PROVIDE A
 FIRE DAMPER FOR THE EXHAUST DUCT PENETRATING THE
 FIRE-RATED POOL EQUIPMENT ROOM WALL- SECTION 607.5.2.
 B) REFER TO SECTION 454.1.5.8 FBC-14 BUILDING AND
 INDICATE WHERE THE POOL CHEMICALS WILL BE STORED AND
 THEIR QUANTITIES. C) IDENTIFY THE ROOM OR SPACE TO THE
 NORTH OF THE POOL EQUIPMENT ROOM DOORS. D) REFER TO
 SECTION 304.6 AND PROVIDE THE VERTICAL CLEARANCE
 DISTANCE FROM THE PARKING GARAGE FLOOR TO THE UNDERSIDE
 OF THE POOL EXHAUST DUCT, AND TO THE UNDERSIDE OF CU?S
 11-1, 12.5-2 & 11-3. E) PROVIDE THE SIZE OF THE DUCTS
 AND DIFFUSERS AT THE MAINTENANCE SHOP AND THE CFM
 CAPACITY. F) PROVIDE VENTILATION FOR THE OPEN STORAGE
 ROOM- TABLE 403.3/ASHRAE 62.1-2010. G) SHOW THE
 CONDENSATE PIPING RUN AND DISCHARGE LOCATION FOR
 FCU-7-2. H) PLEASE NOTE THAT A SEPARATE PLAN AND PERMIT
 ARE REQUIRED FOR THE POOL. ADVISORY: GAS POOL HEATERS
 WILL REQUIRE COMBUSTION AIR AND EXHAUST VENTILATION. IT
 MAY BE HELPFUL TO SHOW THESE DETAILS ON THE MAIN PLANS.
  
 26) M213: LABEL BOTH THE RTU-1 & 2 SUPPLY AND RETURN
 RISERS AT THE SHAFT LOCATIONS. A) DUCT SMOKE DETECTORS
 ARE REQUIRED TO BE INSTALLED IN THE RETURN AIR RISER OF
 RTU-1 AT EVERY STORY PER SECTION 606.2.3. SHOW A DS
 DETECTOR SYMBOL AT ALL LOCATIONS ON THE MECHANICAL
 PLANS AND ON THE RISER DRAWING M702. B) THE TOTAL CFM
 SUPPLY ON THE FLOOR PLAN FOR RTU-1 DOES NOT MATCH THE
 TOTAL SHOWN ON THE RISER DRAWING. C) THE CORRIDOR SHALL
 NOT BE USED TO CONVEY RETURN AIR PER SECTION 601.2.
 REMOVE ANY TRANSFER DUCTS INTO THE CORRIDOR AND PROVIDE
 DUCTED RETURNS.
  
 27) M213: THE TWO 12X8 DUCTS SHALL NOT PENETRATE INTO
 STAIR #2 (SEE SHEET A212) IN ACCORDANCE WITH SECTION
 1022.5 FBC-14 BUILDING. PLEASE RELOCATE THE DUCTS.
  
 28) M213: PROVIDE THE FLEX DUCT SIZES FOR AHU-12-6. A)
 LABEL THE O/A DUCT AND PROVIDE A SHUTOFF DAMPER PER
 SECTION C403.2.4.4 FBC-14 ENERGY CONSERVATION. B) FSD
 MISSING FOR THE 12X8 DUCT PENETRATING THE FIRE-RATED
 AHU-12-6 CLOSET WALL.
  
 29) M213: PROVIDE SYMBOLS OR KEYNOTES AT THE LOCATIONS
 OF THE MAIN SUPPLY TRUNKS UP TO AHU'S 12-1, 12-2, &
 12-3. A) LABEL ALL FLEX DUCT SIZES IN THE FITNESS
 CENTER. B) LABEL THE O/A DUCTS FOR AHU?S 12-1, 12-2, &
 12-3 AND PROVIDE SHUTOFF DAMPERS.
  
 30) M213: PROVIDE DUCT SIZES FOR FCU-12-1, A) LABEL ALL
 THE FLEX DUCT SIZES FOR AHU-12-4 & 12-5. B) PROVIDE
 SHUTOFF DAMPERS FOR THE O/A INTAKE DUCTS TO AHU-12-4 &
 12-5.
  
 31) M213: PROVIDE EXHAUST VENTILATION FOR THE TRASH
 ROOM.
  
 32) M214: LABEL THE RTU-1 & 2 SUPPLY AND RETURN RISERS.
 A) PROVIDE A DUCT SMOKE DETECTOR SYMBOL AT THE RETURN
 AIR RISER OF RTU-1. B) EXHAUST VENTILATION IS REQUIRED
 FOR THE DOG PARK (IF IT IS AN ENCLOSED ROOM), AND THE
 DOG WASH ROOM- TABLE 403.3. C) SHOW THE CONDENSATE
 PIPING PUNS AND DISCHARGE LOCATIONS FOR FCU-12.5-1,
 AHU-12-1, 12-2, & 12-3. D) PROVIDE VENTILATION FOR THE
 ELEC RM 12.509, MECH VEST. 12.510, MECH RM.12.507, AND
 EXHAUST VENTILATION FOR THE TRASH ROOM.
  
 33) M215: LABEL THE RTU-1 & 2 SUPPLY AND RETURN RISERS.
 A) PROVIDE A DUCT SMOKE DETECTOR SYMBOL AT THE RETURN
 AIR RISER OF RTU-1. B) PROVIDE EXHAUST VENTILATION FOR
 THE TRASH ROOM.
  
 34) M216: LABEL THE RTU-1 & 2 SUPPLY AND RETURN RISERS.
 A) PROVIDE A DUCT SMOKE DETECTOR SYMBOL AT THE RETURN
 AIR RISER OF RTU-1. B) PROVIDE EXHAUST VENTILATION FOR
 THE TRASH ROOM.
  
 35) M217A & M217B: THERE ARE MULTIPLE FSD'S MISSING
 WHERE O/A DUCTS ARE PENETRATING THE FIRE-RATED CORRIDOR
 WALLS- PLEASE CORRECT.
  
 36) M218: WIND LOAD TIE DOWN ENGINEERING IS REQUIRED
 FOR INSTALLATION OF THE ROOF TOP MECHANICAL EQUIPMENT
 INCLUDING THE O/A UNITS, RTU'S, CONDENSERS AND
 CONDENSER STANDS, FANS,
 DUCTWORK AND LOUVERS. PROVIDE KEY NOTES ON THE PLAN
 INDICATING WHERE THE DETAILS FOR INSTALLATIONS ARE
 LOCATED, AND SUBMIT FL. PRODUCT APPROVALS AND
 MIAMI-DADE NOA'S FOR THE STANDS, CURBS, AND LOUVER-
 SECTION 301.15 AND FLORIDA DEPARTMENT OF COMMUNITY
 AFFAIRS RULE 9N-3.
  
 37) M218: PROVIDE THE DIMENSIONS OF THE ELEVATOR
 HOISTWAY VENTS AND SIZING CALCULATIONS- SECTION 3004.3
 FBC-14 BUILDING CONSTRUCTION. INDICATE HOW THE OPENINGS
 WILL BE PROTECTED.
  
 38) M218: PROVIDE A RISER DIAGRAM FOR EF-2. THIS FAN IS
 PART OF THE SMOKE CONTROL SYSTEM AND IS INCLUDED IN THE
 SEQUENCE ON SHEET M703, HOWEVER I AM NOT SEEING A SHAFT
 OR ANY EXHAUST OPENINGS ON THE FLOORS BELOW IT.
  
 39) M703: PLEASE CLARIFY WHY THERE IS NO SMOKE CONTROL
 SEQUENCE OF OPERATION FOR FLOORS 1-11. IT APPEARS THAT
 ONLY PRESSURIZED STAIRS WILL FUNCTION IN THAT MODE. HOW
 WILL THE DAMPERS AT THE SHAFTS FOR RTU'S 3 & 4
 FUNCTION?
  
 40) SHEETS M501, 502, 503, 504, 505, 506, 507: THE
 FOLLOWING COMMENTS ARE PREDOMINANTLY APPLICABLE TO ALL
 THE RESIDENTIAL UNITS SHOWN ON THE PLANS WITH A FEW
 EXCEPTIONS. PLEASE REVIEW AND REVISE ACCORDINGLY:
 A) AC CLOSET DOORS SHALL BE NON-COMBUSTIBLE- SECTION
 C403.2.7.2 FBC-14 ENERGY CONSERVATION
 B) SHUTOFF DAMPERS ARE REQUIRED FOR THE O/A DUCTS-
 SECTION C403.2.4.4.
 C) DRYER BOOSTER FANS HAVE BEEN REMOVED FROM THE
 MECHANICAL CODE, AND DRYERS MUST HAVE THE CAPACITIES TO
 EXHAUST FROM THE CONNECTION TO THE TRANSITION DUCT TO
 THE OUTLET TERMINAL- SEE SECTIONS 504.6 THROUGH 504.6.7
 AND SUBMIT MANUFACTURER?S SPECIFICATIONS FOR THE
 DRYERS.
 D) KITCHEN EXHAUST IS REQUIRED AT 25 CFMS PER SQ. FT.
 CONTINUOUSLY OR 100 CFMS PER SQ. FT. INTERMITTENTLY.
 E) BALANCED RETURN AIR IS REQUIRED PER SECTION 601.5
 ITEMS #1, 2, & 3. MANY OF THE TRANSFER DUCTS AND GRILLS
 ARE UNDERSIZED I.E. 1) A 16X6 GRILL WILL TRANSFER A
 MAXIMUM OF 200 CFMS OF RETURN AIR, HOWEVER IT IS SHOWN
 TRANSFERRING 275 AND 300 CFMS IN SOME OF THE BEDROOMS.
 2) AN 8? TRANSFER DUCT FROM A BEDROOM IS SHOWN WHERE
 THERE IS AN 8? SUPPLY DUCT- MINIMUM SIZE MUST BE 10?.
 PLEASE REVIEW AND CORRECT.
  
 41) ADVISORIES: A) PLEASE NOTE THAT ALL PRODUCT
 SUBMITTALS, PRODUCT APPROVALS, AND NOA?S MUST BEAR SHOP
 DRAWING APPROVAL SIGNATURES BY THE DESIGN
 PROFESSIONALS. B) VERIFY ALL PLANS AND DOCUMENTS ON
 FILE, AND ALL RESUBMITTED PLANS AND DOCUMENTS BEAR
 ELECTRONIC SIGNATURES. C) PLEASE NOTE THAT THERE MAY BE
 ADDITIONAL COMMENTS FOLLOWING RESUBMITTAL OF CORRECTED
 PLANS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop P PLUMBING
Rev No 3 Status P Date 2017-01-24 Cont ID  
Sent By tklarge Date 2017-01-24 Time 14:06 Rev Time 0.00
Received By tklarge Date 2017-01-21 Time 04:59 Sent To  
Notes
2017-01-24 14:04:48PLUMBING PROVISO: THE PROVENT PLUMBING DESIGN SYSTEM
 SHALL BE REVIEWED BY PROVENT DESIGN SERVICES AND
 DOCUMENTATION OF SUCH REVIEW AND APPROVAL SHALL BE
 SUBMITTED TO THE CITY OF WEST PALM BEACH BUILDING
 DIVISION FOR REVIEW AND ACCEPTANCE PRIOR TO THE FIRST
 PLUMBING ROUGH INSPECTION.

Review Stop P PLUMBING
Rev No 2 Status F Date 2016-12-06 Cont ID  
Sent By tklarge Date 2016-12-06 Time 14:20 Rev Time 0.00
Received By tklarge Date 2016-11-19 Time 05:48 Sent To  
Notes
2016-11-27 08:22:14PLUMBING PLAN REVIEW - 2ND REVIEW - 11/19/16.
  
 1) UNITS WITH STACKED WASHER/DRYERS SHALL PROVIDE
 ACCESS TO THE WATER SHUTOFF VALVES FOR THE APPLIANCE
 PER 2014 FBC-PLUMBING SEC.606.3. SHOW ON THE PLANS HOW
 COMPLIANCE WILL BE ACHIEVED.
 2) SHT. A312 - THE DOOR ON THE AMBULATORY STALL IN THE
 WOMEN'S RESTROOM SHALL SWING OUT. 2014 FBC-ACCESS.
 SEC.604.8.2.2. THE GRAB BARS SHALL BE A MINIMUM OF 42
 INCHES. FAC SEC.604.5.1.
 3) SHT. A550 - IDENTIFY THE ACCESSIBLE URINAL ON THE
 PLAN AND SHOW THE REQUIRED 30 INCH BY 48 INCH CLEAR
 FLOOR SPACE FOR THE URINAL. FAC SEC.213.3.3, 605.
 4) SHT. A500 - DETAIL 6 - SHOW THE INSIDE CLEAR
 DIMENSIONS ( LXW ) FOR THE SHOWER. WPB AMEND. TO FBC
 SEC. 107.2.1.
 5) SHT.A500 - DETAIL #6 - THE DEPTH OF THE LAVATORIES
 SHALL NOT EXCEED 24 INCHES PER THE FHA DESIGN MANUAL.
 INDICATE THE MAXIMUM DEPTH ON THE PLANS.
 6) SHT. A500 - DETAIL #6 - THE LAVATORY MAY OVERLAP THE
 CLEAR FLOOR SPACE FOR THE SHOWER A MAXIMUM OF 6 INCHES
 IF THE SHOWER IS A MINIMUM OF 42 INCHES IN LENGTH PER
 THE FHA DESIGN MANUAL.THE PORTION OF THE LAVATORY THAT
 OVERLAPS THE CLEAR FLOOR SPACE MUST HAVE KNEE SPACE
 BELOW OR A REMOVABLE VANITY CABINET. THIRTY-SIX INCHES
 OF THE STALL ENTRANCE MUST ALWAYS REMAIN CCLEAR FOR
 MANEUVERING AND TRANSFERS PER THE FHA DESIGN MANUAL.
 **NOTE THAT THE PERPENDICULAR APPROACH TO THE TUB SHOWN
 IN DETAIL 6 IS APPLICABLE DESIGN SPECIFICATION "A"
 BATHROOMS ONLY.
 7) SHT. A501 - UNIT 01 - SHOW THE WIDTH DIMENSION
 BETWEEN THE KITCHEN SINK CABINET AND THE BASE CABINET
 ON THE OPPOSITE WALL. COMPLY WITH FHA DESIGN MANUAL.
 8) SHT. A502 - UNIT 03 - INDICATE ON THE PLAN WHICH
 FIXTURE, THE TUB OR SHOWER, COMPLIES WITH THE FAIR
 HOUSING DESIGN MANUAL GUIDELINES. IF IT IS THE TUB, THE
 CLEAR FLOOR SPACE SHALL BE FLUSH WITH THE CONTROL WALL
 SURFACE PER THE GUIDELINES. THIS IS TO BE SHOWN ON ALL
 "B" UNITS AS THE LOCATION OF THE CLEAR FLOOR SPACE AS
 SHOWN DOES NOT COMPLY WITH THE GUIDELINES.
 9) SHT. A 502 - CLEARLY SHOW THE DIMENSION OF THE
 TURNING DIAMETER CIRCLE IN THE KITCHEN AND THE
 DIMENSIONS OF THE OTHER CLEAR FLOOR SPACES. A TYPICAL
 ENLARGED FLOOR PLAN FOR EACH BATHROOM SPECIFICATION (A
 OR B ) & KITCHEN SHOWING THE DIMENSIONS OF THE CLEAR
 FLOOR SPACES AND COMPLIANCE WITH THE GUIDELINES ON THE
 PLANS WOULD HELP EXPEDITE THE REVIEW AT RESUBMITTAL.
 WPB AMEND. TO FBC SEC. 107.2.1.
 10)THE LOCATION OF THE CLEAR FLOOR SPACE FOR THE
 BATHTUBS IN ALL "B" UNITS AS SHOWN DOES NOT COMPLY WITH
 THE GUIDELINES. THE EDGE OF THE CLEAR FLOOR SPACE SHALL
 BE FLUSH WITH THE CONTROL WALL SURFACE PER THE
 GUIDELINES.
 11) SHT. A508 - THE DEPTH OF THE CHASE ADJACENT TO THE
 WATER CLOSET CANNOT EXCEED 24 INCHES PER THE
 GUIDELINES. CLEARLY SHOW THE DEPTH OF THE CHASE FROM
 THE FACE OF THE REAR WALL AT THE WATER CLOSET TO THE
 FACE OF THE CHASE.
 12) SHT. A508 - CLEARLY SHOW / DEFINE THE CLEAR FLOOR
 SPACE AND DIMENSIONS OF THE CLEAR FLOOR SPACE FOR THE
 WATER CLOSET ON THE PLANS. AS SHOWN, IT DOES NOT APPEAR
 TO COMPLY WITH THE GUIDELINES.
 13) SHT.A518 - SHOW THE LENGTH OF THE WING WALL
 ADJACENT TO THE WATER CLOSET IN THE "B" BATHROOM.THE
 WING WALL SHALL NOT EXCEED 24 INCHES PER THE
 GUIDELINES.SEE ALSO SHT. A519.
 14) SHOW THE DIMENSION BETWEEN THE BASE CABINETS AND
 THE ISLAND IN THE TYPICAL PASS THROUGH KITCHENS. COMPLY
 WITH REQUIREMENT #7 OF THE FHA.
 15) SHT. A522 & A523 - THE WING WALL ADJACENT TO THE
 WATER CLOSET AND THE BATHTUB ARE ENCROACHING MORE THAN
 24 INCHES INTO THE CLEAR FLOOR SPACE FOR THE WATER
 CLOSET IN VIOLATION OF THE GUIDELINES AND REQ. #7 OF
 THE FHA.
 16) SHT. A530 - THE DOOR TO THE LAUNDRY ROOM (T31)
 SHALL PROVIDE A 32 INCH CLEAR OPENING PER THE
 GUIDELINES.
 17) SHT. A532 - THE DOOR APPEARS TO SWING INTO THE
 CLEAR FLOOR SPACE FOR THE WATER CLOSET, SHOWER AND
 LAVATORY. A 30 INCH BY 48 INCH MINIMUM CLEAR FLOOR
 SPACE SHALL BE PROVIDED OUTSIDE THE SWING OF THE DOOR
 PER THE GUIDELINES. CLEARLY SHOW THIS REQUIRED CLEAR
 FLOOR SPACE OUTSIDE THE SWING OF THE DOOR.
 18) SHT. A535 - A 30 INCH BY 48 INCH CLEAR FLOOR SPACE
 SHALL BE PROVIDED AT SHOWER STALLS, PARALLEL TO THE
 FIXTURE AND FLUSH WITH THE CONTROL WALL. SHOW THE
 REQUIRED CLEAR FLOOR SPACE ON THE PLAN IN THE BATHROOM
 BY THE LAUNDRY. THE OTHER BATHROOM DOES NOT COMPLY WITH
 DESIGN SPECIFICATION "A" BECAUSE THE CLEAR FLOOR SPACE
 IS NOT PARALLEL TO THE SHOWER AND FLUSH WITH THE
 CONTROL WALL DUE TO THE DOUBLE LAVATORIES. THERE IS NO
 ALLOWANCE FOR A CLEAR FLOOR SPACE PERPENDICULAR TO THE
 SHOWER, ONLY FOR A BATHTUB IN THE "A" SPECIFICATION
 DESIGN. SHOW THE LENGTH OF THE WING WALL ADJACENT TO
 THE WATER CLOSET IN THIS BATHROOM.
 19) SHT. A535 - THE DOORS FOR THE LAUNDRY ROOM (T30A)
 SHALL PROVIDE A 32 INCH CLEAR OPENING PER THE
 GUIDELINES.
 20) SHT.A535 -THE POWDER ROOM DOOR SHALL HAVE A 32 INCH
 CLEAR OPENING AND COMPLY WITH THE GUIDELINES FOR
 SWITCHES,OUTLETS AND CONTROLS.
 21) SHT. A552 - THE BREAK ROOM SINK IN THE LEASING
 OFFICE SHALL COMPLY WITH 2014 FBC ACCESS. SECS. 212 &
 606.
 22) SHTS. A553 THROUGH A555 - THERE IS A BOX ON ALL
 THREE SHEETS FOR EMERGENCY OVERFLOW DRAINAGE
 CALCULATIONS BUT THE CALCULATIONS HAVE NOT BEEN DONE
 AND THE INFORMATION IS MISSING. SUBMIT ALL REQUIRED
 INFORMATION IN THESE AREAS FOR THE EMERGENCY OVERFLOW
 DRAINAGE PROVISIONS.WPB AMEND. TO FBC SEC. 107.2.1.
 23) SHTS. A201 & A601 REFER TO A BATHROOM ON THE FIRST
 LEVEL NEAR THE WEST RESSIDENTIAL LOBBY / WEST ELEVATORS
 BUT IT IS NOT REFERENCED ON SHT. A301. THE UNDERGROUND
 SANITARY FOR THIS BATHROOM IS NOT SHOWN ON SHT. 200A.
 CLARIFY.
 24) SHT. A1206 - DETAILS #1 & #2 - ARE THESE DETAILS
 FOR THE WATER CLOSETS IN THE COMMON AREA RESTROOMS /
 TOILET ROOMS? IF IN THE COMMON AREAS THE GRAB BARS
 SHALL BE MEASURED FROM THE FINISH FLOOR TO THE TOP OF
 THE GRIPPING SURFACE PER 2014 FBC-ACCESS. 609.4.
 CLARIFY. THE GOVERNING ACCESSIBILITY CODE IN FLORIDA IS
 THE 2014 FBC-ACCESSIBILITY, NOT THE ADA. THE FBC IS AN
 ADA COMPLIANT CODE AND HAS BEEN APPROVED BY THE DOJ.
 25) SHT. A1206 - DETAIL #5 - THE LENGTH OF THE BACKING
 AT THE TUB SHALL BE 48 INCHES MINIMUM PER THE FHA
 DESIGN MANUAL.
 26) SHT. A1207 - DETAILS #2 &L #7 - SHOW THE DIMENSIONS
 (LXW) OF THE SCUPPERS.
 27) THE SANITARY RISERS SHOW A SOVENT DESIGN SYSTEM BUT
 IT IS MY UNDERSTANDING FROM A MEETING THAT A PROVENT
 SYSTEM IS TO BE INSTALLED.IF A PROVENT DESIGN IS TO BE
 UTILIZED, SUBMIT ALL NEW RISER DIAGRAMS DESIGNED USING
 THE PROVENT SYSTEM AND THE DESIGN SPECIFICATIONS AND
 MANUAL.IF THE DESIGN OF THE SANITARY SYSTEM IS INDEED A
 SOVENT SYSTEM, INDICATE THE SYSTEM MANUFACTURER AND THE
 DESIGN STANDARD THAT WAS USED IN THE DESIGN OF THE
 SYSTEM.A COMPREHENSIVE REVIEW WAS NOT DONE ON THE
 SOVENT SYTEM DUE TO THE QUESTION OF THE TYPE OF SYSTEM
 BEING USED. WPB AMEND. TO FBC SEC. 107.2.1 &
 107.3.5.1.3.
 28) SHT. M706 SHOWS THE 2 INCH CONDENSATE LINE DRAINING
 INTO AN 1 1/4 INCH AND AN 1 1/2 CONDENSATE LINE. THE
 PIPE SIZE CANNOT BE REDUCED IN THE DIRECTION OF FLOW.
 2014 FPC SEC.314.2.2.
 29) SHOW COMPLIANCE WITH 2014 FPC SEC.314.2.3 FOR THE
 REQUIREMENTS FOR AUXILARY AND SECONDARY DRAIN SYSTEMS
 FOR THE CONDENSATE SYSTEMS.
 30) IDENTIFY THE FLOOR LEVELS ON THE CONDENSATE RISERS.
 WPB AMEND. TO FBC SEC. 107.2.1.
 31) SHT.P200A - THE 3 INCH SUMP FOR THE ELEVATOR -
 WHERE IS THE PIPING RISER? PLANS REFER TO A "DETAIL"
 FOR FURTHER INFO. IDENTIFY THE DRAWING SHEET NUMBER
 WHERE THIS DETAIL CAN BE FOUND. WPB AMEND. TO FBC SEC.
 107.2.1.
 32) IDENTIFY THE FLOOR LEVELS ON ALL RISERS.2ND
 REQUEST.THIS WAS PARTIALLY DONE. WPB AMEND. TO FBC
 SEC.107.2.1
 33) THE SPECIFICATIONS FOR THE BACKWATER VALVE ON THE
 CONDENSATE DRAINS HAVE NOT BEEN SUBMITTED AS PREVIOUSLY
 REQUESTED. THIS CAN BE A DEFERRED SUBMITTAL. THE
 SPECIFICATIONS CAN BE SUBMITTED FOR THE REVIEW AT THE
 TIME OF INSTALLATION.
 34) INDICATE ON THE PLANS WHAT STANDARD / CODE WAS USED
 IN SIZING THE OIL INTERCEPTOR. SUBMIT DETAILS/ COPIES
 OF THE STANDARD USED FOR THE SIZING. WPB AMEND. TO FBC
 SEC. 107.2.1.
 35) SHTS. 203A, 204A - SUBMIT A DETAIL OF THE SURGE
 TANK AND ASSOCIATED PIPING THAT IS LOCATED ON THE
 SECOND PARKING LEVEL. THE TANK IS NOT SHOWN ON THE
 ARCITECTURAL OR LIFE SAFETY PLANS. CLARIFY.ALSO,
 EXPLAIN THE OPERATIONS OF THE SURGE TANK. SHT. 204A HAS
 A NOTE THAT READS"SET VALVE FOR SLOW DRAIN OFF OF SURGE
 TANK. 24 HOUR MAX." WHERE DOES THIS TANK DRAIN? .WPB
 AMEND. TO FBC SEC. 107.2.1.
 36) A COMPRHENSIVE REVIEW COULD NOT BE PERFORMED ON THE
 SANITARY AND WATER RISERS. THE METHOD USED TO TAG THE
 RISERS IS EXTRERMELY CONFUSING. I CANNOT FIGURE OUT
 WHAT RISER GOES WHERE OR WHAT METHODOLOGY IS BEING
 USED. PLEASE CONTACT THIS PLAN REVIEWER TO SET UP A
 MEETING TO REVIEW AND DISCUSS THE SANITARY AND WATER
 RISER TAGGING SYSTEM. A RISER TAG LEGEND THAT CLEARLY
 CORRELATES WITH EACH PLUMBING PLAN SHEET AND RISER
 SHALL BE SUBMITTED.
 37) PLEASE EXPLAIN THE MATCH LINES OF ZONE #1 & ZONE
 #2.
 38) CLEANOUTS ARE REQUIRED IN THE STORM DRAINAGE SYSTEM
 IN ACCORDANCE WITH FPC SEC.1101.8.
 39) FULL -OPEN VALVES SHALL BE INSTALLED ON THE BASE OF
 OF EVERY WATER RISER PIPE IN ACCORDANCE WITH THE 2014
 FPC SEC.606.1 (4).
 40) A FULL-OPEN VALVE SHALL BE INSTALLED ON THE
 DISCHARGE SIDE OF EVERY WATER METER. FPC SEC. 606.1.
 41) SUBMIT A COMPLETE UNDERGROUND COLLECTION RISER
 DIAGRAM FOR THE SANITARY SYSTEM SHOWING THE INDIVIDUAL
 RISER BRANCHES WITH TAG NUMBERS THAT CLEARLY REFLECT
 THE SCOPE OF WORK. WPB AMEND. TO FBC SEC. 107.2.1.
 42) ALL FLOOR DRAINS SHALL BE EQUIPPED WITH TRAP
 PRIMERS. 2014 FPC SEC.1002.4.
 43) SHT. P301 - NOTE #1 REFERS TO A WATER LINE YET THE
 NOTE IS ALSO LOCATED ON THE 2 1/2 INCH GAS LINE ON THE
 PLAN. CLARIFY.
 44) THE PLANS NOTE THAT THE PIPE SLOPE FOR PIPE SIZES 8
 INCH OR LARGER SHALL BE 1/16 OF AN INCH.THE MINIMUM
 SLOPE FOR STORM DRAINAGE PIPING PER FPC TABLE 1106.3 IS
 1/8 OF AN INCH. CLARIFY.
 45) POINT OF USE WATER HEATERS SUPPLYING TEMPERED WATER
 SHALL BE EQUIPPED WITH A WATER TEMPERATURE LIMITING
 DEVICE THAT COMPLIES WITH ASSE 1070 THAT LIMITS THE
 TEMPERED WATER TO A MAXIMUM TEMPERATURE OF 110 DEGREES.
 FPC SEC. 607.1.2.
 46) SHT. P311B - NOTE #2 REFERS TO A 6 INCH WATER LINE
 IN A CHASE BUT THERE IS NO CHASE AND THERE IS NO
 CONTINUATION OF THE WATER LINE. CLARIFY.
 47) SHT. 314B - NOTE ON PLAN IN MECH. ROOM 12.507 CALLS
 OUT CHASE FOR WATER RISER BUT RISER APPEARS TO BE IN
 DOORWAY. CLARIFY.
 48) THE DE-AERATOR FITTINGS SHALL BE LOCATED AT THE
 BASE OF THE VERTICAL STACK BEFORE IT ENTERS THE
 HORIZONTAL BUILDING DRAIN. THERE ARE SOME THAT ARE
 LOCATED IN THE STACKS.
 49) SUBMIT EXPANDED SANITARY RISERS FOR REVIEW. THE
 RISERS ARE DIFFICULT TO REVIEW. WPB AMEND. TO FBC SEC.
 107.2.1.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  
  
  
  
  
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2016-09-08 Cont ID  
Sent By gjohnson Date 2016-09-08 Time 10:12 Rev Time 0.00
Received By gjohnson Date 2016-08-26 Time 10:30 Sent To  
Notes
2016-09-08 11:15:531ST REVIEW
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
 PLUMBING COMMENTS:
  
 1. PLEASE INDICATE ON THE PLAN WHICH DESIGN
 SPECIFICATION FOR THE BATHROOMS YOUR USING FOR THE FHA.
 PER WPB AMEND. TO FBC 107.2.1
  
 2.SHT. A550 AMBULATORY TOILET STALLS IN WOMENS AMENITY
 BATHROOMS SHALL BE MIN 35IN AND 37IN MAX WIDE. PER FBC
 ACC 604.8.2.1
  
 3. IF AMENITY BATHROOMS SERVE THE ASSEMBLY OCCUPANCY
 THEY SHALL COMPLY WITH FBC PL 403.1.3 POTTY PARITY.
 IN ASSEMBLY OCCUPANCIES, RESTROOMS WHICH ARE OPEN TO
 THE PUBLIC MUST HAVE A RATIO OF 3:2 WATER CLOSETS
 PROVIDED FOR WOMEN AS THE COMBINED TOTAL OF WATER
 CLOSETS AND URINALS PROVIDED FOR MEN, UNLESS THESE ARE
 TWO OR FEWER SUCH FIXTURES FOR MEN, IN ACCORDANCE WITH
 SECTION 553.86, FLORIDA STATUTES.
  
 4. DOORS IN BATHROOM S 0-201,1206,1207 SHALL COMPLY
 WITH FBC ACC 603.2.3 DOOR SWING.
 DOORS SHALL NOT SWING INTO THE CLEAR FLOOR SPACE OR
 CLEARANCE REQUIRED FOR ANY FIXTURE. DOORS SHALL BE
 PERMITTED TO SWING INTO THE REQUIRED TURNING SPACE.
  
 5. SHT A1206 DETAIL #3 REINFORCING FOR GRAB BARS IN THE
 SHOWERS SHALL BE MAX 32IN TO THE BOTTOM O.F.F. AND A
 MIN 38IN TO THE TOP. PER FHA CH.6 PG.6.12
  
 6. SHT.A1206 REINFORCEMENT FOR GRAB BARS AT TOILET
 SHALL BE MAX 32IN TO THE BOTTOM O.F.F. AND A MIN 38IN
 TO THE TOP. PER FHA CH.6 PG.6.4-5
  
 7. SHT.P200A LABEL SANITARY PIPING FOR BATHROOM IN
 LOBBY. PER WPB AMEND TO FBC 107.2.1
  
 8. IN THE LEASING OFFICE AND LOBBY SEPARATE FACILITIES
 ARE REQUIRED FOR EACH SEX. FBC ACC. 403.2 SEPARATE
 FACILITIES.
 WHERE PLUMBING FIXTURES ARE REQUIRED, SEPARATE
 FACILITIES SHALL BE PROVIDED FOR EACH SEX.
  
 9. PLEASE LABEL FLOOR LEVELS ON SANITARY RISER
 DIAGRAMS. PER WPB AMEND. TO FBC 107.2.1
  
 10. PROVIDE DETAIL FOR WASH-RING IN TRASH CHUTE. PER
 WPB AMEND. TO FBC 107.2.1
  
 11. PROVIDE TAG NUMBERS ON EACH STACK SHTS. P201A THRU
 P219B. PER WPB AMEND. TO FBC 107.2.1
  
 12. PLEASE INDICATE ON THE PLAN THE SLOPE OF ALL
 HORIZONTAL STORM AND SANITARY PIPING. PER WPB AMEND. TO
 FBC 107.2.1
  
 13. PROVIDE MANUFACTURE SPECS FOR BACKWATER VALVE ON
 CONDENSATE DRAINS. PER WPB AMEND. TO FBC 107.2.1
  
 14. PROVIDE DETAIL FOR EMERGENCY OVER FLOW SCUPPER. PER
 WPB AMEND. TO FBC 107.2.1
  
 15. PLEASE PROVIDE SIZING CALCULATIONS FOR THE OIL SAND
 SEPARATOR. PER WPB AMEND. TO FBC 107.2.1
  
 16. PLEASE PROVIDE MANUFACTURE SPECS FOR OIL MINDER
 ELEVATOR SUMP PUMP, DOMESTIC WATER PUMP, KITCHEN GREASE
 HEAT TRACE SYSTEM. PER WPB AMEND. TO FBC 107.2.1
  
 17.TRAP PRIMERS ARE REQUIRED ON FLOOR DRAINS AND THE
 STAND PIPES FOR ELEVATOR SUMP PUMP AND FIRE SPRINKLER
 BLOW DOWN. PER FBC PL 1002.4 TRAP SEALS.
 EACH FIXTURE TRAP SHALL HAVE A LIQUID SEAL OF NOT LESS
 THAN 2 INCHES (51 MM) AND NOT MORE THAN 4 INCHES (102
 MM), OR DEEPER FOR SPECIAL DESIGNS RELATING TO
 ACCESSIBLE FIXTURES. WHERE A TRAP SEAL IS SUBJECT TO
 LOSS BY EVAPORATION, A TRAP SEAL PRIMER VALVE SHALL BE
 INSTALLED. TRAP SEAL PRIMER VALVES SHALL CONNECT TO THE
 TRAP AT A POINT ABOVE THE LEVEL OF THE TRAP SEAL. A
 TRAP SEAL PRIMER VALVE SHALL CONFORM TO ASSE 1018 OR
 ASSE 1044.
  
 18. PLEASE PROVIDE RISER DIAGRAMS FOR CONDENSATE DRAINS
 AND WATER HEATER PAN DRAINS. PER WPB AMEND. TO FBC
 107.3.5.1.3(13)
  
 19. ALL THE PLUMBING SHEETS ARE MARKED NOT FOR
 CONSTRUCTION THEY CAN NOT BE APPROVED THIS WAY PLEASE
 CLARIFY. PER WPB AMEND. TO FBC 107.2.1
  
  
 DUE TO THE DEFICIENCIES OF THIS PLAN A COMPLETE AND
 THOROUGH REVIEW CANNOT BE DONE AT THIS TIME. UPON
 RESUBMITTAL THERE MAYBE ADDITIONAL COMMENTS.
  
 WHEN RESUBMITTING PLANS, REMOVE AND REPLACE ANY PAGES
 AS NECESSARY. A NARRATIVE LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER WITH A DESCRIPTION OF THE CHANGES MADE
 AND IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGE CAN BE FOUND WILL HELP EXPEDITE THE REVIEW.
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2017-01-17 Cont ID  
Sent By shill Date 2017-01-17 Time 15:00 Rev Time 0.00
Received By shill Date 2016-11-19 Time 10:12 Sent To  
Notes
2017-01-24 14:10:52PLUMBING SIGNATURES OK. T.LARGE
2017-01-17 15:01:26PROVISO - ANY NEW SHEETS (IF ANOTHER REVIEW CYCLE IS
 REQUIRED) REQUIRE SIGNATURE VERIFICATION
  
 1/17/17 VERIFIED B, F, E, P, S (SH)
  
  
2017-01-13 16:40:42CCOLE
 1/13/17
  
 1) THE MECHANICAL PLANS, ENERGY CALCULATIONS, AND AC
 CALCULATIONS BEAR ELECTRONIC SEALS AND SIGNATURES BY
 THE ENGINEER OF RECORD.
  
 2) THE SMOKE CONTROL RATIONAL ANALYSIS REPORT IS BY
 JAMES S LUKE P.E. IS NOT ELECTROCICALLY SIGNED AND
 SEALED.
  
  
2016-11-19 08:53:142ND REVIEW SIGNATURES VERIFIED 11/19 SHILL
  
 SURVEY - S&S OK
 CIVIL - S&S OK (WITH EXCEPTION OF SIGNATURE FOR C204,
 WHICH RENDERS CORRECTLY IN PROJECTDOX. THE PDF HAS AN
 ERROR IN ADOBE. FOR SIGNATURE, REFER TO THE PAPER PLANS
 SUBMITTED TO ENGINEERING DEPT OR TO THE SIGNATURE PDF
 IN THE SIGNATURE DOCUMENTS FOLDER. THIS SHEET IS FOR
 INFORMATION ONLY AND IS NOT REQUIRED FOR THIS PERMIT.)
 LANDSCAPE - PAGES ARE NOT S&S BUT ARE MARKED "NOT FOR
 CONSTRUCTION". THE PAGES APPEAR TO BE INFORMATIONAL
 ONLY. THESE SHEETS WILL BE SUPERSEDED BY A LANDSCAPE
 PERMIT TO BE SUBMITTED SEPARATELY WITH SEPARATE
 APPLICATION, FEES, AND PLANS.
 LANDSCAPE IRRIGATION (LI) SHEETS ARE S&S BUT ARE MARKED
 "NOT FOR CONSTRUCTION." THE PAGES APPEAR TO BE
 INFORMATIONAL ONLY. THESE SHEETS WILL BE SUPERSEDED BY
 AN IRRIGATION PERMIT TO BE SUBMITTED SEPARATELY WITH
 SEPARATE APPLICATION, FEES, AND PLANS.
  
  
  
  
  
2016-09-12 16:32:399/12/16 REVIEW #1 DIGITAL SIGNATURE (SH)
 C, L SHEETS NOT DIGITALLY S&S
 LI SHEETS OK
 A, S SHEETS OK
  
  
  
  
  
  

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 2 Status P Date 2016-08-18 Cont ID  
Sent By shill Date 2016-08-18 Time 09:44 Rev Time 0.00
Received By shill Date 2016-08-18 Time 09:44 Sent To  
Notes
2016-08-18 09:45:30PER KCONRAD, OK TO USE AGREEMENT FROM FOUNDATION PERMIT
 (16030058) AND ADD STRUCTURE AND BUILDOUT PERMIT
 NUMBERS (16040755, 16070715). ADDED NUMBERS AND ROUTED
 ONE SET TO RECORDS, ONE SET TO KC DESK
  

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By shill Date 2016-08-17 Time 16:17 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status P Date 2017-01-24 Cont ID  
Sent By aaponte Date 2017-01-24 Time 12:06 Rev Time 0.00
Received By aaponte Date 2017-01-24 Time 12:06 Sent To  
Notes
2017-01-24 12:09:14PROVISO:
 NO REVIEW CONDUCTED UNDER THIS SUBMITTAL. IF ANY
 CHANGES INTRODUCED SINCE PREVIOUS APPROVAL AND
 ADDITIONAL REVIEW WILL BE NECESSARY.
 1. ELECTRIC CAR STATIONS SHALL BE FOR TRAIN STATION
 GARAGE. IF FOR RESIDENTIAL GARAGE REVISED NUMBERS SHALL
 BE PROVIDED TO CONFIRM THE PROJECT COMPLIES WITH
 MINIMUM PARKING REQUIREMENTS.
 ALL PROVISOS INCLUDED IN PREVIOUS APPROVAL STILL
 REMAIN.
 1. PLEASE PROVIDE INFORMATION REGARDING THE SAFE
 CIRCULATION TO ACCESS VAN ACCESSIBLE PARKING SPACE ON
 FIRST FLOOR OF GARAGE.
 2. PLEASE IDENTIFY IN A SEPARATE LETTER ALL THE IT/TEL
 , BIKE STORAGE ROOMS AND OTHER ELECTRIC ROOM WITHIN THE
 UPPER LEVELS AND ACKOWLEDGE THEY ARE NOT TO BE USES FOR
 HUMAN OCCUPATION DIFFERENT THAN LISTED.
 3. PLEASE INCLUDE A NOTE IN THE ARCHITECTURAL DRAWINGS
 STATING THE BIKE STORAGE ROOM IS A NON-CONDITIONED
 SPACE.
 4. PLEASE INDICATE THE DIMENSIONS OF EACH PARKING SPACE
 TO CONFIRM COMPLIANCE WITH MIN DIMENSIONS WHEN ADJACENT
 TO COLUMNS OR WALLS.
 5. PLEASE INDICATE THE LOCATION OF GUEST PARKING AND
 RETAIL PARKING WHITHIN THE RESIDENTIAL PARKING AND
 CREATE A TABLE LISTING THE NUMBER OF SPACES DEDICATED
 FOR EACH PLUS THE AAF STATION PARKING.
 6. PLEASE INCLUDE A NOTE IN THE CIVIL DRAWINGS STATING
 THAT THE SIDEWALK ELEVATION SHALL BE MAINTAINED AS IT
 CROSSES THE GARAGE DRIVEWAY .
 7. PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE
 WITH ALL THE TRAFFIC MITIGATION MEASURES IMPOSED BY THE
 DAC APPROVAL.
 8. PLEASE SUBMIT A SEPARATE LANDSCAPE PERMIT.
 FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA
 APONTE AT 561-822-1439.

Review Stop Z ZONING
Rev No 2 Status P Date 2016-12-16 Cont ID  
Sent By aaponte Date 2016-12-16 Time 15:34 Rev Time 0.00
Received By aaponte Date 2016-12-14 Time 16:21 Sent To  
Notes
2016-12-16 15:43:57PROVISO:
 1. PLEASE PROVIDE INFORMATION REGARDING THE SAFE
 CIRCULATION TO ACCESS VAN ACCESSIBLE PARKING SPACE ON
 FIRST FLOOR OF GARAGE.
 2. PLEASE IDENTIFY IN A SEPARATE LETTER ALL THE IT/TEL
 , BIKE STORAGE ROOMS AND OTHER ELECTRIC ROOM WITHIN THE
 UPPER LEVELS AND ACKOWLEDGE THEY ARE NOT TO BE USES FOR
 HUMAN OCCUPATION DIFFERENT THAN LISTED.
 3. PLEASE INCLUDE A NOTE IN THE ARCHITECTURAL DRAWINGS
 STATING THE BIKE STORAGE ROOM IS A NON-CONDITIONED
 SPACE.
 4. PLEASE INDICATE THE DIMENSIONS OF EACH PARKING SPACE
 TO CONFIRM COMPLIANCE WITH MIN DIMENSIONS WHEN ADJACENT
 TO COLUMNS OR WALLS.
 5. PLEASE INDICATE THE LOCATION OF GUEST PARKING AND
 RETAIL PARKING WHITHIN THE RESIDENTIAL PARKING AND
 CREATE A TABLE LISTING THE NUMBER OF SPACES DEDICATED
 FOR EACH PLUS THE AAF STATION PARKING.
 6. PLEASE INCLUDE A NOTE IN THE CIVIL DRAWINGS STATING
 THAT THE SIDEWALK ELEVATION SHALL BE MAINTAINED AS IT
 CROSSES THE GARAGE DRIVEWAY .
 7. PLEASE PROVIDE INFORMATION TO CONFIRM COMPLIANCE
 WITH ALL THE TRAFFIC MITIGATION MEASURES IMPOSED BY THE
 DAC APPROVAL.
 8. PLEASE SUBMIT A SEPARATE LANDSCAPE PERMIT.
 FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA
 APONTE AT 561-822-1439.

Review Stop Z ZONING
Rev No 1 Status F Date 2016-09-26 Cont ID  
Sent By aaponte Date 2016-09-26 Time 13:53 Rev Time 0.00
Received By aaponte Date 2016-09-26 Time 13:53 Sent To  
Notes
2016-09-26 14:38:411. RETAIL DOORS ON EAST SIDE CANNOT SWING OPEN INTO THE
 MINIMUM SETBACK. DOORS SHALL BE RECESSED.
 2. PLEASE CONFIRM THE VAN ACCESSIBLE SPACE ON 1ST FLOOR
 OF RESIDENTIAL GARAGE IS SAFE FOR USERS AND DO NOT
 CONFLICT WITH TRAVEL LANE.
 3. LEVEL 2 ENCLOSED STORAGE NEXT TO WEST ELEVATOR BANK
 SHALL BE COUNTED AS FAR.
 4. SUBMITTED DRAWINGS ARE NOT DIMENSIONED. PLEASE
 SUBMIT PARKING SPACES DIMENSIONED. PARKING SPACES WITH
 COLUMNS OR WALLS ON ONE OR BOTH SIDES ARE REQUIRED TO
 BE WIDER BY ONE FOOT OR TWO FEET FRO BOTH SIDES
 OBSTRUCTIONS. (SEC 94-111(C)(1)).
 5. WHAT IS THE T/E ROOM NOT INCLUDED IN THE FAR?
 6. PLEASE PROVIDE A SKETCH INDICATING WHAT ELEVATOR IS
 USING EACH OF THE RESIDENTIAL PARKING LEVELS. IF
 ELEVATOR OR FIREMAN'S LIFT LOBBY IS USED BY ANY OF THE
 RESIDENTS PARKING IT SHALL BE COUNTED AS PART OF THE
 FAR.
 7. PLEASE LABEL RESIDENTIAL BIKE STORAGE AS
 NON-AIRCONDITIONED SPACE, OTHERWISE IT SHALL BE COUNTED
 AS PART OF THE FAR.
 8. PLEASE LABEL SPACE ADJACENT TO THE MAINTENANCE SHOP
 IN LEVEL II AS NON-AIRCONDITIONED SPACE, AS IT SHALL
 NOT BE FOR HUMAN OCCUPATION OR STORAGE.
 9. PLEASE CONFIRM THE RETAIL SPACES ARE DESIGNED FOR
 FUTURE TENANT IMPROVEMENTS FOR RESTROOMS, OR FOOD
 PREPARATION.
 10. EXTERIOR STAIR RAILING IS SHOWN AS AN OPEN RAILING
 BUT NOTES INDICATE OPAQUE RAILING. APPROVED RENDERINGS
 SHOW TRANSPARENT RAILINGS.
 11. APPROVED RENDERINGS SHOW HIGH WINDOWS ON THE SOUTH
 ELEVATIONS OF EAST RESIDENTIAL LINER UNITS. WINDOWS NOT
 CURRENTLY SHOWN.
 12. CASTSTONE VOLUME ON WEST ELEVATION ABOVE
 RESIDENTIAL ENTRANCE HAS BEEN MODIFIED, PLEASE RESTORE
 TO SITE PLAN APPROVAL.
 13. LEASING OFFICE WINDOWS HAVE BEEN REDUCED IN SIZE
 FROM APPROVED RENDERINGS, PLEASE RESTORE TO SITE PLAN
 APPROVAL.
 14. FLOOR PLANS INDICATING THE AREAS COUNTED AS FAR AND
 THEIR SQUARE FOOTAGE SHALL BE SUBMITTED.
 15. PLEASE DETAIL THE FINAL CIRCULATION PATTERN FOR THE
 ALLEY AND THE MODIFICATION AT THE EAST END.
 16. DRIVEWAYS ELEVATION AT THE SIDEWALK CROSSING SHALL
 BE MAINTAINED AT THE SAME LEVEL THAN THE SIDEWALK,
 PLEASE REVISE CIVIL DRAWINGS.
 17. PLEASE PROVIDE INFORMATION REGARDING THE TRAFFIC
 MITIGATION MEASURES REQUIRED BY THE DAC APPROVAL.
 18. PEDESTRIAN CROSSING SHALL BE INDICATED AT THE NORTH
 CROSSING OF EVERNIA STREET AND NEW ACCESS ROAD.
 19. PLEASE INDICATETHE EXACT MATERIALS PROPOSED FOR THE
 GARAGE SCREENING, TYPE OF SCREENING IN WHICH AREAS
 (COLORED DRAWING TO CLEARLY SHOW?)
 20. PLEASE PROVIDE A SITE PLAN DRAWINGS SHOWING THE
 FIRST FLOOR USES WITH ACCESS POINTS AND WINDOWS, THE
 STREETSCAPE AND LANDSCAPE.
 21. THE DETAILS ON THE DIFFERENT TRANSITION MATERIALS
 FOR THE SIDEWALKS AROUND THE PROJECT STILL NEED FURTHER
 DISCUSSION. PROPOSAL IS CREATING A FORTH DESIGN PATTERN
 AT THE ROSEMARY AND EVERNIA CORNER
 22. PLEASE SUBMIT A SEPARATE LANDSCAPE PERMIT FOR ALL
 LANDSCAPE ON SITE AND A RIGHT OF WAY PERMIT FOR ALL
 ELEMENTS PROPOSED ON RIGHT OF WAY.
 FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA
 APONTE AT 561-822-1439.