Plan Review Details - Permit 16070400
Plan Review Stops For Permit 16070400 |
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2016-09-08 |
|
|
Cont ID |
|
Sent By |
mvaldes |
Date |
2016-09-08 |
Time |
09:39 |
Rev Time |
0.00 |
Received By |
mvaldes |
Date |
2016-09-08 |
Time |
09:15 |
Sent To |
P |
|
Notes |
2016-09-08 09:39:35 | ROUTED TO GJ |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2016-07-13 |
|
|
Cont ID |
|
Sent By |
mvaldes |
Date |
2016-07-13 |
Time |
18:08 |
Rev Time |
0.00 |
Received By |
mvaldes |
Date |
2016-07-13 |
Time |
17:32 |
Sent To |
P |
|
Notes |
2016-07-13 18:10:12 | REVIEW 2014 5TH FBC ED. NEC 2011 | | MARIO VALDES | | ELECTRICAL PLAN EXAMINER | | 561-805-6713 | | [email protected] | | | | | | PASSED WITH THE FOLLOWING PROVISO | | | | - GENERATOR SHALL BE SUBMITTED UNDER A SEPERATE PERMIT | | AND TO INCLUDE NEW SHOP DRAWINGS ALONG WITH MANUFACTURE | | SPECS. |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
P |
Date |
2016-09-21 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2016-09-21 |
Time |
12:41 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2016-09-21 |
Time |
12:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2016-07-20 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2016-07-20 |
Time |
10:24 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2016-07-20 |
Time |
10:24 |
Sent To |
|
|
Notes |
2016-07-20 10:35:21 | 1ST REVIEW | | | | | | | | GEORGE JOHNSON | | PLUMBING PLANS EXAMINER LL | | CITY OF WEST PALM BEACH | | DEVELOPMENT SERVICES | | BUILDING DIVISION | | 561-805-6711 | | [email protected] | | | | | | GAS COMMENTS: A SEPARATE GAS PERMIT IS REQUIRED | | | | 1. ORIGINAL GAS PLAN SHOWS 3/4 PE PIPE THIS PLAN SHOWS | | EXISTING AS 1IN. PLEASE CLARIFY. PER WPB AMEND. TP FBC | | 107.2.1 | | | | 2. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL | | CUT SECTIONS OF NEW PIPE AND CORRESPONDING LENGTHS PER | | FBC-2014 FUEL GAS, SECS. 402.4.1, 402.4.2. | | | | | | 3. SHOW TYPE OF PIPING MATERIAL BEING INSTALLED, ALL | | PIPE SIZES, AND THE EHD NUMBER OF CORRUGATED STAINLESS | | STEEL TUBING FOR EACH PIPE SIZE IF BEING USED. WPB | | AMENDMENTS TO FBC SEC. 107 | | | | 4. BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON | | THE SYSTEM. REFER TO THE FBC-2014 FUEL GAS SECS. 401.8 | | THRU 402.6.1 AND TABLES 402.4(1) THRU 402.4(37). | | | | 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, | | (METER), TO THE MOST REMOTE OUTLET IN THE BUILDING | | AND/OR SYSTEM PER THE FBC-2014 FUEL GAS APPENDIX A ? | | USE OF CAPACITY SECTION A.3.1(4) & 2014 FUEL GAS CODE | | SEC. 402.4.1. | | | | 6. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL | | GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA | | 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2 | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2016-09-21 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2016-09-21 |
Time |
12:42 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2016-08-29 |
Time |
14:48 |
Sent To |
|
|
Notes |
2016-08-29 14:48:47 | RESUB ROUTED TO GJOHNSON |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2016-07-20 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2016-07-20 |
Time |
10:43 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2016-07-12 |
Time |
10:08 |
Sent To |
|
|
Notes |
2016-07-13 10:08:27 | REVISION ROUTED TO MVALDES |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2016-09-21 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2016-09-21 |
Time |
12:41 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2016-09-21 |
Time |
12:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2016-07-20 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2016-07-20 |
Time |
10:38 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2016-07-20 |
Time |
10:38 |
Sent To |
|
|
Notes |
2016-07-20 10:42:49 | 1ST REVIEW | | | | | | | | GEORGE JOHNSON | | PLUMBING PLANS EXAMINER LL | | CITY OF WEST PALM BEACH | | DEVELOPMENT SERVICES | | BUILDING DIVISION | | 561-805-6711 | | [email protected] | | | | | | PLUMBING COMMENTS: | | | | 1. IS THE SHOWER THE ONLY PLUMBING WORK BEING DONE | | UNDER THIS PERMIT PLEASE CLARIFY. PER WPB AMEND. TO FBC | | 107.2.12. A | | | | 2. APPLICATION OF PLUMPING SUB PERMIT REQUIRED. PER WPB | | AMEND. TO FBC 105.1 |
|
|
|
Account Summary | Usage Policy | Privacy Policy