Plan Review Stops For Permit 16070292 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2016-09-09 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2016-09-09 |
Time |
15:56 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2016-09-09 |
Time |
15:56 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2016-07-29 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2016-07-29 |
Time |
10:41 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2016-07-29 |
Time |
10:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
3 |
Status |
P |
Date |
2016-09-09 |
|
|
Cont ID |
|
Sent By |
mgonzale |
Date |
2016-09-09 |
Time |
|
Rev Time |
1.00 |
Received By |
mgonzale |
Date |
2016-09-09 |
Time |
|
Sent To |
I |
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
P |
Date |
2016-08-25 |
|
|
Cont ID |
|
Sent By |
Mgonzale |
Date |
2016-08-25 |
Time |
|
Rev Time |
1.00 |
Received By |
mgonzale |
Date |
2016-08-25 |
Time |
|
Sent To |
I |
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
P |
Date |
2016-07-13 |
|
|
Cont ID |
|
Sent By |
mgonzale |
Date |
2016-07-13 |
Time |
|
Rev Time |
1.00 |
Received By |
mgonzale |
Date |
2016-07-13 |
Time |
|
Sent To |
Z |
|
Notes |
2016-07-13 10:47:50 | PLEASE FOLLOW APPROVED SITE PLAN LAYOUT. | | | | ALL ACCESS WAYS SHALL BE ADA ACCESSIBLE WITH PROPER | | SLOPES AND LANDINGS AS PER UNITED STATES ACCESS BOARD - | | ADA ACCESSIBILITY GUIDELINES (ADAAG). | | HTTPS://WWW.ACCESS-BOARD.GOV/GUIDELINES-AND-STANDARDS/B | | UILDINGS-AND-SITES/ABOUT-THE-ADA-STANDARDS/BACKGROUND/A | | DAAG | | WWW.ADA.ORG | | | | MANUEL JULIAN GONZALEZ | | ENGINEERING PROJECT COORDINATOR | | PUBLIC WORKS DEPARTMENT | | 401 CLEMATIS STREET, 4TH FLOOR | | WEST PALM BEACH, FL 33401 | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | MAIN PHONE: (561) 822-1200 | | DIRECT: (561) 494-1085 | | FAX: (561) 494-1116 | | EMAIL: [email protected] | | WWW.WPB.ORG/ENGINEERING | | |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
P |
Date |
2016-08-12 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2016-08-12 |
Time |
10:38 |
Rev Time |
0.25 |
Received By |
eschneid |
Date |
2016-08-12 |
Time |
10:38 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2016-09-09 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2016-09-09 |
Time |
15:55 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2016-08-25 |
Time |
08:07 |
Sent To |
|
|
Notes |
2016-08-26 08:07:22 | RESUB MID-CYCLE ROUTED TO ESCHNEIDER VIA ZONING INBOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2016-08-26 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2016-08-26 |
Time |
08:06 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2016-08-16 |
Time |
16:01 |
Sent To |
|
|
Notes |
2016-08-16 16:01:24 | RESUB ROUTED TO ESCHNEIDER VIA ZONING INBOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2016-08-11 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2016-08-11 |
Time |
17:15 |
Rev Time |
0.00 |
Received By |
eschneid |
Date |
2016-07-29 |
Time |
10:00 |
Sent To |
|
|
Notes |
2016-08-01 10:00:33 | RESUB ROUTED TO ESCHNEIDER VIA ZONING INBOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2016-07-29 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2016-07-29 |
Time |
10:41 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2016-07-08 |
Time |
10:42 |
Sent To |
Z |
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
P |
Date |
2016-08-30 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2016-08-30 |
Time |
09:48 |
Rev Time |
0.50 |
Received By |
eschneid |
Date |
2016-08-30 |
Time |
09:48 |
Sent To |
ENG |
|
Notes |
2016-08-30 10:21:37 | PASSED | | | | THE PBDA PLAT SHALL BE RECORDED PRIOR TO ISSUANCE OF | | FINAL 104 INSPECTION APPROVAL. | 2016-08-26 15:47:53 | ROUTED TO ERIC SCHNIEDER |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
F |
Date |
2016-08-22 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2016-08-22 |
Time |
13:53 |
Rev Time |
0.50 |
Received By |
eschneid |
Date |
2016-08-22 |
Time |
11:56 |
Sent To |
ENG |
|
Notes |
2016-08-22 13:55:12 | FAILED | | | | 1) REPEAT COMMENT: THE CIVIL PLAN DOES NOT INCLUDE | | CONSTRUCTION DETAILS FOR THE NEW WESTERN FOUR PARKING | | SPACES. PLEASE NOTE THEY ARE SHOWN IN THE CORRECT | | LOCATION AND WITH THE CORRECT, EXISTING SIDEWALK | | CONNECTION TO THE SCHOOL. CONTRARY TO THE PERMIT REVIEW | | RESPONSE COMMENTS, THE SPACES ARE NOT SHOWN ON THE | | PHASE 3 PLANS. THEY ARE INCORRECTLY SHOWN AS EXISTING | | ON THE CIVIL MASTER PLAN. PROVIDE DETAILS OF THIS WORK | | SINCE IT IS SHOWN WITHIN THE SCOPE OF WORK ON THE | | ARCHITECTURAL SITE PLAN. | | | | 2) REPEAT COMMENT: THE CIVIL PLANS DO NOT SHOW THE FULL | | LENGTH OF THE SIDEWALK CONNECTING THE EASTERN PARKING | | SPACES TO THE EXISTING SCHOOL, NOR THE NEW SIDEWALK | | SHOWN ON THE ARCHITECTURAL PLANS BY THE PLAYGROUND. ALL | | PLANS SHALL MATCH. WHILE THE PROVIDED LANDSCAPE PLANS | | BY COTLEUR HEARING SHOW THE SIDEWALK LOCATION, THERE | | ARE NO DETAILS PROVIDED THAT CAN BE USED FOR | | CONSTRUCTION OF THE SIDEWALK, SUCH AS SIDEWALK WIDTH OR | | ELEVATION. THE CONTRACTOR WILL CONSTRUCT THE SIDEWALK | | FROM THE CIVIL PLANS, NOT THE LANDSCAPE PLAN. | | | | 3) REPEAT COMMENT: THE CIVIL PLANS SHALL SHOW THE WORK | | BEING DONE NOW ON ONE PLAN, NOT A PHASE 2 AND PHASE 3 | | PLAN THAT SHOW DIFFERING SCOPES OF WORK. THE COTLEUR | | HEARING PLANS ARE NOT CONSTRUCTION PLANS. | | | | 4) REPEAT COMMENT: THE CIVIL PLANS SHALL ALSO MATCH THE | | ARCHITECTURAL SITE PLAN AT THE TERMINUS OF ORANGE | | COURT. THE CIVIL PLAN SHOWS A RAMP TO PERMIT WALKING | | ACROSS THE PARKING LOT, YET THE CIVIL PLANS TERMINATE | | THE WALKWAY PRIOR TO THE CURB LINE. IN ANY EVENT THERE | | SHOULD BE A SMOOTHER TRANSITION FROM THE TERMINUS TO | | THE WALKWAY TO THE SOUTH. ALL PLANS SHALL SHOW THE SAME | | CONDITION. | | | | 5) THE LANDSCAPE PLAN PROVIDED WITH THIS PERMIT DOES | | NOT CORRECTLY SHOW THE CONFIGURATION OF THE WESTERN | | PARKING LOT. | | | | 5) THE PBDA PLAT SHALL BE RECORDED PRIOR TO ISSUANCE OF | | FINAL 104 INSPECTION APPROVAL. | | | | PLEASE CONTACT ERIC SCHNEIDER @ (561) 822-1446. | | | 2016-08-17 08:18:13 | ROUTED TO ERIC SCHNEIDER |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2016-08-11 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2016-08-11 |
Time |
16:34 |
Rev Time |
0.50 |
Received By |
eschneid |
Date |
2016-08-05 |
Time |
15:01 |
Sent To |
|
|
Notes |
2016-08-11 17:15:37 | FAILED | | | | 1) THE CIVIL PLAN DOES NOT INCLUDE CONSTRUCTION DETAILS | | FOR THE NEW WESTERN FOUR PARKING SPACES. PLEASE NOTE | | THEY ARE SHOWN IN THE CORRECT LOCATION AND WITH THE | | CORRECT, EXISTING SIDEWALK CONNECTION TO THE SCHOOL. | | | | 2) THE ARCHITECTURAL SITE PLAN INCORRECTLY SHOWS THE | | CURRENT AND FUTURE LAYOUT OF THE ENTIRE WESTERN PARKING | | AREA. PLEASE ENSURE THAT THE CORRECT EXISTING AND | | APPROVED BASE INFORMATION IS USED ON THE ARCHITECTURAL | | SITE PLANS. | | | | 3) THE CIVIL PLANS DO NOT SHOW THE FULL LENGTH OF THE | | SIDEWALK CONNECTING THE EASTERN PARKING SPACES TO THE | | EXISTING SCHOOL, NOR THE NEW SIDEWALK SHOWN ON THE | | ARCHITECTURAL PLANS BY THE PLAYGROUND. ALL PLANS SHALL | | MATCH. | | | | 4) THE CIVIL PLANS SHALL SHOW THE WORK BEING DONE NOW | | ON ONE PLAN, NOT A PHASE 2 AND PHASE 3 PLAN THAT SHOW | | DIFFERING SCOPES OF WORK. | | | | 5) THESE PLANS SHALL ALSO MATCH THE ARCHITECTURAL SITE | | PLAN AT THE TERMINUS OF ORANGE COURT. THE CIVIL PLAN | | SHOWS A RAMP TO PERMIT WALKING ACROSS THE PARKING LOT, | | YET THE CIVIL PLANS TERMINATE THE WALKWAY PRIOR TO THE | | CURB LINE. IN ANY EVENT THERE SHOULD BE A SMOOTHER | | TRANSITION FROM THE TERMINUS TO THE WALKWAY TO THE | | SOUTH. | | | | 6) NO PAVER DETAILS WERE PROVIDED. | | | | 7) THE PBDA PLAT SHALL BE RECORDED PRIOR TO ISSUANCE OF | | FINAL 104 INSPECTION APPOVAL. | | | | PLEASE CONTACT ERIC SCHNEIDER @ (561) 822-1446. | 2016-08-01 15:07:21 | ROUTED TO ERIC SCHNEIDER |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2016-07-26 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2016-07-29 |
Time |
10:41 |
Rev Time |
0.50 |
Received By |
eschneid |
Date |
2016-07-26 |
Time |
08:48 |
Sent To |
B |
|
Notes |
2016-07-26 08:51:34 | FAILED | | | | ZONING WAS UNSURE WHAT THE PERMIT ENTAILED AND | | CONTACTED ADAM WITH IBIS. HE STATED THAT THEY WILL BE | | RESUBMITTING AN AMENDED PLAN WHICH ZONING WILL REVIEW | | AT TIME OF RESUBMITAL. | | | | THIS DOES NOT COUNT AS 1ST ZONING REVIEW. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. |
|
|