Plan Review Details - Permit 16070292
Plan Review Stops For Permit 16070292
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2016-09-09 Cont ID  
Sent By cthroop Date 2016-09-09 Time 15:56 Rev Time 0.00
Received By cthroop Date 2016-09-09 Time 15:56 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2016-07-29 Cont ID  
Sent By cthroop Date 2016-07-29 Time 10:41 Rev Time 0.00
Received By cthroop Date 2016-07-29 Time 10:41 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2016-09-09 Cont ID  
Sent By mgonzale Date 2016-09-09 Time   Rev Time 1.00
Received By mgonzale Date 2016-09-09 Time   Sent To I
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2016-08-25 Cont ID  
Sent By Mgonzale Date 2016-08-25 Time   Rev Time 1.00
Received By mgonzale Date 2016-08-25 Time   Sent To I
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2016-07-13 Cont ID  
Sent By mgonzale Date 2016-07-13 Time   Rev Time 1.00
Received By mgonzale Date 2016-07-13 Time   Sent To Z
Notes
2016-07-13 10:47:50PLEASE FOLLOW APPROVED SITE PLAN LAYOUT.
  
 ALL ACCESS WAYS SHALL BE ADA ACCESSIBLE WITH PROPER
 SLOPES AND LANDINGS AS PER UNITED STATES ACCESS BOARD -
 ADA ACCESSIBILITY GUIDELINES (ADAAG).
 HTTPS://WWW.ACCESS-BOARD.GOV/GUIDELINES-AND-STANDARDS/B
 UILDINGS-AND-SITES/ABOUT-THE-ADA-STANDARDS/BACKGROUND/A
 DAAG
 WWW.ADA.ORG
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2016-08-12 Cont ID  
Sent By eschneid Date 2016-08-12 Time 10:38 Rev Time 0.25
Received By eschneid Date 2016-08-12 Time 10:38 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2016-09-09 Cont ID  
Sent By cthroop Date 2016-09-09 Time 15:55 Rev Time 0.00
Received By cthroop Date 2016-08-25 Time 08:07 Sent To  
Notes
2016-08-26 08:07:22RESUB MID-CYCLE ROUTED TO ESCHNEIDER VIA ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2016-08-26 Cont ID  
Sent By lmarchan Date 2016-08-26 Time 08:06 Rev Time 0.00
Received By lmarchan Date 2016-08-16 Time 16:01 Sent To  
Notes
2016-08-16 16:01:24RESUB ROUTED TO ESCHNEIDER VIA ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-08-11 Cont ID  
Sent By eschneid Date 2016-08-11 Time 17:15 Rev Time 0.00
Received By eschneid Date 2016-07-29 Time 10:00 Sent To  
Notes
2016-08-01 10:00:33RESUB ROUTED TO ESCHNEIDER VIA ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-07-29 Cont ID  
Sent By cthroop Date 2016-07-29 Time 10:41 Rev Time 0.00
Received By cthroop Date 2016-07-08 Time 10:42 Sent To Z
Notes
***NONE***

Review Stop Z ZONING
Rev No 4 Status P Date 2016-08-30 Cont ID  
Sent By eschneid Date 2016-08-30 Time 09:48 Rev Time 0.50
Received By eschneid Date 2016-08-30 Time 09:48 Sent To ENG
Notes
2016-08-30 10:21:37PASSED
  
 THE PBDA PLAT SHALL BE RECORDED PRIOR TO ISSUANCE OF
 FINAL 104 INSPECTION APPROVAL.
2016-08-26 15:47:53ROUTED TO ERIC SCHNIEDER

Review Stop Z ZONING
Rev No 3 Status F Date 2016-08-22 Cont ID  
Sent By eschneid Date 2016-08-22 Time 13:53 Rev Time 0.50
Received By eschneid Date 2016-08-22 Time 11:56 Sent To ENG
Notes
2016-08-22 13:55:12FAILED
  
 1) REPEAT COMMENT: THE CIVIL PLAN DOES NOT INCLUDE
 CONSTRUCTION DETAILS FOR THE NEW WESTERN FOUR PARKING
 SPACES. PLEASE NOTE THEY ARE SHOWN IN THE CORRECT
 LOCATION AND WITH THE CORRECT, EXISTING SIDEWALK
 CONNECTION TO THE SCHOOL. CONTRARY TO THE PERMIT REVIEW
 RESPONSE COMMENTS, THE SPACES ARE NOT SHOWN ON THE
 PHASE 3 PLANS. THEY ARE INCORRECTLY SHOWN AS EXISTING
 ON THE CIVIL MASTER PLAN. PROVIDE DETAILS OF THIS WORK
 SINCE IT IS SHOWN WITHIN THE SCOPE OF WORK ON THE
 ARCHITECTURAL SITE PLAN.
  
 2) REPEAT COMMENT: THE CIVIL PLANS DO NOT SHOW THE FULL
 LENGTH OF THE SIDEWALK CONNECTING THE EASTERN PARKING
 SPACES TO THE EXISTING SCHOOL, NOR THE NEW SIDEWALK
 SHOWN ON THE ARCHITECTURAL PLANS BY THE PLAYGROUND. ALL
 PLANS SHALL MATCH. WHILE THE PROVIDED LANDSCAPE PLANS
 BY COTLEUR HEARING SHOW THE SIDEWALK LOCATION, THERE
 ARE NO DETAILS PROVIDED THAT CAN BE USED FOR
 CONSTRUCTION OF THE SIDEWALK, SUCH AS SIDEWALK WIDTH OR
 ELEVATION. THE CONTRACTOR WILL CONSTRUCT THE SIDEWALK
 FROM THE CIVIL PLANS, NOT THE LANDSCAPE PLAN.
  
 3) REPEAT COMMENT: THE CIVIL PLANS SHALL SHOW THE WORK
 BEING DONE NOW ON ONE PLAN, NOT A PHASE 2 AND PHASE 3
 PLAN THAT SHOW DIFFERING SCOPES OF WORK. THE COTLEUR
 HEARING PLANS ARE NOT CONSTRUCTION PLANS.
  
 4) REPEAT COMMENT: THE CIVIL PLANS SHALL ALSO MATCH THE
 ARCHITECTURAL SITE PLAN AT THE TERMINUS OF ORANGE
 COURT. THE CIVIL PLAN SHOWS A RAMP TO PERMIT WALKING
 ACROSS THE PARKING LOT, YET THE CIVIL PLANS TERMINATE
 THE WALKWAY PRIOR TO THE CURB LINE. IN ANY EVENT THERE
 SHOULD BE A SMOOTHER TRANSITION FROM THE TERMINUS TO
 THE WALKWAY TO THE SOUTH. ALL PLANS SHALL SHOW THE SAME
 CONDITION.
  
 5) THE LANDSCAPE PLAN PROVIDED WITH THIS PERMIT DOES
 NOT CORRECTLY SHOW THE CONFIGURATION OF THE WESTERN
 PARKING LOT.
  
 5) THE PBDA PLAT SHALL BE RECORDED PRIOR TO ISSUANCE OF
 FINAL 104 INSPECTION APPROVAL.
  
 PLEASE CONTACT ERIC SCHNEIDER @ (561) 822-1446.
  
2016-08-17 08:18:13ROUTED TO ERIC SCHNEIDER

Review Stop Z ZONING
Rev No 2 Status F Date 2016-08-11 Cont ID  
Sent By eschneid Date 2016-08-11 Time 16:34 Rev Time 0.50
Received By eschneid Date 2016-08-05 Time 15:01 Sent To  
Notes
2016-08-11 17:15:37FAILED
  
 1) THE CIVIL PLAN DOES NOT INCLUDE CONSTRUCTION DETAILS
 FOR THE NEW WESTERN FOUR PARKING SPACES. PLEASE NOTE
 THEY ARE SHOWN IN THE CORRECT LOCATION AND WITH THE
 CORRECT, EXISTING SIDEWALK CONNECTION TO THE SCHOOL.
  
 2) THE ARCHITECTURAL SITE PLAN INCORRECTLY SHOWS THE
 CURRENT AND FUTURE LAYOUT OF THE ENTIRE WESTERN PARKING
 AREA. PLEASE ENSURE THAT THE CORRECT EXISTING AND
 APPROVED BASE INFORMATION IS USED ON THE ARCHITECTURAL
 SITE PLANS.
  
 3) THE CIVIL PLANS DO NOT SHOW THE FULL LENGTH OF THE
 SIDEWALK CONNECTING THE EASTERN PARKING SPACES TO THE
 EXISTING SCHOOL, NOR THE NEW SIDEWALK SHOWN ON THE
 ARCHITECTURAL PLANS BY THE PLAYGROUND. ALL PLANS SHALL
 MATCH.
  
 4) THE CIVIL PLANS SHALL SHOW THE WORK BEING DONE NOW
 ON ONE PLAN, NOT A PHASE 2 AND PHASE 3 PLAN THAT SHOW
 DIFFERING SCOPES OF WORK.
  
 5) THESE PLANS SHALL ALSO MATCH THE ARCHITECTURAL SITE
 PLAN AT THE TERMINUS OF ORANGE COURT. THE CIVIL PLAN
 SHOWS A RAMP TO PERMIT WALKING ACROSS THE PARKING LOT,
 YET THE CIVIL PLANS TERMINATE THE WALKWAY PRIOR TO THE
 CURB LINE. IN ANY EVENT THERE SHOULD BE A SMOOTHER
 TRANSITION FROM THE TERMINUS TO THE WALKWAY TO THE
 SOUTH.
  
 6) NO PAVER DETAILS WERE PROVIDED.
  
 7) THE PBDA PLAT SHALL BE RECORDED PRIOR TO ISSUANCE OF
 FINAL 104 INSPECTION APPOVAL.
  
 PLEASE CONTACT ERIC SCHNEIDER @ (561) 822-1446.
2016-08-01 15:07:21ROUTED TO ERIC SCHNEIDER

Review Stop Z ZONING
Rev No 1 Status F Date 2016-07-26 Cont ID  
Sent By cthroop Date 2016-07-29 Time 10:41 Rev Time 0.50
Received By eschneid Date 2016-07-26 Time 08:48 Sent To B
Notes
2016-07-26 08:51:34FAILED
  
 ZONING WAS UNSURE WHAT THE PERMIT ENTAILED AND
 CONTACTED ADAM WITH IBIS. HE STATED THAT THEY WILL BE
 RESUBMITTING AN AMENDED PLAN WHICH ZONING WILL REVIEW
 AT TIME OF RESUBMITAL.
  
 THIS DOES NOT COUNT AS 1ST ZONING REVIEW.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.


Account Summary | Usage Policy | Privacy Policy