Plan Review Details - Permit 16070163
Plan Review Stops For Permit 16070163
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status N Date 2016-07-13 Cont ID  
Sent By skennedy Date 2016-07-13 Time 12:35 Rev Time 0.00
Received By skennedy Date 2016-07-13 Time 12:35 Sent To  
Notes
2016-07-13 12:36:43EXEMPT PER FBC 102.2 (D) IN PLACE LESS THAN 180 DAYS.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2016-07-18 Cont ID  
Sent By pleduc Date 2016-07-18 Time   Rev Time 0.00
Received By pleduc Date 2016-07-18 Time 15:09 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-07-18 Cont ID  
Sent By pleduc Date 2016-07-18 Time   Rev Time 0.00
Received By pleduc Date 2016-07-06 Time 11:11 Sent To  
Notes
2016-07-07 11:11:55ROUTED TO ZONING

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status F Date 2016-08-18 Cont ID  
Sent By shill Date 2016-08-18 Time 16:32 Rev Time 0.00
Received By shill Date 2016-08-18 Time 16:32 Sent To  
Notes
2016-08-18 16:45:51****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. REVISE SITE PLAN TO INCLUDE THE FOLLOWING, PER CRS
 REQUIREMENT RA3 (SENT TO CONTRACTOR VIA EMAIL):
  
 A. THE SITE PLAN'S SCALE AND NORTH ORIENTATION ARROW;
 B. THE PARCEL BOUNDAIRES AND THE LOCATION AND NAMES OF
 ADJACENT STREETS;
 C. N/A (NO WATERCOURSES LOCATED ON PARCEL)
 D. ALL FLOODPLAIN BOUNDARIES THAT RUN THROUGH THE
 PARCEL;
 E. N/A
 F. ALL DRAINAGE AND UTILITY EASEMENTS;
 G. ALL AREAS TO BE CLEARED, CUT, GRADED, OR FILLED; AND
 H. THE LOCATOIN OF THE PROPOSED STRUCTURE.
  
 2. REVISE SITE PLAN TO INCLUDE:
 A. THE FOOTPRINT OF ALL EXISTING AND PROPOSED BUILDINGS
 AND BUILDING ADDITIONS
 B. PROVIDE THE ELEVATION OF THE PROPOSED FINISHED FLOOR
  
 3. THE FIRST INSPECTION FOR RA3 IS NOT APPLICABLE TO
 THIS PROJECT.
  
 4. THE SECOND INSPECTION IS CONDUCTED WHEN THE LOWEST
 FLOOR IS BUILT. THE SURVEYED LOWEST FLOOR ELEVATION IS
 REQUIRED. THIS IS REQUIRED PRIOR TO SETTING THE
 TRAILER.
 IF YOU HAVE TOPOS AVAILABLE AND THIS TEMPORARY
 STRUCTURE IS BEING SET DIRECTLY ON THE GROUND, AND WILL
 BE SET AT 7.5' NGVD29 OR ABOVE, THE TOPOS ARE
 SUFFICIENT.
  
 5. THE THIRD INSPECTION IS CONDUCTED WHEN THE PROJECT
 IS FINISHED. A "FINISHED CONSTRUCTION" ELEVATION
 CERTIFICATE IS REQUIRED.
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2016-07-15 Cont ID  
Sent By jroach Date 2016-07-15 Time 13:54 Rev Time 0.00
Received By jroach Date 2016-07-15 Time 13:54 Sent To FIRE
Notes
2016-07-15 13:54:46PROVISO
  
 ALL CONSTRUCTION TRAILERS SHALL BE REMOVED WITHIN SEVEN
 DAYS OF THE FINAL CONSTRUCTION INSPECTION BY THE CITY
 AND PRIOR TO THE ISSUANCE OF A CERTIFICATE OF
 OCCUPANCY.
  
  
 QUESTIONS/COMMENTS, CONTACT
 JOHN ROACH, PRINCIPAL PLANNER, AT
 [email protected] OR (561) 822-1448.
  
2016-07-08 09:38:337/8/16
  
 SENT TO JOHN ROACH