Plan Review Details - Permit 16061560
Plan Review Stops For Permit 16061560
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2016-07-12 Cont ID  
Sent By cthroop Date 2016-07-12 Time 10:35 Rev Time 0.00
Received By cthroop Date 2016-07-12 Time 10:35 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2016-08-09 Cont ID  
Sent By vperez Date 2016-08-09 Time 07:26 Rev Time 0.00
Received By vperez Date 2016-08-09 Time 07:26 Sent To  
Notes
2016-08-09 07:27:34PROVISO: ELECTRICAL APPROVED PENDING ZONING COMMENTS
 ADDRESSED REGARDING TRANSFORMER LOCATION

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2016-07-25 Cont ID  
Sent By vperez Date 2016-07-25 Time 07:38 Rev Time 0.00
Received By vperez Date 2016-07-25 Time 07:38 Sent To  
Notes
2016-07-25 07:40:482ND ELECTRICAL PLAN REVIEW
  
 APPLICABLE CODES IN EFFECT:
 FLORIDA BUILDING CODE 2014 5TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH
 EDITION
 NFPA 70- 2011
 COMMENTS:
  
 1. PLEASE ADDRESS PENDIND ZONING COMMENTS2ND REVIEW FOR
 AN ELECTRICAL APPROVAL.
  
  
 VALENTINO PEREZ
 ELECTRICAL PLANS EXAMINER II
 561-805-6717
 [email protected]
  
  
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2016-07-12 Cont ID  
Sent By vperez Date 2016-07-12 Time 09:45 Rev Time 0.00
Received By vperez Date 2016-07-12 Time 09:45 Sent To  
Notes
2016-07-12 09:46:16INITIAL ELECTRICAL PLAN REVIEW
  
 APPLICABLE CODES IN EFFECT:
 FLORIDA BUILDING CODE 2014 5TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH
 EDITION
 NFPA 70- 2011
 COMMENTS:
  
 1. PLEASE ADDRESS ZONING COMMENTS FOR A COMPLETE
 ELECTRICAL REVIEW AND APPROVAL.
 2. COMMENTS MAY FOLLOW UPON RE-REVIEW. PLEASE FEEL FREE
 TO CONTACT ME SHOULD YOU HAVE ANY QUESTIONS REGARDING
 THIS PROJECT.
  
  
 VALENTINO PEREZ
 ELECTRICAL PLANS EXAMINER II
 561-805-6717
 [email protected]
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2016-08-11 Cont ID  
Sent By cpuell Date 2016-08-11 Time 15:09 Rev Time 0.00
Received By cpuell Date 2016-08-02 Time 10:00 Sent To  
Notes
2016-08-03 10:00:38ROUTED TO ESCHNEIDER VIA ZONING

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-07-25 Cont ID  
Sent By vperez Date 2016-07-25 Time 07:40 Rev Time 0.00
Received By vperez Date 2016-07-25 Time 07:40 Sent To  
Notes
2016-07-20 11:01:15RESUB ROUTED TO ESCHNEIDER VIA ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-07-12 Cont ID  
Sent By cthroop Date 2016-07-12 Time 10:35 Rev Time 0.00
Received By cthroop Date 2016-06-28 Time 10:45 Sent To Z
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status P Date 2016-08-11 Cont ID  
Sent By eschneid Date 2016-08-11 Time 15:02 Rev Time 0.50
Received By eschneid Date 2016-08-11 Time 15:02 Sent To PC
Notes
2016-08-11 15:03:44ALL POLE AND BOLLARD LIGHTS TO MATCH EXISTING LIGHTS
 FOR STYLE, HEIGHT AND COLOR.
2016-08-03 13:40:00ROUTED TO ERIC SCHNEIDER

Review Stop Z ZONING
Rev No 2 Status F Date 2016-07-22 Cont ID  
Sent By eschneid Date 2016-07-22 Time 14:48 Rev Time 0.50
Received By eschneid Date 2016-07-22 Time 14:48 Sent To E
Notes
2016-07-22 14:50:19FAILED
  
 1) REPEAT COMMENT: THE PLANS DO NOT MATCH THE APPROVED
 SITE PLANS CREATED BY E&C ENGINEERS FOR THE PEDESTRIAN
 PATH. NO REVISED SHEET E0.2 WAS PROVIDED.
  
 A. THE TRANSFORMER SHOWN IN THE SOUTHWEST CORNER OF THE
 SITE IS NOT PERMITTED IN THIS LOCATION. IT CONFLICTS
 WITH THE APPROVED PEDESTRIAN WALKWAY. THE WALKWAY SHOWN
 ON THESE PLANS IS NOT IN THE CORRECT LOCATION.
 B. THE BOLLARD LIGHTS ARE NOT SHOWN IN THEIR APPROVED
 LOCATIONS AND SOME ARE EVEN SHOWN IN THE PEDESTRIAN
 WALKWAY.
  
 2) REPEAT COMMENT: LIGHTING IS NOT APPROVED ON THE
 FIELD. THE COTLEUR AND HEARING MASTER SITE PLAN APPEARS
 TO INCLUDE TWO LIGHTS ADJACENT TO TUXEDO LANE ON THE
 NORTH BOUNDARY OF THE FIELD. THE FOUR LIGHTS ON THE
 FIELD ARE NOT ON ANY APPROVED PLANS.
  
 3) REVISED COMMENT: THE PHOTOMETRIC PLANS SHALL SHOW
 THE LIGHT LEVEL AT THE PROPERTY LINE. THE LIGHTING
 SHALL NOT EXCEED 0.5 FOOT CANDLES ALONG ORANGE COURT
 AND COCOANUT LANE.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.
  

Review Stop Z ZONING
Rev No 1 Status F Date 2016-07-11 Cont ID  
Sent By cthroop Date 2016-07-12 Time 10:35 Rev Time 0.50
Received By eschneid Date 2016-07-11 Time 20:18 Sent To E
Notes
2016-07-11 20:29:46FAILED
  
 1) THE PLANS DO NOT MATCH THE APPROVED SITE PLANS
 CREATED BY E&C ENGINEERS.
  
 A. THE TRANSFORMER SHOWN IN THE SOUTHWEST CORNER OF THE
 SITE IS NOT PERMITTED IN THIS LOCATION. IT CONFLICTS
 WITH THE APPROVED PEDESTRIAN WALKWAY. THE WALKWAY SHOWN
 ON THESE PLANS IS NOT IN THE CORRECT LOCATION.
 B. THE BOLLARD LIGHTS ARE NOT SHOWN IN THEIR APPROVED
 LOCATIONS AND SOME ARE EVEN SHOWN IN THE PEDESTRIAN
 WALKWAY.
 C. THERE ARE NO DETAILS PROVIDED FOR WHAT THE BOLLARD
 LIGHTS LOOK LIKE; HOWEVER, THE DESCRIPTION IS DIFFERENT
 THAN WHAT IS SHOWN ON THE APPROVED PLANS.
  
 2) LIGHTING IS NOT APPROVED ON THE FIELD.
  
 3) NO PHOTOMETRIC PLANS WHERE PROVIDED WITH THE PERMIT.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.


Account Summary | Usage Policy | Privacy Policy