Plan Review Details - Permit 16060936
Plan Review Stops For Permit 16060936 |
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
P |
Date |
2016-06-21 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-06-21 |
Time |
10:04 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-06-21 |
Time |
10:04 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2016-06-17 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-06-17 |
Time |
05:08 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-06-17 |
Time |
05:07 |
Sent To |
|
|
Notes |
2016-06-17 05:09:38 | 1) SUBMIT TWO COPIES OF THE TANKLESS WATER HEATER | | SPECS.WPB AMEND. TO FBC SEC. 107.1. | | 2) IS THIS TANKLESS WATER HEATER REPLACING AN EXISTING | | TANKLESS WATER HEATER OR IS IT REPLACING A STORAGE TANK | | TYPE WATER HEATER OR IS IT BEING ADDED TO THEEXISTING | | HOT WATER SYSTEM? INDICATE ON THE APPLICATION IN THE | | DESCRIPTION OF WORK. | | 3) SUBMIT A FLOOR PLAN SHOWING THE LOCATION OF THE NEW | | TANKLESS WATER HEATER. | | 4) IS THIS TANKLESS WATER BEING ADDED TO AN EXISTING | | GAS SYSTEM? SUBMIT A COMPLETE GAS RISER WITH ALL PIPE | | SIZES, TYPE OF PIPE, THE DEVELOPED LENGTH TO THE | | FURTHEST GAS OUTLET, THE BTU LOAD OF EACH APPLIANCE, | | THE PSI OF THE SYSTEM, TYPE OF GAS AND THE TOTAL BTU | | LOAD ON THE SYSTEM.DO THE SAME IF IT IS A NEW GAS | | SYSTEM | | 5) TYPE OF GAS (LP OR NATURAL). | | 6) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / | | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY | | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND | | FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014 | | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED | | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS | | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF | | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. | | 7) AN ADDITIONAL APPLICATION IS REQUIRED TO INSTALL THE | | WATER LINES FOR THE HEATER. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2016-06-21 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-06-21 |
Time |
10:04 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-06-21 |
Time |
10:04 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2016-06-17 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-06-17 |
Time |
04:38 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-06-15 |
Time |
15:38 |
Sent To |
|
|
Notes |
2016-06-16 15:38:40 | PLUMB - $5000 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2016-06-23 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2016-06-23 |
Time |
12:57 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2016-06-23 |
Time |
12:57 |
Sent To |
|
|
Notes |
2016-06-23 12:58:24 | APPROVED PER TIM LARGE UNDER PER 16060934 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2016-06-17 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-06-17 |
Time |
04:38 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-06-17 |
Time |
04:09 |
Sent To |
|
|
Notes |
2016-06-17 04:38:19 | 1) SUBMIT TWO COPIES OF THE TANKLESS WATER HEATER | | SPECS.WPB AMEND. TO FBC SEC. 107.1. | | 2) IS THIS TANKLESS WATER HEATER REPLACING AN EXISTING | | TANKLESS WATER HEATER OR IS IT REPLACING A STORAGE TANK | | TYPE WATER HEATER OR IS IT BEING ADDED TO THEEXISTING | | HOT WATER SYSTEM? INDICATE ON THE APPLICATION IN THE | | DESCRIPTION OF WORK. | | 3) SUBMIT A FLOOR PLAN SHOWING THE LOCATION OF THE NEW | | TANKLESS WATER HEATER. | | 4) IS THIS TANKLESS WATER BEING ADDED TO AN EXISTING | | GAS SYSTEM? SUBMIT A COMPLETE GAS RISER WITH ALL PIPE | | SIZES, TYPE OF PIPE, THE DEVELOPED LENGTH TO THE | | FURTHEST GAS OUTLET, THE BTU LOAD OF EACH APPLIANCE, | | THE PSI OF THE SYSTEM, TYPE OF GAS AND THE TOTAL BTU | | LOAD ON THE SYSTEM.DO THE SAME IF IT IS A NEW GAS | | SYSTEM | | 5) TYPE OF GAS (LP OR NATURAL). | | 6) SUBMIT MANUFACTURER?S SPECIFICATION SHEETS / | | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY | | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND | | FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014 | | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED | | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS | | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF | | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. | | 7) AN ADDITIONAL APPLICATION IS REQUIRED TO INSTALL THE | | WATER LINES FOR THE HEATER. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | |
|
|
|