Plan Review Details - Permit 16050721
Plan Review Stops For Permit 16050721 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2016-07-13 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2016-07-13 |
Time |
10:56 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2016-07-13 |
Time |
10:56 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2016-06-13 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2016-06-13 |
Time |
18:08 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2016-06-13 |
Time |
18:08 |
Sent To |
|
|
Notes |
2016-06-13 18:08:20 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC FIFTH EDITION (2014) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE SUBSTRATE IS LISTED AS CONCRETE BLOCK ON THE | | INSTALLATION SCHEDULE FOR ALL OPENINGS AND THE SPACING | | MARKED ON THE PRODUCT APPROVAL FOR SOME OF THE STORM | | PANELS AND ACCORDIONS IS FOR POURED CONCRETE. FBC | | 107.2.3 THE TABLES ARE SEPARATED INTO POURED CONCRETE | | AND CONCRETE BLOCK COLUMNS ON BOTH THE ACCORDION | | SHUTTER AND PANEL PRODUCT APPROVALS. IDENTIFY THE | | SUBSTRATE THAT YOU WILL BE FASTENING TO AND SELECT THE | | FASTENER SPACING FOR THE TYPE OF MOUNT FROM THE | | APPROPRIATE COLUMN. | | | | 2) THE GLASS SEPARATION DISTANCE IS MORE THAN 1" FOR | | BOTH THE PANEL AND THE ACCORDION SHUTTER PRODUCT | | APPROVALS. PLEASE CORRECT THE INSTALLATION SCHEDULE. | | FBC R301.1 | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2016-05-24 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2016-05-24 |
Time |
14:53 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2016-05-24 |
Time |
14:53 |
Sent To |
|
|
Notes |
2016-05-24 14:53:27 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC FIFTH EDITION (2014) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE INSTALLATION SCHEDULE IS NOT CLEAR WHICH ONES | | ARE THE STORM PANELS AND WHICH ARE THE ACCORDIONS. THE | | SUBSTRATE IS LISTED AS CONCRETE BLOCK ON THE | | INSTALLATION SCHEDULE FOR ALL OPENINGS AND THE SPACING | | MARKED ON THE PRODUCT APPROVAL FOR SOME OF THE STORM | | PANELS AND ACCORDIONS IS FOR POURED CONCRETE. FBC | | 107.2.3 | | | | 2) FOR THE SHUTTER MOUNTING TYPE ON THE INSTALLATION | | SCHEDULE YOU NEED TO LIST THE SPECIFIC NUMBER FROM THE | | PRODUCT APPROVAL FOR THE TOP AND BOTTOM MOUNTING TYPE | | FOR EACH OPENING. FBC 107.2.3 | | | | 3) INDICATE WHICH OPENINGS HAVE PANELS AND WHICH HAVE | | ACCORDIONS. FBC 107.2.3 | | | | 4) TWO COPIES OF THE CONSTRUCTION DOCUMENTS ARE | | REQUIRED TO BE SUBMITTED AND ONLY ONE WAS SUBMITTED. I | | MADE COPIES FOR YOU THIS TIME, HOWEVER, FUTURE | | SUBMITTALS WILL BE DENIED. FBC 107.1 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2016-07-13 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2016-07-13 |
Time |
10:57 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2016-06-30 |
Time |
14:29 |
Sent To |
|
|
Notes |
2016-06-30 14:29:50 | RESUB ROUTED TO RMCDOUGAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2016-06-13 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2016-06-13 |
Time |
18:08 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2016-06-06 |
Time |
10:04 |
Sent To |
|
|
Notes |
2016-06-07 10:04:21 | RESUB ROUTED TO RMCDOUGAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2016-06-13 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2016-05-24 |
Time |
18:08 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2016-05-17 |
Time |
10:32 |
Sent To |
|
|
Notes |
2016-05-18 10:32:58 | BLDG MISC 1 |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |