Plan Review Details - Permit 16050367
Plan Review Stops For Permit 16050367
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2016-07-13 Cont ID  
Sent By cthroop Date 2016-07-13 Time 11:14 Rev Time 0.00
Received By cthroop Date 2016-07-13 Time 11:14 Sent To Z
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2016-06-09 Cont ID  
Sent By cthroop Date 2016-06-09 Time 08:41 Rev Time 0.00
Received By cthroop Date 2016-06-07 Time 09:16 Sent To Z
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 1 Status N Date 2016-06-10 Cont ID  
Sent By eschneid Date 2016-06-10 Time 10:53 Rev Time 0.00
Received By eschneid Date 2016-06-10 Time 10:53 Sent To  
Notes
2016-06-10 10:53:38WORK NOT OCCURRING IN HISTORIC PORTION OF SITE.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2016-07-21 Cont ID  
Sent By cpuell Date 2016-07-21 Time 08:40 Rev Time 0.00
Received By cpuell Date 2016-07-01 Time 09:45 Sent To  
Notes
2016-07-05 09:45:45RESUB ROUTED TO ESCHNEIDER VIA ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-06-29 Cont ID  
Sent By eschneid Date 2016-06-29 Time 18:00 Rev Time 0.00
Received By eschneid Date 2016-06-15 Time 13:24 Sent To  
Notes
2016-06-16 13:24:51RESUB ROUTED TO ESCHNEIDER VIA ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-06-10 Cont ID  
Sent By eschneid Date 2016-06-10 Time 11:34 Rev Time 0.00
Received By eschneid Date 2016-05-09 Time 10:24 Sent To  
Notes
2016-05-10 10:24:53ROTUED TO ZONING

Review Stop Z ZONING
Rev No 4 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
2016-07-27 13:51:23ROUTED TO ERIC SCHNEIDER

Review Stop Z ZONING
Rev No 3 Status P Date 2016-07-20 Cont ID  
Sent By eschneid Date 2016-07-20 Time 14:56 Rev Time 0.50
Received By eschneid Date 2016-07-20 Time 10:14 Sent To PC
Notes
2016-07-13 13:14:38ROUTED TO ERIC SCHNEIDER

Review Stop Z ZONING
Rev No 2 Status F Date 2016-06-29 Cont ID  
Sent By eschneid Date 2016-06-29 Time 16:49 Rev Time 1.00
Received By eschneid Date 2016-06-29 Time 16:49 Sent To  
Notes
2016-06-29 18:00:07FAILED
  
 1) REPEAT COMMENT: THE SITE WALL ON SHEET G2.1 IS
 DIFFERENT FROM THE SITE WALL ON SHEET S-1.1. ALL PLANS
 SHALL SHOW SAME CONDITIONS. THE SOUTHERN PORTION OF THE
 WALL SHOWN ON SHEET G2.1 RUNS EAST/WEST AND IS NOT
 SHOWN ON SHEET S-1.1. THE REFERENCED DETAILS ON SHEETS
 3.1 AND 3.3 STATE "SEE STRUCTURAL PLANS", YET THESE ARE
 NOT SHOWN ON THE PROVIDED PLANS.
  
 2) REPEAT COMMENT: THE PROPOSED WALL BLOCKS THE
 EXISTING PEDESTRIAN ACCESS EASEMENT. PROVIDE A PLAN
 THAT SHOWS HOW THE PEDESTRIAN ACCESS ACROSS THE SITE
 WILL BE MAINTAINED DURING THE CONSTRUCTION OF THE WALL.
 PLEASE NOTE THAT THE PEDESTRIAN ACCESS SHALL NOT BE
 IMPEDED DURING ANY PHASE OF CONSTRUCTION. CONDITION F
 OF THE RIGHT-OF-WAY PERMIT STATES THAT SAFE PASSAGEWAYS
 FOR PEDESTRIANS SHALL BE PROVIDED THRU THE WORK SITE.
  
 3) TAGS ON SHEET G2.1 WHICH REFERENCE SPECIFIC DETAILS
 ARE INCORRECTLY ORIENTED - EX. 06/G3.3 AND 03/G3.3. ALL
 DETAIL DRAWINGS SHALL BE CORRECTLY REFERENCED.
  
 4) PLEASE PROVIDE THE CROSS SECTION FOR HOW THE TRENCH
 DRAINS INTERACT WITH THE PENETRATION TO THE SITE WALL
 GIVEN THAT THERE IS A LARGE ELEVATION DIFFERENCE
 BETWEEN THE LEVEL OF THE PAVERS ON THE INSIDE OF THE
 SITE WALL AND THE DRAINAGE SWALE.
  
 5) THERE IS A POSSIBLE CONFLICT BETWEEN THE EXISTING
 STORMWATER AND SANITARY SEWER PIPES (SEE SIMMONS &
 WHITE PAVING AND DRAINAGE PLAN) AND THE PROPOSED WALL
 LOCATION. PROVIDE A CROSS SECTION THAT SHOWS THE DEPTH
 OF THE PIPES IN RELATIONSHIP TO THE PROPOSED SITE WALL
 FOOTERS TO VERIFY THAT THERE IS NO CONFLICT WITH THE
 CITY INFRASTRUCTURE. ALTERNATIVELY, PROVIDE
 VERIFICATION THAT THE PIPES HAVE BEEN RE-ROUTED PRIOR
 TO APPROVAL OF THE SITE WALL PERMIT.
  
 6) STAFF HAS NOTED THAT THE ARCHITECTURAL PLANS
 SUBMITTED AS PART OF THIS APPLICATION INCORRECTLY SHOW
 THE PEDESTRIAN WALKWAY AT THE SOUTHWEST CORNER OF THE
 SITE. THE PROPOSED TRANSFORMER MAY NOT BE LOCATED AS
 SHOWN. THE PEDESTRIAN WALKWAY IS IN AN EASEMENT AS
 SHOWN ON THE CIVIL PLAN.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.
  
  

Review Stop Z ZONING
Rev No 1 Status F Date 2016-06-10 Cont ID  
Sent By eschneid Date 2016-06-10 Time 10:55 Rev Time 0.75
Received By eschneid Date 2016-06-10 Time 10:55 Sent To  
Notes
2016-06-10 11:33:57FAILED
  
 1) THE PERMIT IS FOR A SITE WALL. THE PLANS INCLUDE
 MUCH MORE THAN JUST SITE WALL DETAILS. PLEASE HIGHLIGHT
 THE LOCATION OF THE WORK SPECIFICALLY COVERED BY THIS
 PERMIT, TO INCLUDE THE DETAILS.
  
 2) WHAT APPEARS TO BE THE SITE WALL ON SHEET G2.1 IS
 DIFFERENT FROM WHAT APPEARS TO BE THE SITE WALL ON
 SHEET S-1.1. ALL PLANS SHALL SHOW SAME CONDITIONS.
  
 3) THE SITE PLAN G1.1 IS ILLEGIBLE WITH ALL THE CROSS
 HATCHING.
  
 4) PROVIDE A SURVEY OR CIVIL PLAN WHICH CLEARLY SHOWS
 THE SETBACK DIMENSION FROM THE FLAGLER DRIVE PROPERTY
 LINE TO THE FACE OF THE SITE WALL ALONG FLAGLER DRIVE.
 IT SHALL BE CLEARLY DEMONSTRATED THAT NO PORTION OF THE
 SITE WALL IS CLOSER THAN 25 FEET TO THE PROPERTY LINE.
 THIS IS DUE TO THE FACT THAT THE WALL AND WALL WITH
 FENCE ON TOP EXCEEDS FOUR (4) FEET IN HEIGHT WHEN
 MEASURED FROM THE EXTERIOR FACE.
  
 5) THE SIGNAGE ON THE WALL REQUIRES A SEPARATE PERMIT
 WITH PLANS.
  
 6) THE PROPOSED WALL APPEARS TO BLOCK THE EXISTING
 PEDESTRIAN ACCESS EASEMENT. PROVIDE A PLAN THAT SHOWS
 HOW THE PEDESTRIAN ACCESS ACROSS THE SITE WILL BE
 MAINTAINED DURING THE CONSTRUCTION OF THE WALL. PLEASE
 NOTE THAT THE PEDESTRIAN ACCESS SHALL NOT BE IMPEDED
 DURING ANY PHASE OF CONSTRUCTION.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.