Plan Review Details - Permit 16040686
Plan Review Stops For Permit 16040686
Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2016-04-14 Cont ID  
Sent By pleduc Date 2016-04-14 Time   Rev Time 0.00
Received By pleduc Date 2016-04-14 Time 14:41 Sent To M
Notes
2016-04-14 15:19:35THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
 ACCEPTANCE TESTING SHALL BE PER NFPA 13, CHAPTER
 24......
  
 24.2.1.1 UNLESS PERMITTED BY 24.2.1.2 THROUGH 24.2.1.8,
 ALL PIPING AND ATTACHED APPURTENANCES SUBJECTED TO
 SYSTEM WORKING PRESSURE SHALL BE HYDROSTATICALLY TESTED
 AT 200 PSI (13.8 BAR) AND SHALL MAINTAIN THAT PRESSURE
 WITHOUT LOSS FOR 2 HOURS.
  
 24.2.1.5 WHERE ADDITION OR MODIFICATION IS MADE TO AN
 EXISTING SYSTEM AFFECTING MORE THAN 20 SPRINKLERS, THE
 NEW PORTION SHALL BE ISOLATED AND TESTED AT NOT LESS
 THAN 200 PSI (13.8 BAR) FOR 2 HOURS.
  
 THE SYSTEM DESIGN INDICATES A SIGNIFICANT AMOUNT OF NEW
 PIPE AND HEAD RELOCATION. ADDITIONALLY, A ONTROL VALVE
 IS LOCATED IN THE STARIWELL THAT CAN BE USED TO
 ISOLATED THE FLOOR FOR 200 PSI TESTING.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-04-18 Cont ID  
Sent By ccole Date 2016-04-18 Time 11:23 Rev Time 0.00
Received By ccole Date 2016-04-13 Time 09:03 Sent To  
Notes
2016-04-14 09:03:34ROUTED TO FIRE

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2016-04-18 Cont ID  
Sent By ccole Date 2016-04-18 Time 11:24 Rev Time 0.00
Received By ccole Date 2016-04-18 Time 11:24 Sent To  
Notes
***NONE***