Plan Review Details - Permit 16040282
Plan Review Stops For Permit 16040282
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2019-03-22 Cont ID  
Sent By shill Date 2019-03-22 Time 15:01 Rev Time 0.00
Received By shill Date 2019-03-22 Time 15:01 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-05-07 Cont ID  
Sent By tmoore Date 2016-05-07 Time 09:32 Rev Time 0.00
Received By tmoore Date 2016-05-07 Time 08:44 Sent To  
Notes
2016-05-07 09:32:09APPLICATION FOR DEMOLITION WILL NEED THESE ITEMS
 COMPLETED PRIOR TO ISSUANCE OF PERMIT #16040282.
  
 1) PLUMBING PERMIT PULLED TO CAP SEWER LATERAL AND
 FINAL PLUMBING #703 SCHEDULED FOR FINAL PLUMBING
 INSPECTION.
  
 2) DEMO MUST BE KEPT WET FOR DUST CONTROL. CONFIRMATION
 REQUESTED FROM UTILITIES THAT THE WATER METER HAS BEEN
 PULLED OR THAT A HYDRANT METER IS BEING REQUESTED.
 CONFIRMATION WILL BE ADDED TO DEMO APPLICATION.
 IF A HOSE BIB IS PREFERRED TO REMAIN, THEN A BACKFLOW
 PREVENTER WILL NEED TO BE INSTALLED AND INSPECTED BY
 UTILITIES.
  
 3) ELECTRICAL DISCONNECT REQUESTED THROUGH F.P.L. WITH
 DROP CUT, AND COPY OF "ALL CLEAR" CONFIRMATION ADDED TO
 DEMO APPLICATION.
  
 4) GAS DISCONNECT REQUESTED THROUGH F.P.U. AND "NO
 SERVICE" CONFIRMATION COPY ADDED TO DEMO APPLICATION.
  
 5) RODENT INSPECTION REQUESTED AND COPY OF TREATMENT OR
 NONE FOUND CONFIRMATION ADDED TO DEMO APPLICATION.
  
 6) DEBRIS DISPOSAL FORM COMPLETED AT FRONT COUNTER AND
 ADDED TO APPLICATION. FEES MAY APPLY.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2016-04-15 Cont ID  
Sent By Mgonzale Date 2016-04-15 Time   Rev Time 1.00
Received By mgonzale Date 2016-04-15 Time   Sent To B
Notes
2016-04-15 16:22:44#1 SWPPP SHALL BE IN ENFORCEMENT AT ALL TIMES. MUNICODE
 94-450.
  
 #2 CALL 811 BEFORE YOU DIG.
  
 #3 WATER SERVICES NOT NEEDED SHALL BE CUT AND CAPPED AT
 MAIN.
  
 #4 CLOSURE OF ANY PUBLIC RIGHT-OF-WAY INCLUDING
 SIDEWALKS WILL REQUIRE A RIGHT-OF-WAY PERMIT.
  
 MANUEL JULIAN GONZALEZ, ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT, 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085, FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2016-04-08 Cont ID  
Sent By fmittner Date 2016-04-08 Time 14:38 Rev Time 0.00
Received By fmittner Date 2016-04-08 Time 14:38 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2019-03-22 Cont ID  
Sent By shill Date 2019-03-22 Time 15:00 Rev Time 0.00
Received By shill Date 2016-04-05 Time 14:08 Sent To  
Notes
2016-05-04 15:32:455/4 TO TMOORE'S DESK
  
  
2016-04-05 14:08:17ROUTED TO HISTORIC VIA ZONING

Review Stop Z ZONING
Rev No 2 Status P Date 2019-03-22 Cont ID  
Sent By ajones Date 2019-03-22 Time 15:42 Rev Time 0.00
Received By ajones Date 2019-03-22 Time 15:42 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2016-04-13 Cont ID  
Sent By dkittred Date 2016-04-13 Time 16:11 Rev Time 0.00
Received By dkittred Date 2016-04-13 Time 15:54 Sent To ENG
Notes
2016-04-13 16:07:08PLANNING AND ZONING COMMENTS: ***FAILED***
  
 4/13/16
  
 1. PLEASE SUBMIT AND OBTAIN A BUILDING PERMIT FOR NEW
 CONSTRUCTION DEMONSTRATING COMPLIANCE WITH ZLDR SEC.
 94-107(B)(2):
  
 "EXISTING BUILDINGS MAY NOT BE DESTROYED OR REMOVED
 UNLESS THEY ARE TO BE REPLACED ACCORDING TO THESE URBAN
 REGULATIONS AND ONLY AFTER A BUILDING PERMIT WHICH
 AFFECTS THE VERTICAL CONSTRUCTION FOR THE NEW BUILDING
 HAS BEEN OBTAINED BY THE PROPERTY OWNER OR DEVELOPER.
 PERMITS WHICH AFFECT VERTICAL CONSTRUCTION INCLUDE THE
 FOUNDATION, VIBRO-FLOTATION, SOIL MIXING, PRESSURE
 GROUTING AND FULL BUILDING PERMITS. CLEARING AND
 GRUBBING AND UNDERGROUND UTILITIES AND SITE WORK
 PERMITS ARE NOT CONSIDERED PERMITS WHICH AFFECT
 VERTICAL CONSTRUCTION. THE FINAL BUILDING PERMIT FOR
 THE NEW BUILDING SHALL BE APPLIED FOR WITHIN 30 DAYS OF
 ISSUANCE OF THE DEMOLITION PERMIT AND SHALL BE
 DILIGENTLY RESPONDED TO BY THE APPLICANT. VERTICAL
 CONSTRUCTION SHALL COMMENCE WITHIN SIX MONTHS OF THE
 ISSUANCE OF THE BUILDING PERMIT. THE APPLICATION AND/OR
 BUILDING PERMIT WILL EXPIRE IN THE EVENT OF SIX MONTHS
 OF INACTIVITY OR FAILURE TO PROGRESS WITH THE
 APPLICATION OR CONSTRUCTION, OR AS OTHERWISE PROVIDED
 IN THE LOCAL AMENDMENTS TO THE FLORIDA BUILDING CODE
 ADOPTED BY THE CITY. IN THE EVENT THAT VERTICAL
 CONSTRUCTION HAS NOT COMMENCED WITHIN SIX MONTHS, THE
 SITE SHALL BE RESTORED TO GRADE, TILLED, SODDED, AND
 IRRIGATED. ANY TEMPORARY CONSTRUCTION FENCE SHALL ALSO
 BE REMOVED."
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT:
  
 DANIELLE J. KITTREDGE, AICP
 SENIOR PLANNER
 PLANNING & ZONING DIVISION
 PHONE: (561)-822-1443
 EMAIL: [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved