Plan Review Details - Permit 16040227
Plan Review Stops For Permit 16040227 |
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
P |
Date |
2016-04-07 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-04-07 |
Time |
13:13 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-04-07 |
Time |
13:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2016-04-07 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-04-07 |
Time |
04:56 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-04-07 |
Time |
04:56 |
Sent To |
|
|
Notes |
2016-04-07 04:57:44 | GAS PLAN REVIEW | | A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL | | PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT | | THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE | | REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK. | | PROVIDE COMPLETE PLANS, APPLIANCE/ EQUIPMENT | | SPECIFICATIONS AND GAS RISER THAT REFLECT THE ENTIRE | | SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC SEC. | | 107.2.1. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2016-04-07 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-04-07 |
Time |
13:13 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-04-07 |
Time |
13:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2016-04-07 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-04-07 |
Time |
04:57 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-04-05 |
Time |
13:41 |
Sent To |
|
|
Notes |
2016-04-05 13:42:04 | ROUTED TO PLUMBING |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2016-04-07 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-04-07 |
Time |
13:13 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-04-07 |
Time |
13:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2016-04-07 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-04-07 |
Time |
04:55 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-04-07 |
Time |
04:25 |
Sent To |
|
|
Notes |
2016-04-07 04:54:41 | 1) IS THIS AN EXACT REPLACEMENT OF AN EXISTING BOILER | | OR IS THIS BEING ADDED? THE APPLICATION STATES "SUPPLY | | AND INSTALL "NEW" GAS BOILER. CLARIFY. IF IT IS AN | | EXACT REPLACEMENT, NOTE SUCH ON THE APPLICATION. | | 2) WILL THE BOILER BE CONNECTED TO AN EXISTING VENT OR | | WILL A NEW VENT BE INSTALLED? IF A NEW VENT IS TO BE | | INSTALLED, SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, | | SIZE AND TERMINATION OF THE GAS VENTS PER 2014 FBC-FUEL | | GAS SECS. 502 THRU 505. | | 3) WILL ANY GAS PIPING OR WATER/BOILER PIPING HAVE TO | | BE ALTERED OR CHANGED? IF SO, SUBMIT A PIPING RISER FOR | | THE CHANGES THAT WILL BE MADE TO THE GAS AND WATER | | SYSTEMS. | | 4) SUBMIT TWO COPIES OF DOCUMENTATION THAT THE BOILER | | IS LISTED IN ACCORDANCE WITH THE STANDARDS ANSI Z21.13 | | OR UL 795 PER THE 2014 FGC SEC.631.1 AND IF APPLICABLE, | | THE ADDITIONAL STANDARDS LISTED IN THE FGC SEC. 631.1. | | 5) SUBMIT TWO COPIES OF THE MANUFACTURER'S INSTALLATION | | INSTRUCTIONS. 2014 FBC 107.1, 2014 FGC SEC.631.2. | | 6) CLEARANCE TO CCOMBUSTIBLE MATERIALS SHALL COMPLY | | WITH FGC SEC.631.3 & 308.4 OF 2015 FGC. | | 7) CLEARANCES FROM THE TOPS OF BOILERS TO THE CEILING | | OR OTHER OVERHEAD OBSTRUCTION SHALL BE IN ACCORDANCE | | WITH 2014 FBC-MECHANICAL SEC.1004.3.1 & TABLE 1004.3.1. | | 8) SUBMIT A FLOOR PLAN THAT REFLECTS THE ABOVE | | CONDITIONS. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | |
|
|
|