Plan Review Details - Permit 16030893
Plan Review Stops For Permit 16030893
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2016-04-15 Cont ID  
Sent By tmoore Date 2016-04-15 Time 08:32 Rev Time 0.00
Received By tmoore Date 2016-04-15 Time 08:28 Sent To  
Notes
2016-04-15 08:32:41AGREE WITH CONTRACTOR THAT BACKFLOW WILL BE FINALED
 AFTER DEMOLITION. OK TO ISSUE.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-04-14 Cont ID  
Sent By tmoore Date 2016-04-14 Time 17:04 Rev Time 0.00
Received By tmoore Date 2016-04-14 Time 17:01 Sent To  
Notes
2016-04-14 17:04:32E-MAILED CONTRACTOR AND LEFT MESSAGE AS WELL. ONLY NEED
 A PASS #703 ON BACKFLOW PERMIT #16020059. HAVE ALL
 OTHER REVIEWS AND UTILITY RELEASES. WILL HOLD AT DESK.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2016-04-11 Cont ID  
Sent By Mgonzale Date 2016-04-11 Time   Rev Time 1.00
Received By mgonzale Date 2016-04-11 Time   Sent To B
Notes
2016-04-11 19:11:52#1 CALL 811 BEFORE DIG - CITY'S ASBESTOS CEMENT 3IN
 DIAMETER WATER LINE RUNS IN YOUR PROPERTY.
  
 #2 LOCATE AND PROTECT WATER LINE SO THAT NO EQUIPMENT
 RUNS NEAR OR DEMOLITION DOES NOT HARM.
  
 #3 SILT FENCE AND POLLUTION PREVENTION ELEMENTS MUST BE
 IN PLACE AT ALL TIMES. NO DEBRIS SHALL LEAVE THE SITE.
  
 #4 SOIL MUST BE STABILIZED WITH GRASS OF MULCH. COMPLY
 WITH MUNICIPAL CODE SECTION 94-450.
  
 #5 IMPORTANT MESSAGE: AS OF DECEMBER 20, 2015 THE CITY
 OF WEST PALM BEACH CROSS-CONNECTION CONTROL MANUAL HAS
 BEEN REVISED,
 MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD
 FREE." FOR MORE INFORMATION REFER TO THE LINK BELOW:
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
 A PLUMBING PERMIT IS REQUIRED UPON REPLACEMENT OF
 BACKFLOW.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2016-03-29 Cont ID  
Sent By ajones Date 2016-03-29 Time 11:28 Rev Time 0.00
Received By ajones Date 2016-03-29 Time 11:28 Sent To ENG
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-04-15 Cont ID  
Sent By tmoore Date 2016-04-15 Time 08:33 Rev Time 0.00
Received By tmoore Date 2016-03-21 Time 09:08 Sent To  
Notes
2016-03-22 09:09:11ROUTED TO HISTORIC VIA ZONING INBOX

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2016-04-15 Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved