Plan Review Stops For Permit 16030242 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2016-04-20 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2016-04-20 |
Time |
15:31 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2016-04-20 |
Time |
15:31 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2016-03-31 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2016-03-31 |
Time |
16:44 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2016-03-31 |
Time |
16:44 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2016-03-07 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2016-03-07 |
Time |
17:13 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2016-03-07 |
Time |
16:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2016-03-22 |
|
|
Cont ID |
|
Sent By |
vperez |
Date |
2016-03-22 |
Time |
06:14 |
Rev Time |
0.00 |
Received By |
vperez |
Date |
2016-03-22 |
Time |
06:07 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2016-03-07 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2016-03-07 |
Time |
17:13 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2016-03-07 |
Time |
16:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
P |
Date |
2016-03-08 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2016-03-08 |
Time |
13:42 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2016-03-08 |
Time |
13:42 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2016-04-20 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2016-04-20 |
Time |
15:37 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2016-04-13 |
Time |
15:26 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2016-04-11 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2016-04-11 |
Time |
09:52 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2016-03-18 |
Time |
13:53 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2016-03-09 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2016-03-09 |
Time |
07:56 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2016-03-07 |
Time |
11:06 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2016-04-19 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2016-04-19 |
Time |
13:04 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2016-04-19 |
Time |
13:04 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2016-04-05 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2016-04-05 |
Time |
15:11 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2016-04-05 |
Time |
15:11 |
Sent To |
|
|
Notes |
2016-04-05 15:13:27 | PLUMBING COMMENTS: 2ND REVIEW | | | | 1. SHT. DEMO 1 MASTER BATHROOM NOTE INDICATES PLUMBING | | FIXTURE TO BE REMOVED AND NEW ONES INSTALLED IN SAME | | LOCATION SHT.A100 MASTER BATHROOM HAS THE TOILET AND | | LAVATORY REVERSED FROM WHAT IT SHOWS ON THE DEMO, SHT. | | PLUMBING RISER 1 MASTER BATHROOM SHOWS LAVATORY NEXT TO | | TUB PLEASE CLARIFY. | | PER WPB AMEND.TO FBC 107.2.1 | | 2. SHT. DEMO 1 NOTE SHOWS REMOVING EXISTING OUTDOOR | | SHOWER SHAT. A100 SHOWS SHOWER STILL IN EXISTING | | LOCATION PLEASE CLARIFY. | | PER WPB AMEND.TO FBC 107.2.1 | | 3.PLUMBING RISER 1 DOES NOT SHOW WASHING MACHINE PLEASE | | SHOW ALL PLUMBING FIXTURES OM RISER DIAGRAM. | | PER WPB AMEND.TO FBC 107.2.1 | | 4.SHT.DEMO 2 NOTES BATHROOM REMOVE FIXTURES AN REPLACE | | IN KIND SHT. A101 SHOWS BOTH BE ELIMINATED PLEASE | | CLARIFY. | | PER WPB AMEND.TO FBC 107.2.1 | | 5. SHT. PLUMBING RISER 2 SHOWS BATHROOM ON FIRST FLOOR | | SHT. A101 SHOWS BOTH BEING ELIMINATED PLEASE CLARIFY. | | PER WPB AMEND.TO FBC 107.2.1 | | 6. SHT. DEMO 2 SHOWS 2 KITCHEN SINKS SHT. A101 SHOWS | | ONLY 1 PLEASE CLARIFY. | | PER WPB AMEND.TO FBC 107.2.1 | | | | | | | | | | GEORGE JOHNSON | | PLUMBING PLANS EXAMINER | | CITY OF WEST PALM BEACH | | 561-805-6711 | | [email protected] | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2016-03-09 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-03-09 |
Time |
04:12 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-03-09 |
Time |
03:25 |
Sent To |
|
|
Notes |
2016-03-09 04:03:33 | 1) THE PLANS ARE CONFUSING AS TO THE SCOPE OF | | WORK.SHT.A100.0 FLOOR PLAN IS DIFFERENT FROM | | A101.0.BOTH FLOOR PLANS ARE LISTED AS "REVISED".WHICH | | LAYOUT IS BEING BUILT? SUBMIT ONE FLOOR PLAN THAT | | CLEARLY REFLECTS THE SCOPE OF WORK TO BE DONE. FBC | | 107.2.1. | | 2) A MINIMUM OF 21 INCHES CLEARANCE IS REQUIRED IN | | FRONT OF WATER CLOSETS.THE LAVATORY IN THE FIRST FLOOR | | BATH CLEARLY ENCROACHES INTO THIS CLEAR FLOOR | | SPACE.FBCR P2705.1 (5). | | 3) WATER SUPPLY VALVES FOR THE WASHER/DRYER UNIT MUST | | BE ACCESSIBLE. THEY CANNOT BE LOCATED BEHIND THE | | WASHER/DRYER UNLESS THERE IS AN ACCESS PANEL IN THE | | WASHER/DRYER UNIT THAT CAN BE REMOVED FOR ACCESS TO THE | | VALVES. FBCR SEC.P2903.9.3. | | 4)SHOW THE INSIDE CLEAR DIMENSIONS OF THE SHOWER. THE | | SHOWER SIZE SHALL COMPLY WITH FBCR SEC.P2708.1. | | 5) SHT. A204 SHOWS A BATHTUB IN THE BATHROOM BUT THERE | | ARE TWO DIFFERENT FLOOR PLANS. ONE SHOWS A TUB AND THE | | OTHER A SHOWER. WHICH IS IT? FBCR107.2.1. | | 6) SHT. D100.0 NOTES THE REMOVAL OF PLUMBING FIXTURES | | AND "REPLACE ALL IN KIND" BUT FIXTURES ARE BEING | | RELOCATED AND CHANGED.CLARIFY. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2016-04-20 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2016-04-20 |
Time |
15:37 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2016-04-20 |
Time |
15:37 |
Sent To |
|
|
Notes |
|
|