Plan Review Details - Permit 16030207
Plan Review Stops For Permit 16030207
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2016-03-10 Cont ID  
Sent By jwitmer Date 2016-03-10 Time 07:59 Rev Time 0.00
Received By jwitmer Date 2016-03-10 Time 07:45 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2016-03-07 Cont ID  
Sent By rlecky Date 2016-03-07 Time 13:56 Rev Time 0.00
Received By rlecky Date 2016-03-07 Time 13:21 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2016-03-09 Cont ID  
Sent By pleduc Date 2016-03-09 Time   Rev Time 0.00
Received By pleduc Date 2016-03-09 Time 12:04 Sent To  
Notes
2016-03-09 12:08:12THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
 1. THERE IS AN INCORRECT REFERENCE TO THE FIRE CODE:
  
 THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE
 5TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING
 THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER
 APPLICABLE CODES OR STANDARDS.
  
 THIS DOES NOT APPEAR TO NEGATIVELY AFFECT YOUR
 SUBMITTAL; HOWEVER, YOU ARE ENCORAGED TO HAVE YOUR
 DESIGNERS/CONTRACTORS REVIEW TO ENSURE COMPLIANCE WITH
 THE CORRECT CODE.
  
 PLEASE UPADATE YOU RECORDS FOR FUTURE SUBMITTALS.
  
 CONTINUED USE OF THE INCORRECT CODE WILL RESULTED IN A
 FAILED REVIEW.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-03-17 Cont ID  
Sent By lmarchan Date 2016-03-17 Time 10:04 Rev Time 0.00
Received By lmarchan Date 2016-03-15 Time 08:15 Sent To  
Notes
2016-03-16 08:17:02RESUB ROUTED TO JVALIDO

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-03-14 Cont ID  
Sent By tklarge Date 2016-03-14 Time 06:23 Rev Time 0.00
Received By tklarge Date 2016-03-04 Time 12:42 Sent To  
Notes
2016-03-04 12:42:34B29

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2016-03-16 Cont ID  
Sent By jvalido Date 2016-03-16 Time 17:27 Rev Time 0.00
Received By jvalido Date 2016-03-16 Time 17:17 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2016-03-10 Cont ID  
Sent By jvalido Date 2016-03-10 Time 15:51 Rev Time 0.00
Received By jvalido Date 2016-03-10 Time 15:33 Sent To  
Notes
2016-03-10 15:51:15107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS - PROVIDE
 SCHEDULE FOR INDIVIDUAL NEW BRANCH DUCT SIZES.

Review Stop P PLUMBING
Rev No 1 Status P Date 2016-03-14 Cont ID  
Sent By tklarge Date 2016-03-14 Time 06:22 Rev Time 0.00
Received By tklarge Date 2016-03-14 Time 06:08 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved