Plan Review Details - Permit 16030156
Plan Review Stops For Permit 16030156
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2016-03-24 Cont ID  
Sent By cthroop Date 2016-03-24 Time 15:01 Rev Time 0.00
Received By cthroop Date 2016-03-24 Time 11:23 Sent To  
Notes
2016-03-24 17:42:11 
  
  
  
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2016-03-07 Cont ID  
Sent By vperez Date 2016-03-07 Time 13:02 Rev Time 0.00
Received By vperez Date 2016-03-07 Time 13:02 Sent To  
Notes
2016-03-07 13:02:32APP PROVISO

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2016-03-07 Cont ID  
Sent By tklarge Date 2016-03-07 Time 06:01 Rev Time 0.00
Received By tklarge Date 2016-03-07 Time 06:01 Sent To  
Notes
2016-03-07 06:14:41GAS PLAN REVIEW
 A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL
 PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT
 THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE
 REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK.
 PROVIDE COMPLETE PLANS, APPLIANCE/ EQUIPMENT
 SPECIFICATIONS AND GAS RISER THAT REFLECT THE ENTIRE
 SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC SEC.
 107.2.1.
  
 GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE
 FBC-R, SEC. G2404.3.
  
 A SEPARATE PERMIT IS REQUIRED FOR THE GAS INSTALLATION.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2016-04-08 Cont ID  
Sent By fmittner Date 2016-04-08 Time 14:44 Rev Time 0.00
Received By fmittner Date 2016-04-08 Time 14:44 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2016-04-18 Cont ID  
Sent By lmarchan Date 2016-04-18 Time 12:35 Rev Time 0.00
Received By lmarchan Date 2016-04-15 Time 16:25 Sent To  
Notes
2016-04-15 16:25:33RESUB ROUTED TO JVALIDO

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-04-12 Cont ID  
Sent By lmarchan Date 2016-04-12 Time 08:55 Rev Time 0.00
Received By lmarchan Date 2016-04-11 Time 13:11 Sent To  
Notes
2016-04-11 13:11:37JVALIDO'S DESK+

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-04-08 Cont ID  
Sent By cpuell Date 2016-04-08 Time 16:05 Rev Time 0.00
Received By cpuell Date 2016-03-07 Time 13:02 Sent To  
Notes
2016-03-07 13:05:133/7 TO R32 BIN
2016-03-03 14:23:03R32

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2016-04-18 Cont ID  
Sent By jvalido Date 2016-04-18 Time 11:00 Rev Time 0.00
Received By jvalido Date 2016-04-18 Time 10:27 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2016-04-11 Cont ID  
Sent By jvalido Date 2016-04-11 Time 17:59 Rev Time 0.00
Received By jvalido Date 2016-04-11 Time 16:57 Sent To  
Notes
2016-04-11 17:47:31FLORIDA BUILDING CODE RESIDENTIAL (5TH EDITION) 2014
  
 M1503.4 MAKEUP AIR REQUIRED.
 EXHAUST HOOD SYSTEMS CAPABLE OF EXHAUSTING IN EXCESS OF
 400 CUBIC FEET PER MINUTE (0.19 M3/S) SHALL BE PROVIDED
 WITH MAKEUP AIR AT A RATE APPROXIMATELY EQUAL TO THE
 EXHAUST AIR RATE. SUCH MAKEUP AIR SYSTEMS SHALL BE
 EQUIPPED WITH A MEANS OF CLOSURE AND SHALL BE
 AUTOMATICALLY CONTROLLED TO START AND OPERATE
 SIMULTANEOUSLY WITH THE EXHAUST SYSTEM.
  
 107.2.1 - PROVIDE INSTALLATION INSTRUCTIONS FOR
 CONDENSER TIE DOWNS. AS PER FBC 2014 WINDLOAD
 REQUIREMENTS (170 MPH).
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2016-03-24 Cont ID  
Sent By jvalido Date 2016-03-24 Time 17:46 Rev Time 0.00
Received By jvalido Date 2016-03-24 Time 15:37 Sent To  
Notes
2016-03-24 17:45:50FLORIDA ENERGY CODE - SECTION R101.4.3 - SECTION R202
 RENOVATED BUILDINGS - A RESIDENTIAL OR NONRESIDENTIAL
 BUILDING UNDERGOING ALTERATION THAT VARIES INSULATION,
 HVAC SYSTEMS, WATER HEATING SYSTEMS, OR EXTERIOR
 ENVELOPE CONDITIONS, PROVIDED THE ESTIMATED COST OF
 RENOVATION EXCEEDS 30 PERCENT OF THE ASSESSED VALUE OF
 THE STRUCTURE.
  
 PROVIDE ENERGY CALCULATIONS.
  
 107.2.1 - PROVIDE DUCT SIZES AND CFM QUANTITIES FOR ALL
 BATHROOM EXHAUST, DRYER EXHAUST AND KITCHEN EXHAUST.
 PROVIDE CONDENSER TIE DOWN SCHEDULE. PROVIDE KITCHEN
 EXHAUST EQUIPMENT SPECIFICATIONS.
  
 R403.6.1 - HEATING AND COOLING EQUIPMENT SHALL BE SIZED
 IN ACCORDANCE WITH ACCA MANUAL S BASED ON THE EQUIPMENT
 LOADS CALCULATED IN ACCORDANCE WITH ACCA MANUAL J OR
 OTHER APPROVED HEATING AND COOLING CALCULATION
 METHODOLOGIES, BASED ON BUILDING LOADS FOR THE
 DIRECTIONAL ORIENTATION OF THE BUILDING. THE
 MANUFACTURER AND MODEL NUMBER OF THE OUTDOOR AND INDOOR
 UNITS (IF SPLIT SYSTEM) SHALL BE SUBMITTED ALONG WITH
 THE SENSIBLE AND TOTAL COOLING CAPACITIES AT THE DESIGN
 CONDITIONS DESCRIBED IN SECTION R302.1. THIS CODE DOES
 NOT ALLOW DESIGNER SAFETY FACTORS, PROVISIONS FOR
 FUTURE EXPANSION OR OTHER FACTORS WHICH AFFECT
 EQUIPMENT SIZING. SYSTEM SIZING CALCULATIONS SHALL NOT
 INCLUDE LOADS CREATED BY LOCAL INTERMITTENT MECHANICAL
 VENTILATION SUCH AS STANDARD KITCHEN AND BATHROOM
 EXHAUST SYSTEMS.
  
 R403.6.1.1 COOLING EQUIPMENT CAPACITY. COOLING ONLY
 EQUIPMENT SHALL BE SELECTED SO THAT ITS TOTAL CAPACITY
 IS NOT LESS THAN THE CALCULATED TOTAL LOAD, BUT NOT
 MORE THAN 1.15 TIMES GREATER THAN THE TOTAL LOAD
 CALCULATED ACCORDING TO THE PROCEDURE SELECTED IN
 SECTION 403.6, OR THE CLOSEST AVAILABLE SIZE PROVIDED
 BY THE MANUFACTURER?S PRODUCT LINES. THE CORRESPONDING
 LATENT CAPACITY OF THE EQUIPMENT SHALL NOT BE LESS THAN
 THE CALCULATED LATENT LOAD.
  
 AS PER THE SUBMITTED MECHANICAL PLANS, THE COOLING BTU
 EXCEED THE RESIDENTIAL HVAC LOAD CALCULATIONS BY MORE
 THAN 1.15 TIMES. CONFIRM AND MAKE CORRECTIONS.
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2016-03-07 Cont ID  
Sent By tklarge Date 2016-03-07 Time 06:00 Rev Time 0.00
Received By tklarge Date 2016-03-07 Time 05:46 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2016-03-24 Cont ID  
Sent By cthroop Date 2016-03-24 Time 15:00 Rev Time 0.00
Received By cthroop Date 2016-03-24 Time 14:51 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2016-04-08 Cont ID  
Sent By fmittner Date 2016-04-08 Time 14:44 Rev Time 0.00
Received By fmittner Date 2016-04-08 Time 14:44 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved