|
 |
 |
 |
 |
 |
Plan Review Details - Permit 16020922
Plan Review Stops For Permit 16020922 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2016-03-09 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2016-03-09 |
Time |
13:08 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2016-03-09 |
Time |
13:08 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2016-03-08 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2016-03-08 |
Time |
14:53 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2016-03-08 |
Time |
14:53 |
Sent To |
|
|
Notes |
2016-03-08 14:55:39 | ENGINEER ONLY SIGNED PAGE 1 OF THE 3 PAGES. NOTHING ON | | PAGE 1 REFERED TO THE OTHER 2 PAGES. FS471 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2016-03-08 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2016-03-08 |
Time |
07:51 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2016-03-08 |
Time |
07:18 |
Sent To |
|
|
Notes |
2016-03-08 09:00:20 | PLAN | | REVIEW COMMENTS | | | | 2ND REVIEW: FBC FIFTH EDITION (2014) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE RAS CALCULATIONS THAT ARE SUBMITTED FOR PUBLIC | | RECORD ARE REQUIRED TO HAVE THE ENGINEER'S HANDWRITTEN | | SIGNATURE IN ADDITION TO HIS SEAL. COPIES OR OTHER | | FACSIMILES ARE NOT ACCEPTABLE. FS 471 AND FAC | | 61G15-23.002 | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2016-02-25 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2016-02-25 |
Time |
11:06 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2016-02-25 |
Time |
11:06 |
Sent To |
|
|
Notes |
2016-02-25 11:30:17 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC FIFTH EDITION (2014) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THERE ARE TWO BUILDINGS ON THIS PROPERTY. INDICATE | | WHICH ONE OF THE BUILDINGS IS TO BE RE-ROOFED. | | FBC107.2.1 | | | | 2) PROVIDE TWO COPIES OF A ROOF DIAGRAM WITH | | DIMENSIONS, LOCATIONS OF SCUPPERS, ROOF SLOPE, PARAPET | | HEIGHTS ON ALL SIDES AND ANY OTHER RELAVENT | | INFORMATION. FBC 107.2.1 | | | | 3) THE FASTENER SPACING ON SECTION C OF THE FORM THAT | | YOU SUBMITTED DOES NOT MATCH THE SPACING SPECIFIED ON | | PAGE 23 OF THE NOA. THE MAXIMUM DESIGN PRESSURE ON PAGE | | 23 IS NEGATIVE 52.5 PSF. SPECIFY THE REQUIRED DESIGN | | PRESSURES FOR THE THREE ROOF ZONES ON THE ROOF DRAWING. | | IF THE REQUIRED PRESSURES ARE MORE THAN -52.5 PSF, THEN | | SUBMIT SIGNED AND SEALED RAS 117 CALCULATIONS FOR THE | | ENHANCED FASTENING AS REQUIRED BY LIMITATION #7 ON PAGE | | 42 OF THE NOA NO.14-0529.02. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2016-03-08 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2016-03-08 |
Time |
07:51 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2016-03-04 |
Time |
10:25 |
Sent To |
|
|
Notes |
2016-03-07 10:26:06 | RMCDOUGAL'S DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2016-02-25 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2016-02-25 |
Time |
11:30 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
2016-02-24 |
Time |
15:11 |
Sent To |
|
|
Notes |
2016-02-24 15:11:58 | RMCDOUGAL |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |