Plan Review Details - Permit 16020874
Plan Review Stops For Permit 16020874
Review Stop G GAS REVIEW
Rev No 4 Status P Date 2016-03-08 Cont ID  
Sent By tklarge Date 2016-03-08 Time 03:22 Rev Time 0.00
Received By tklarge Date 2016-03-08 Time 03:17 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status F Date 2016-03-05 Cont ID  
Sent By tklarge Date 2016-03-05 Time 03:42 Rev Time 0.00
Received By tklarge Date 2016-03-05 Time 03:37 Sent To  
Notes
2016-03-05 03:50:031) THE PLAN THAT WAS SUBMITTED NOTES A DELIVERY
 PRESSURE OF 5 PSI. THERE IS NO GAS TABLE IN THE 2014
 FUEL GAS CODE FOR A 5 PSI TABLE FOR PE PIPE. SUBMIT 2
 COPIES OF THE APPLICABLE SIZING TABLE USED FOR THE
 DESIGN OF THIS SYSTEM. FBC 107.2.1 FGC SEC.402.3. I
 CANNOT CHECK THE SIZING OF THE SYSTEM WITHOUT THE
 SIZING TABLE.
 2) THE MANUF. SPECIFICATIONS FOR THE TANKLESS WATER
 HEATER MODEL IDENTIFIED GIVES A RANGE OF 15,000 BTU'S
 UP TO 180,000 BTU'S. IINDICATE THE SPECIFIC BTU LOAD ON
 THE PLANS FOR THE TANKLESS WATER HEATER AND ALSO THE
 RANGE ( MANUF. SPECS SHOW A BTU LOAD UP TO 20,000.) 3RD
 REQUEST.
 3) SUBMIT TWO COPIES OF THE REVISED GAS DRAWING. ONLY
 ONE COPY HAS BEEN SUBMITTED. FBC 107.2.1.
  
 NOTE: SINCE THE PLANS HAVE BEEN REJECTED THREE TIMES
 FOR THE SAME ITEMS, A RESUBMITTAL FEE OF 4 TIMES THE
 PLAN REVIEW FEE IS REQUIRED TO BE PAID PER FL. STATUTE
 553.80.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2016-03-03 Cont ID  
Sent By tklarge Date 2016-03-03 Time 05:42 Rev Time 0.00
Received By tklarge Date 2016-03-03 Time 05:36 Sent To  
Notes
2016-03-03 05:39:221) ALL THE PREVIOUS GAS COMMENTS HAVE NOT BEEN
 ADDRESSED.
  
 2).SHOW THE BTU LOAD OF EACH APPLIANCE / EQUIPMENT AND
 THE TOTAL BTU LOAD ON THE SYSTEM. REFER TO THE 2014
 FBC-FUEL GAS SECS.401.8 THRU 402.6.1 AND TABLES 402.4
 (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2413. 2ND
 REQUEST.
  
 3).INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM
 ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES.
 SEC. G2413.2. . 2ND REQUEST.
  
 4).SUBMIT MANUFACTURER'S SPECIFICATION SHEETSL FOR ALL
 GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA
 54, NFPA 58, AND FBC-2014 FUEL GAS CODE SEC. 402.2, AND
 301.3 OR 2014 FBC-RES. SEC. G2404.3. GAS APPLIANCES
 SHALL BE LISTED AND LABELED.SUBMIT TWO COPIES OF ALL
 DOCUMENTS.
  
 5) EACH APPLIANCE SHALL BE PROVIDED WITH A SHUTOFF
 VALVE IN ACCCORDANCE WITH THE 2014 FUEL GAS CODE
 SECS.409.5, 2ND REQUEST.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2016-02-24 Cont ID  
Sent By tklarge Date 2016-02-24 Time 06:23 Rev Time 0.00
Received By tklarge Date 2016-02-24 Time 06:04 Sent To  
Notes
2016-02-24 06:22:59 
 1.SHOW THE BTU LOAD OF EACH APPLIANCE / EQUIPMENT AND
 THE TOTAL BTU LOAD ON THE SYSTEM. REFER TO THE 2014
 FBC-FUEL GAS SECS.401.8 THRU 402.6.1 AND TABLES 402.4
 (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2413.
  
 2.INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM ON
 THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES.
 SEC. G2413.2. .
  
 3.SUBMIT MANUFACTURER'S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND
 FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014
 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED
 AND LABELED.
  
 4) EACH APPLIANCE SHALL BE PROVIDED WITH A SHUTOFF
 VALVE IN ACCCORDANCE WITH THE 2014 FUEL GAS CODE
 SECS.409.5,
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2016-03-08 Cont ID  
Sent By tklarge Date 2016-03-08 Time 03:23 Rev Time 0.00
Received By tklarge Date 2016-03-08 Time 03:23 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2016-03-05 Cont ID  
Sent By tklarge Date 2016-03-05 Time 03:54 Rev Time 0.00
Received By tklarge Date 2016-03-04 Time 10:38 Sent To  
Notes
2016-03-04 10:38:22TLARGE'S DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-03-03 Cont ID  
Sent By tklarge Date 2016-03-03 Time 05:42 Rev Time 0.00
Received By tklarge Date 2016-03-01 Time 10:01 Sent To  
Notes
2016-03-02 10:01:29RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-02-24 Cont ID  
Sent By tklarge Date 2016-02-24 Time 09:48 Rev Time 0.00
Received By tklarge Date 2016-02-23 Time 12:43 Sent To  
Notes
2016-02-23 12:43:55PLUMB -$5000