Plan Review Details - Permit 16020846
Plan Review Stops For Permit 16020846
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2016-03-01 Cont ID  
Sent By vperez Date 2016-03-01 Time 14:08 Rev Time 0.00
Received By vperez Date 2016-03-01 Time 14:08 Sent To M
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2016-02-29 Cont ID  
Sent By vperez Date 2016-02-29 Time 07:38 Rev Time 0.00
Received By vperez Date 2016-02-29 Time 07:37 Sent To E
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-03-07 Cont ID  
Sent By ccole Date 2016-03-07 Time 12:39 Rev Time 0.00
Received By ccole Date 2016-03-01 Time 09:49 Sent To  
Notes
2016-03-01 14:09:06TO CAROLINE
2016-03-01 09:49:16RESUB ROUTED TO VPEREZ

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-02-25 Cont ID  
Sent By ccole Date 2016-02-25 Time 07:03 Rev Time 0.00
Received By vperez Date 2016-02-29 Time 07:38 Sent To  
Notes
2016-02-29 07:39:10TO CAROLINE 2/29
2016-02-23 12:57:16MECH <5K

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2016-03-07 Cont ID  
Sent By ccole Date 2016-03-07 Time 12:38 Rev Time 0.00
Received By ccole Date 2016-03-07 Time 12:38 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2016-02-25 Cont ID  
Sent By ccole Date 2016-02-25 Time 07:03 Rev Time 0.00
Received By ccole Date 2016-02-25 Time 07:03 Sent To  
Notes
2016-02-25 07:22:341ST REVIEW: FBC 2014 MECHANICAL
 PERMIT #16020846
 2/25/16
  
 1) THE SUBMITTED ENERGY CONSERVATION FORM R402-2014 IS
 NOT FILLED OUT COMPLETELY. PLEASE REVIEW THE "SCOPE"
 SHOWN AT THE TOP OF THE FORM: "TO COMPLY, A BUILDING
 MUST MEET OR EXCEED ALL OF THE ENERGY EFFICIENCY
 REQUIREMENTS ON TABLE R402A AND ALL APPLICABLE
 MANDATORY REQUIREMENTS SUMMARIZED IN TABLE R402B OF
 THIS FORM". PLEASE ALSO SEE SECTION R101.4.5: CHANGE IN
 SPACE CONDITIONING. ANY NONCONDITIONED SPACE THAT IS
 ALTERED TO BECOME CONDITIONED SPACE SHALL BE REQUIRED
 TO BE BROUGHT INTO FULL COMPLIANCE WITH THIS CODE.
 PLEASE COMPLETE THE FORM AND RE-SUBMIT.
 2) THE HVAC LOAD CALCULATIONS FORM MUST BE SIGNED BY
 THE PERSON WHO PERFORMED THE CALCULATIONS.
 3) PLEASE INCLUDE THE R-VALUE OF THE FLEX DUCTS ON THE
 PLAN.
 4) THE PLAN DOES NOT CLEARLY SHOW HOW THE RETURN AIR
 SYSTEM IS FUNCTIONING. IS THE AIR HANDLER INSTALLED
 VERTICALLY IN A CLOSET BEHIND A LOUVERED DOOR, OR IS IT
 IN THE ATTIC SPACE WITH A RETURN GRILL IN THE CEILING?
 PLEASE NOTE THAT AIR HANDLERS SHALL NOT BE INSTALLED IN
 THE ATTIC WHEN A HOME IS BROUGHT INTO COMPLIANCE USING
 R402- SEE SECTION R403.2.4 FBC-14 ENERGY CONSERVATION.
 5) PROVIDE A CONDENSATE DISPOSAL PLAN.
 6) THE PLAN HAS BEEN FORWARDED TO ELECTRICAL FOR
 REVIEW.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved