2016-02-18 15:14:37 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| MARSHAL, WITH THE FOLLOWING COMMENTS: |
| |
| 1. THE VALUE IS INDICATED AS $250,000. |
| |
| THE VALUE APPEARS TOO LOW FOR THIS PROJECT. THE VALUE |
| FOR THE LIFE SAFETY PORTIONS MAY BE THIS AMOUNT THE THE |
| VALUE FOR THE OVERALL PROJECT SHALL BE SUBMITTED. THE |
| NEW VALUE SHOULD HAVE THE LIFE SAFETY PORTIONS REMOVED, |
| I.E, UNDERGROUND FIRE LINES, FIRE SPRINKLER, FIRE |
| ALARMS, ETC., AS THEY WOULD FALL UNDER SEPARATE |
| PERMITS, |
| |
| 2. FOR ALL SUBMITTED PERMIT SETS: THE SUBMITTALS ARE |
| COPIES OF ORIGINALS. |
| |
| ORIGIANAL PLAN SETS AND ENGINEERS STAMPS SHALL BE |
| ORIGINAL DOCUMENTS. |
| |
| 61G15-30.003 MINIMUM REQUIREMENTS FOR ENGINEERING |
| DOCUMENTS. |
| (1) ENGINEERING DOCUMENTS ARE PREPARED IN THE COURSE OF |
| PERFORMING ENGINEERING SERVICES. WHEN PREPARED FOR |
| INCLUSION WITH AN APPLICATION FOR A GENERAL BUILDING |
| PERMIT, THE DOCUMENTS SHALL MEET ALL ENGINEER?S |
| RESPONSIBILITY RULES, SET FORTH IN CHAPTERS 61G15-31, |
| 61G15-32, 61G15-33, AND 61G15-34, F.A.C., AND BE OF |
| SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE AND |
| EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT IT |
| WILL CONFORM TO THE PROVISIONS OF THE FLORIDA BUILDING |
| CODE, ADOPTED IN SECTION 553.73, F.S., AND APPLICABLE |
| LAWS, ORDINANCES, RULES AND REGULATIONS, AS DETERMINED |
| BY THE AHJ. THE DOCUMENTS SHALL INCLUDE: |
| (A) INFORMATION THAT PROVIDES MATERIAL SPECIFICATIONS |
| REQUIRED FOR THE SAFE OPERATION OF THE SYSTEM THAT IS A |
| RESULT OF ENGINEERING CALCULATIONS, KNOWLEDGE AND |
| EXPERIENCE. |
| (B) LIST FEDERAL, STATE, MUNICIPAL, AND COUNTY |
| STANDARDS, CODES, ORDINANCES, LAWS, AND RULES, WITH |
| THEIR EFFECTIVE DATES, THAT THE ENGINEERING DOCUMENTS |
| ARE INTENDED TO CONFORM TO. |
| (C) INFORMATION, AS DETERMINED BY THE ENGINEER OF |
| RECORD, NEEDED FOR THE SAFE AND EFFICIENT OPERATION OF |
| THE SYSTEM. |
| (D) LIST ENGINEERING DESIGN CRITERIA; REFERENCE PROJECT |
| SPECIFIC STUDIES, REPORTS, AND DELEGATED ENGINEERING |
| DOCUMENTS. |
| (E) IDENTIFY CLEARLY ELEMENTS OF THE DESIGN THAT VARY |
| FROM THE GOVERNING STANDARDS AND DEPICT/IDENTIFY THE |
| ALTERNATE METHOD USED TO ENSURE COMPLIANCE WITH THE |
| STATED PURPOSE OF THESE RESPONSIBILITY RULES. |
| (2) ENGINEERS SHALL LEGIBLY INDICATE THEIR NAME AND |
| BUSINESS ADDRESS, ON ENGINEERING DOCUMENTS. ENGINEERING |
| DOCUMENTS WHICH ARE ISSUED FOR PRELIMINARY OR |
| CONCEPTUAL USE, SHALL CLEARLY NOTE THE INTENDED PURPOSE |
| OF SUCH DOCUMENTS. |
| (3) WHEN ELEMENTS OF THE PROJECT ARE SHOWN ON AN |
| ENGINEERING DOCUMENT ONLY FOR INFORMATION OR |
| CLARIFICATION AND THE ENGINEER DOES NOT INTEND TO |
| ACCEPT RESPONSIBILITY FOR THE ELEMENTS, THE ENGINEER |
| SHALL CLEARLY NOTE ON THE DOCUMENTS THE EXTENT OF HIS |
| RESPONSIBILITY. |
| (4) ENGINEERING DRAWINGS SHALL BE LEGIBLE AND CLEARLY |
| DEFINE AND DELINEATE THE WORK IN THE PROJECT. THEY MUST |
| ALSO COMPLY WITH CHAPTER 61G15-23, F.A.C., SEALS. |
| (5) ENGINEERS SHALL CLEARLY NOTE ON ANY PRELIMINARY |
| ENGINEERING DOCUMENTS THAT SUCH DOCUMENTS ARE NOT IN |
| FINAL FORM, BUT ARE BEING TRANSMITTED TO THE PUBLIC |
| AGENCY TO RECEIVE AGENCY REVIEWS, COMMENTS AND |
| INTERPRETATIONS. THE DOCUMENTS MAY SUBSEQUENTLY BE |
| REVISED BY THE ENGINEER TO REFLECT RESOLUTION OF ISSUES |
| WITH THE PUBLIC AGENCY PRIOR TO FINAL ACTION BY THE |
| AGENCY. CHANGES, REVISIONS AND MODIFICATIONS TO A |
| PROJECT MAY PROMPT ADDITIONAL DOCUMENT SUBMITTAL FOR |
| AGENCY APPROVAL ACTION ON THE SAME PROJECT. |
| |
| |
| 3. FOR ALL SUBMITTED PERMIT SETS: |
| |
| THE PERMIT SET IS NOT ORGANIZED AND BOUND. AN ORGANIZED |
| REVIEW AND ACCOUNTING OF APPROVED PLANS CAN NOT BE |
| COMPLETED. THE SUBMITTED PLANS SHALL BE BOUND AND |
| ORGANIZED PER NFPA 1, 1.7.11 PLANS AND SPECIFICATIONS. |
| 1.7.11.1 THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE |
| PLANS AND SPECIFICATIONS TO ENSURE COMPLIANCE WITH |
| APPLICABLE CODES ANDSTANDARDS. |
| |
| 1.14 PLAN REVIEW. |
| 1.14.1 WHERE REQUIRED BY THE AHJ FOR NEW CONSTRUCTION, |
| MODIFICATION, OR REHABILITATION, CONSTRUCTION DOCUMENTS |
| AND SHOP DRAWINGS SHALL BE SUBMITTED, REVIEWED, AND |
| APPROVED PRIOR TO THE START OF SUCH WORK AS PROVIDED IN |
| SECTION 1.14. |
| 1.14.2 THE APPLICANT SHALL BE RESPONSIBLE TO ENSURE |
| THAT THE FOLLOWING CONDITIONS ARE MET: |
| (1) THE CONSTRUCTION DOCUMENTS INCLUDE ALL OF THE FIRE |
| PROTECTION REQUIREMENTS. |
| (2) THE SHOP DRAWINGS ARE CORRECT AND IN COMPLIANCE |
| WITH THE APPLICABLE CODES AND STANDARDS. |
| (3) THE CONTRACTOR MAINTAINS AN APPROVED SET OF |
| CONSTRUCTION DOCUMENTS ON SITE. |
| |
| THE SUBMITTED PLANS CAN NOT BE MAINTAINED AT ANY |
| LOCATION IN IT'S CURRENT DISORGANIZED/LOOSE FASHION. |
| |
| |
| 4. PROVIDE A NARRATIVE OR NOTE INDICATING THAT NO FUEL, |
| GAS OR DIESEL, SHALL BE PUMPED, USED, OR STORED IN ANY |
| BUILDING OR ON SITE AT ANY TIME. |
| |
| |
| SITE PLAN SUBMITTAL - |
| |
| 1. SHEET TK 101 - THERE IS NO REFERENCES TO ANY NFPA |
| CODE REQUIREMENTS. |
| |
| THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE |
| 5TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING |
| THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER |
| APPLICABLE CODES OR STANDARDS. |
| FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS |
| OF NFPA 13, 2010 EDITION. |
| FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| NFPA 72, 2010 EDITION. |
| CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| NFPA 241, 2009 EDITION. |
| FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS |
| OF NFPA 10, 2010 EDITION. |
| ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2011 EDITION. |
| |
| 2. SHEET TK 112 - THE ACCESS ROAD SHOW A WIDTH OF 16' |
| ALONG THE EAST SIDE AND 18' ALONG THE WEST. THE ACCESS |
| ROAD IS THE ONLY TRAVEL LANE THROUGH THE SITE AND IS |
| REQUIRED TO BE A FIRE LANE. PER NFPA 1. CHAPTER 18, |
| |
| 18.2.3 FIRE DEPARTMENT ACCESS ROADS. |
| 18.2.3.1 REQUIRED ACCESS. |
| 18.2.3.4 SPECIFICATIONS. |
| 18.2.3.4.1 DIMENSIONS. |
| 18.2.3.4.1.1 FIRE DEPARTMENT ACCESS ROADS SHALL HAVE AN |
| UNOBSTRUCTED WIDTH OF NOT LESS THAN 20 FT (6.1 M). |
| 18.2.3.4.1.2 FIRE DEPARTMENT ACCESS ROADS SHALL HAVE AN |
| UNOBSTRUCTED VERTICAL CLEARANCE OF NOT LESS THAN 13 FT |
| 6 IN. (4.1 M). |
| 18.2.3.4.1.2.1 VERTICAL CLEARANCE SHALL BE PERMITTED TO |
| BE REDUCED, PROVIDED SUCH REDUCTION DOES NOT IMPAIR |
| ACCESS BY FIRE APPARATUS, AND APPROVED SIGNS ARE |
| INSTALLED AND MAINTAINED INDICATING THE ESTABLISHED |
| VERTICAL CLEARANCE WHEN APPROVED. |
| 18.2.3.4.1.2.2 VERTICAL CLEARANCES OR WIDTHS SHALL BE |
| INCREASED WHEN VERTICAL CLEARANCES OR WIDTHS ARE NOT |
| ADEQUATE TO ACCOMMODATE FIRE APPARATUS. |
| |
| 3. SHEET TK 114 - ALL GATE ACCESS AND EGRESS POINTS |
| SHALL BE EQUIPPED WITH KNOW KEY SWITCHES OR KNOX |
| PADLOCKS. NFPA 1, CHAPTER 18, |
| 18.2.2.2 ACCESS TO GATED SUBDIVISIONS OR DEVELOPMENTS. |
| THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE FIRE |
| DEPARTMENT ACCESS BE PROVIDED TO GATED SUBDIVISIONS OR |
| DEVELOPMENTS THROUGH THE USE OF AN APPROVED DEVICE OR |
| SYSTEM |
| |
| 4. SHEET RD 101 - THERE IS NO REFERENCES TO ANY NFPA |
| CODE REQUIREMENTS. |
| |
| THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE |
| 5TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING |
| THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER |
| APPLICABLE CODES OR STANDARDS. |
| FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS |
| OF NFPA 13, 2010 EDITION. |
| FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| NFPA 72, 2010 EDITION. |
| CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| NFPA 241, 2009 EDITION. |
| FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS |
| OF NFPA 10, 2010 EDITION. |
| ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2011 EDITION. |
| |
| 5. SHEET RD 302 - THERE APPEARS TO BE A REFENCE TO A |
| 12' TRAFFIC LANE. THIS LANE IS REQUIRED TO BE A FIRE |
| LANE, PER 18.2.3.4.1.1 FIRE DEPARTMENT ACCESS ROADS |
| SHALL HAVE AN UNOBSTRUCTED WIDTH OF NOT LESS THAN 20 FT |
| (6.1 M). |
| |
| 6. SHEET UT 100 - THERE IS NO REFERENCES TO ANY NFPA |
| CODE REQUIREMENTS. |
| |
| THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE |
| 5TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING |
| THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER |
| APPLICABLE CODES OR STANDARDS. |
| FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS |
| OF NFPA 13, 2010 EDITION. |
| FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| NFPA 72, 2010 EDITION. |
| CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF |
| NFPA 241, 2009 EDITION. |
| FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS |
| OF NFPA 10, 2010 EDITION. |
| ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2011 EDITION. |
| |
| 7. SHEET UT 200 & 201 - THERE APPEARS TO BE NO ON- SITE |
| FIRE HYDRANT ON THIS SHEET OR ANY OTHER SHEET. PROVIDE |
| DETAILED FIRE FLOW REQUIREMENTS PER NFPA 1 AND THE |
| REQUIRED SPACING OF FIRE HYDRANTS PER ANNEX TABLE E3. |
| 18.4 FIRE FLOW REQUIREMENTS FOR BUILDINGS. |
| 18.4.1* SCOPE. |
| 18.4.1.1* THE PROCEDURE DETERMINING FIRE FLOW |
| REQUIREMENTS FOR BUILDINGS HEREAFTER CONSTRUCTED OR |
| MOVED INTO THE JURISDICTION SHALL BE IN ACCORDANCE WITH |
| SECTION 18.4. |
| 18.5 FIRE HYDRANTS. |
| 18.5.1* THE NUMBER AND TYPE OF FIRE HYDRANTS AND |
| CONNECTIONS TO OTHER APPROVED WATER SUPPLIES SHALL BE |
| CAPABLE OF DELIVERING THE REQUIRED FIRE FLOW AND SHALL |
| BE PROVIDED AT APPROVED LOCATIONS. A.18.5.1 SEE ANNEX E |
| FOR GUIDANCE DETERMINING NUMBER AND LOCATION OF FIRE |
| HYDRANTS. |
| 18.5.2 FIRE HYDRANTS AND CONNECTIONS TO OTHER APPROVED |
| WATER SUPPLIES SHALL BE ACCESSIBLE TO THE FIRE |
| DEPARTMENT. |
| |
| 8. SHEET UT 202 & 304 - THE LOCATION OF THE PROPOSED |
| FDC IS NOT APPROVED. PER NFPA 24, CHAPTER 5, |
| |
| 5.9.5 LOCATION AND SIGNAGE. |
| 5.9.5.1* FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED |
| AT THE NEAREST POINT OF FIRE DEPARTMENT APPARATUS |
| ACCESSIBILITY OR AT A LOCATION APPROVED BY THE |
| AUTHORITY HAVING JURISDICTION. |
| 5.9.5.2* FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED |
| AND ARRANGED SO THAT HOSE LINES CAN BE ATTACHED TO THE |
| INLETS WITHOUT INTERFERENCE. |
| |
| NFPA 13, CHAPTER 7, 8 |
| |
| 7.8.2.3 WHERE FIRE DEPARTMENT CONNECTIONS ARE USED FOR |
| WATER SUPPLY, THEY SHALL BE SO LOCATED THAT THEY WILL |
| NOT BE AFFECTED BY THE EXPOSING FIRE. |
| |
| 8.17.2.4.6* FIRE DEPARTMENT CONNECTIONS SHALL BE |
| LOCATED AT THE NEAREST POINT OF FIRE DEPARTMENT |
| APPARATUS ACCESSIBILITY OR AT A LOCATION APPROVED BY |
| THE AUTHORITY HAVING JURISDICTION. |
| |
| 9. SHEET UT 304 - THE LOCATION OF THE EXITING FIRE |
| HYDRANT IS NOT WITHIN 150' OF THE FDC. A FIRE HYDRANT |
| SHALL BE LOCATED WITHIN 150' OF THE FDC; 50' WOULD BE |
| OPTIMAL FOR EFFECTIVE AND EFFICIENT FIRE GROUND |
| OPERATIONS. |
| |
| 10. SHEET UT 400 - ALL TAPS INTO THE CITY WATER SUPPLY |
| SYSTEM SHALL BE REVIEWED AND APPROVED BY AND THROUGH |
| THE CITY OF WEST PALM BEACH ENGINEERING AND/OR |
| UTILITIES DEPARTMENTS. |
| |
| |
| |
| BUILDING C SUBMITTAL |
| |
| 1. SHEET AA 101 - UNDER APPLICABLE CODES THERE IS AN |
| INCORRECT DATE (2207) FOR THE APPLICABLE CODE. |
| |
| THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE |
| 5TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING |
| THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER |
| APPLICABLE CODES OR STANDARDS. |
| |
| 2. SHEET AA 102 - MEZZANINE LEVEL; ONLY ONE EXIT IS |
| INDICATED. PER NFPA 101, CHAPTER 7, |
| |
| 7.4* NUMBER OF MEANS OF EGRESS. |
| 7.4.1 GENERAL. |
| 7.4.1.1 THE NUMBER OF MEANS OF EGRESS FROM ANY BALCONY, |
| MEZZANINE, STORY, OR PORTION THEREOF SHALL BE NOT LESS |
| THAN TWO, EXCEPT UNDER ONE OF THE FOLLOWING CONDITIONS: |
| (1) A SINGLE MEANS OF EGRESS SHALL BE PERMITTED WHERE |
| PERMITTED IN CHAPTERS 11 THROUGH 43. |
| (2) A SINGLE MEANS OF EGRESS SHALL BE PERMITTED FOR A |
| MEZZANINE OR BALCONY WHERE THE COMMON PATH OF TRAVEL |
| LIMITATIONS OF CHAPTERS 11 THROUGH 43 ARE MET. |
| |
| CHAPTER 38, NEW BUSINESS OCCUPANY; |
| |
| 38.2.4.5 A SINGLE MEANS OF EGRESS SHALL BE PERMITTED |
| FROM A MEZZANINE WITHIN A BUSINESS OCCUPANCY, PROVIDED |
| THAT THE COMMON PATH OF TRAVEL DOES NOT EXCEED 75 FT |
| (23 M), OR 100 FT (30 M) IF PROTECTED THROUGHOUT BY AN |
| APPROVED, SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN |
| ACCORDANCE WITH 9.7.1.1(1). |
| |
| THE COMMON PATH OF TRAVLE APPEARS TO BE EXCEEDED AND A |
| SECOND EXT IS REQUIRED. |
| |
| 3. SHEET AA 124-127 - THE MEZZANINE STAIR DETAIL IS NOT |
| PROVIDED. PROVIDE CODE COMPLIANT MEZZANINE STAIR |
| DETAIL, PER NFPA 101, CHAPTER 7. |
| |
| 4. SHEET AA 102 - THE MEZZANINE ACCESS INDICATES |
| PASSAGE THROUGH THE WORKSHOP AREA TO DOOR 113 A. PER |
| NFPA 101, CHAPTER 7; |
| |
| 7.5.2 IMPEDIMENTS TO EGRESS. SEE ALSO 7.1.9 AND |
| 7.2.1.5. |
| 7.5.2.1* ACCESS TO AN EXIT SHALL NOT BE THROUGH |
| KITCHENS, STOREROOMS OTHER THAN AS PROVIDED IN CHAPTERS |
| 36 AND 37, RESTROOMS, WORKROOMS, CLOSETS, BEDROOMS OR |
| SIMILAR SPACES, OR OTHER ROOMS OR SPACES SUBJECT TO |
| LOCKING, UNLESS PASSAGE THROUGH SUCH ROOMS OR SPACES IS |
| PERMITTED FOR THE OCCUPANCY BY CHAPTER 18, 19, 22, OR |
| 23. |
| |
| THE MEZZANINE EXIT ACCESS SHALL NOT PASS THROUGH THIS |
| ROOM AND REQUIRES CORRECTION. |
| |
| 5. SHEET ECA 402 - THE PROPOSED EMERGENCY GENERATOR AND |
| INSTALLATION SHALL BE UNDER SEPARATE PERMIT. PROVIDE AN |
| INDICATING NOTE. |
| |
| 6. SHEET FP 002 - UNDER DESIGN CRITERIA SECTION I) |
| INDICATES THE FDC LOCATION THAT HAS NOT BEEN APPROVED. |
| PROVED A NOTE INDICATING "WHERE APPROVED BY THE AHJ". |
| |
| 7. SHEET FP 100 & 102 - INDICATES THAT IT RM PROTECTED |
| BY A CLEAN AGENT SYSTEM. THE USE OF A CLEAN AGENT |
| SYSTEM DOES ALLOW FOR THE ELIMINATION OF THE REQUIRED |
| FULLY SPRINKLERD PER NFPA 13. |
| |
| |
| BUILDING D SUBMITTAL - |
| |
| 1. SHEET AA 314 & 322 - PROVIDE LIGHT FRAME TRUSS |
| SGNAGE PER FS; |
| |
| PER FLORIDA 69A-60.0081; NOTICE SIGNAGE IS REQUIRED FOR |
| STRUCTURES WITH LIGHT-FRAME TRUSS-TYPE CONSTRUCTION. |
| ANY COMMERCIAL, INDUSTRIAL, OR ANY MULTIUNIT |
| RESIDENTIAL STRUCTURE OF THREE UNITS OR MORE WHICH USES |
| HORIZONTAL OR VERTICAL LIGHT-FRAME TRUSS-TYPE |
| CONSTRUCTION IN ANY PORTION SHALL BE MARKED WITH A |
| MALTESE CROSS SIGN MEASURING 8 INCHES HORIZONTALLY AND |
| 8 INCHES VERTICALLY, OF A BRIGHT RED REFLECTIVE COLOR. |
| THE APPROVED SYMBOL SHALL BE PLACED WITHIN 24 INCHES TO |
| THE LEFT OF THE MAIN ENTRY DOOR. |
| A. STRUCTURES WITH LIGHT-FRAME TRUSS ROOFS SHALL BE |
| MARKED WITH THE LETTER "R". |
| B. STRUCTURES WITH LIGHT-FRAME TRUSS FLOOR SYSTEMS |
| SHALL BE MARKED WITH THE LETTER "F". |
| C. STRUCTURES WITH LIGHT-FRAME TRUSS FLOOR AND ROOF |
| SYSTEMS SHALL BE MARKED WITH THE LETTERS "R/F". |
| |
| 2. SHEET ECA 301 & 302 - FIRE ALARM NOTIFICATION |
| DEVICES ARE NOT LOCATED WITHIN THE PIT AREA. PROVIDE |
| NOTIFICATION DEVICES IN THE PIT AREAS |
| |
| 3. SHEET ECA 201 & 202 - EMERGENCY LIGHTING IS NOT |
| PROVICED OR INDICATED INT EH PIT AREA. PROVIDED FOR |
| EMERGENCY LIGHTING IN THE PIT AREAS. |
| |
| 4. SHEET FP 303-306 - FIRE SPRINKLER PROTECTION IS NOT |
| PROVIDED FOR THE PIT AREAS. FIRE SPRINKLER PROTECTION |
| SHALL BE PROVIDED IN ALL AREAS. |
| |
| 5. SHEET AA 301 - PROVIDE INDIOCATION OF FIRE SPRINKLER |
| SYSTEM IS PROTECTED AGAINST EXPOSURE TO OUTSIDE WEATHER |
| ELEMENTS/CORROSION. |
| |
| 6. SHEET MP 100 - IS THERE A MECHANICAL SHUT OFF FOR |
| THE PIT HVAC SYSTEM ? PROVIDE INDICATING NOTE. |
| |
| 7. SHEET MP 100 - IS THERE CO DETECTION WITHIN THE PIT |
| ? PROVIDE A INDICATING NOTE. |
| |
| |
| |
| BUILDING E SUBMITTAL - |
| |
| 1. PROVIDE A NARRATIVE OR NOTE INDICATING THAT NO FUEL, |
| GAS OR DIESEL, SHALL BE STORED IN THIS BUILDING OR ON |
| SITE AT ANY TIME. |
| |
| 2. SHEET AA 200 - PROVIDE THE CLASS OF EACH FLAMMABLE |
| LIQUID PER NFPA 30. |
| |
| 3. SHEET AA 201 - THE LIFE SAFETY PLAN DOES NOT |
| INDICATE ANY SPILL CONTAINMENT EQUIPMENT OR FEATURES. |
| PROVIDE CONTAINMENT FOR ALL FLAMMABLE LIQUIED PER NFPA |
| 30. |
| |
| 4. SHEET AA 204 - THE WALL SECTIONS ON THIS SHEET THAT |
| ARE REFERRED TO ON SHEET AA 201 AS FIRE RATED ARE NOT |
| INDICATED AS RATED AND DO NOT HAVE A UL LISTING. PLEASE |
| CORRECT. |
| |
| 5. SHEET AA 205 - THE DOOR HARDWARE TYPE IS NOT |
| INDICATED. |
| |
| |
| |
| |
| THE BUREAU'S REVIEW OF THIS SUBMITTED PROJECT DOES NOT |
| CONSTITUTE IT'S FINAL REVIEW. |
| |
| THE BUREAU SHALL REVIEW ALL RE-SUBMITTED BUILDING PLANS |
| AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH THE |
| REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS. |
| |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |
| |
| |
| |
| |
| |