Plan Review Stops For Permit 16020141 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2016-09-16 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2016-09-16 |
Time |
12:11 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2016-09-16 |
Time |
12:11 |
Sent To |
M |
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2016-05-05 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2016-05-05 |
Time |
12:05 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2016-05-05 |
Time |
10:48 |
Sent To |
|
|
Notes |
2016-05-05 12:09:30 | 2ND REVIEW: FBC 2014 5TH ED | | CHRISTOPHER S. THROOP, C.B.O. | | BLDG. PLANS EXAMINER ? PX3169 | | (561) 805-7918 | | [email protected] | | | | 1. PROVIDE WIND LOAD ENGINEERING FOR NEW EXTERIOR | | COMPONENTS. | | | | FBC 449.4.2.4.3 | | ALL NEW ROOF APPENDAGES SUCH AS DUCTS, TANKS, | | VENTILATORS, RECEIVERS, DX CONDENSING UNITS AND | | DECORATIVE MANSARD ROOFS AND THEIR ATTACHMENT SYSTEMS | | SHALL BE STRUCTURALLY ENGINEERED TO MEET THE WIND LOAD | | REQUIREMENTS OF THE APPLICABLE BUILDING CODE. ALL OF | | THESE ATTACHMENT SYSTEMS SHALL BE CONNECTED DIRECTLY TO | | THE UNDERLYING ROOF STRUCTURE OR ROOF SUPPORT | | STRUCTURE. | | | | FBC 1603.1.4 WIND DESIGN DATA. | | THE FOLLOWING INFORMATION RELATED TO WIND LOADS SHALL | | BE SHOWN, REGARDLESS OF WHETHER WIND LOADS GOVERN THE | | DESIGN OF THE LATERAL FORCE-RESISTING SYSTEM OF THE | | STRUCTURE: | | 1. ULTIMATE DESIGN WIND SPEED, VULT, (3-SECOND GUST), | | MILES PER HOUR (KM/HR) AND NOMINAL DESIGN WIND SPEED, | | VASD, AS DETERMINED IN ACCORDANCE WITH SECTION | | 1609.3.1. | | 2. RISK CATEGORY. | | 3. WIND EXPOSURE. APPLICABLE WIND DIRECTION IF MORE | | THAN ONE WIND EXPOSURE IS UTILIZED. | | 4. APPLICABLE INTERNAL PRESSURE COEFFICIENT. | | 5. DESIGN WIND PRESSURES TO BE USED FOR EXTERIOR | | COMPONENT AND CLADDING MATERIALS NOT SPECIFICALLY | | DESIGNED BY THE REGISTERED DESIGN PROFESSIONAL | | RESPONSIBLE FOR THE DESIGN OF THE STRUCTURE, PSF (KN/ | | M2). | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2016-02-04 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2016-02-04 |
Time |
15:09 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2016-02-04 |
Time |
15:09 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2016-04-07 |
|
|
Cont ID |
|
Sent By |
mvaldes |
Date |
2016-04-07 |
Time |
18:12 |
Rev Time |
0.00 |
Received By |
mvaldes |
Date |
2016-04-07 |
Time |
18:12 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2016-02-04 |
|
|
Cont ID |
|
Sent By |
mvaldes |
Date |
2016-02-04 |
Time |
17:35 |
Rev Time |
0.00 |
Received By |
mvaldes |
Date |
2016-02-04 |
Time |
17:34 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
P |
Date |
2016-08-31 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2016-08-31 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2016-08-31 |
Time |
14:59 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2016-04-07 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2016-04-07 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2016-04-07 |
Time |
11:44 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2016-02-10 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2016-02-10 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2016-02-10 |
Time |
10:36 |
Sent To |
Z |
|
Notes |
2016-02-10 11:36:31 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | 1. SHEET A 1 - THE CORRIDOR WALLS APPEAR TO BE 1 HOUR | | FIRE RATED. THE NEW WALL, W2, DOES NOT HAVE A RATING. | | THE NEW WALL SHALL MEET THE REQUIREMENTS OF THE | | EXISTING CORRIDOR WALLS; 1 HOUR. | | | | 2. SHEET A 1 - DOOR 02 IS LOCATED WITHIN W2 IS REQUIRED | | TO BE A FIRE RATED WALL. THE DOOR AND DOOR ASSEMBLY | | SHALL BE FIRE RATED TO MATCH THE WALL. | | | | 3. SHEET A 1 - THERE IS A WALL TYPE IN THE CORNER OF | | THE EXHAUST ROOM INDICATED AS W1A, THERE IS NO DESIGN | | DETAIL CALL-OUT FOR THAT WALL TYPE. | | | | 4. SHEET A 1 - THE BACK WALL OF THE EXHAUST ROOM | | ADDITION IS INDICATED AS W3, HOWEVERM THE EXISTING WALL | | TYPE IS NOT INDICATED. BASED ON THE EXISTING WALL TYPE | | DOES THE ADDITIONAL WAAL TYPE REQUIRE IT TO BE SEALED | | AS ALL THE OTHE OTHER WALL TYPES WITHIN THAT ROOM? | | | | 5. PROVIDE A NOTE INDICATING THAT FIRE SPRINKLER AND | | FIRE ALARM WORK SHALL BE DONE UNDER SEPARATE SHOP | | DRAWINGS. | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2016-09-19 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2016-09-19 |
Time |
08:54 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2016-08-26 |
Time |
10:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2016-05-05 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2016-05-05 |
Time |
12:05 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2016-04-04 |
Time |
15:10 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2016-03-08 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2016-03-08 |
Time |
13:32 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2016-02-03 |
Time |
10:01 |
Sent To |
|
|
Notes |
2016-03-08 13:23:54 | TO S. KENNEDY. | 2016-02-05 11:43:31 | B28 | 2016-02-04 10:02:09 | BLDG MISC 2 |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
4 |
Status |
P |
Date |
2016-09-19 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2016-09-19 |
Time |
08:54 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2016-09-19 |
Time |
08:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
F |
Date |
2016-09-07 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2016-09-07 |
Time |
15:11 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2016-09-07 |
Time |
15:11 |
Sent To |
|
|
Notes |
2016-09-07 15:25:38 | 3RD REVIEW FBC-2014 MECHANICAL | | PERMIT #16020141 | | 9/7/16 | | | | 1) THE RELOCATED GENERATOR ROOM EXHAUST DOES NOT APPEAR | | TO BE A MINIMUM 10' ABOVE THE WALKWAY AS REQUIRED BY | | SECTION 501.3.1 (2). PROVIDE A CLEARANCE DISTANCE | | MEASUREMENT FROM THE ADJOINING GRADE PLANE TO THE | | BOTTOM LIP OF THE DUCT OPENING. PLEASE NOTE THE EXHAUST | | IS ALSO PROHIBITED FROM BEING DIRECTED ONTO WALKWAYS | | PER SECTION 501.3.1.1. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
F |
Date |
2016-04-11 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2016-04-11 |
Time |
12:22 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2016-04-11 |
Time |
12:22 |
Sent To |
|
|
Notes |
2016-04-11 12:48:50 | 2ND REVIEW: FBC 2014 MECHANICAL | | PERMIT #16020141 | | 4/11/16 | | | | 1) PLEASE REFER TO NFPA 37-2010 ANNEX EXPLANATORY | | MATERIAL, SECTIONS A.8.2.3.1 AND A.11.4.2.3, IT APPEARS | | THAT THE INTENTION IS TO HAVE THE EXHAUST FROM BOTH THE | | GENERATOR ENGINE AND FROM THE GENERATOR ROOM TERMINATE | | OUTSIDE OF THE BUILDING AND NOT UNDERNEATH THE | | STRUCTURE. | | | | A.8.2.3.1: EXHAUST SYSTEMS SHOULD NOT TERMINATE UNDER | | STRUCTURES (INCLUDING LOADING PLATFORMS) OR WHERE | | EXHAUST GAS ENTRAINMENT INTO VENTILATION INTAKES MIGHT | | OCCUR. | | | | A.11.4.2.3: MECHANICAL VENTILATION SYSTEMS CAN CONSIST | | OF THE NORMAL VENTILATION SYSTEM FOR THE ROOM OR | | ENCLOSURE OR A DEDICATED PURGE SYSTEM. EXHAUST AIR | | SHOULD DISCHARGE OUTSIDE THE STRUCTURE, AWAY FROM | | OPERABLE WINDOWS AND OUTSIDE AIR INTAKES. IN LOCATING | | THE EXHAUST AIR DISCHARGE, CONSIDERATION SHOULD BE | | GIVEN TO BOTH THE ENGINE ENCLOSURE AND NEARBY | | STRUCTURES. | | CHAPTER 15, "AIRFLOW AROUND BUILDINGS," OF THE ASHRAE | | 1997 HANDBOOK-FUNDAMENTALS CAN BE CONSULTED FOR | | GUIDELINES ONEXHAUST AIR STACK HEIGHT AND DISTANCE FROM | | OTHER STRUCTURES, AS WELL AS AIR INTAKES NEEDED TO | | PROVIDE ADEQUATE DILUTION AND TO AVOID DETRIMENTAL | | EFFECTS OF DOWNDRAFTS. | | | | A) REFER TO SECTIONS 501.3 AND 501.3.1(4) FBC-14 | | MECHANICAL WHICH REQUIRE THE EXHAUST SYSTEMS NOT TO | | TERMINATE WHERE THEY COULD CAUSE A NUISANCE, OR BE | | READILY DRAWN INTO A VENTILATING SYSTEM, AND MUST BE 3' | | FROM EXTERIOR WALLS AND ROOFS. | | | | 2) THE SCREENING FOR THE GENERATOR ROOM EXHAUST DUCT | | SHALL BE CORROSION RESISTANT WITH OPENINGS NOT LESS | | THAN 1/4" AND NOT LARGER THAN 1/2". THE 1" WELDED | | STAINLESS MEXH SPECIFIED ON THE PLANS DOES NOT MEET THE | | CODE. | | | | 3) PLEASE PROVIDE WIND LOAD ENGINEERING FOR | | INSTALLATION OF THE GEF-1 AND EXHAUST DUCTWORK- SECTION | | 301.15. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] | | | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2016-02-05 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2016-02-05 |
Time |
10:30 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2016-02-05 |
Time |
09:50 |
Sent To |
|
|
Notes |
2016-02-05 11:16:11 | 1ST REVIEW: FBC 2014 MECHANICAL | | PERMIT #160201421 | | 2/5/16 | | | | 1) THE NEW W2 WALL AND ALL OTHER WALLS AND CEILINGS | | HOUSING THE EXTENDED GENERATOR ROOM MUST HAVE A MINIMUM | | 1HR. FIRE-RESISTANCE RATING PER SECTION 4.1.2.1.1 NFPA- | | 37. PLEASE REVISE THE PLANS ACCORDINGLY AND INCLUDE A | | MINIMUM 45 MINUTE FIRE-RATED DOOR WITH SELF CLOSING | | HARDWARE- SECTION 716 FBC-14 BUILDING. THIS NEW ROOM IS | | AN EXHAUST PLENUM FOR THE GENERATORS AND DOES NOT | | APPEAR TO BE SEPARATED BY FIRE-RATED CONSTRUCTION. | | 2) PROVIDE UL TESTED AND APPROVED FIRE-STOPPING | | ASSEMBLIES FOR THE 56"X26" ROOM EXHAUST DUCT AND THE | | ENGINE EXHAUST PIPE THIMBLES PENETRATING FIRE-RATED | | WALLS. CLARIFY IF THE DUCT WILL HAVE A GRILL COVER AND | | PROVIDE A DETAIL. | | 3) INDICATE THE DIAMETERS OF THE EXHAUST THIMBLES- | | MINIMUM 12" IS REQUIRED PER SECTION 8.3.3 (1) NFPA 37. | | 4) PROVIDE DETAILS FOR BOTH THE ROOM EXHAUST AND ENGINE | | EXHAUST DUCTS: TYPE AND GAUGE OF STEEL, HANGER TYPES | | AND SIZES, SPAN OF HANGER SUPPORTS, REINFORCEMENT AND | | SEALING METHODS. | | 5) PROVIDE AN ELEVATION VIEW OF THE EXHAUST OUTLETS | | INDICATING REQUIRED CLEARANCE DISTANCE MEASUREMENTS AS | | OUTLINED IN SECTION 501.3.1 FBC-214 MECHANICAL. | | 6) PROVIDE APPROVED TERMINATION CAPS FOR THE ENGINE | | EXHAUST DUCTS- REFER TO SECTION 8.2.3 NFPA 37. | | 7) PLEASE NOTE THE DRAWING INDEX INDICATES M1.2 WHCIH | | WAS NOT INCLUDED IN THE PLAN SETS. SHEET M3.1 WAS | | INCLUDED IN THE SETS BUT IS NOT SHOWN IN THE INDEX. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2016-04-27 |
|
|
Cont ID |
|
Sent By |
aaponte |
Date |
2016-04-27 |
Time |
10:01 |
Rev Time |
0.00 |
Received By |
aaponte |
Date |
2016-04-27 |
Time |
10:01 |
Sent To |
|
|
Notes |
2016-04-27 10:01:39 | EXHAUST SHALL NOT PROJECT OUT FROM THE BUILDING FACE. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2016-03-08 |
|
|
Cont ID |
|
Sent By |
aaponte |
Date |
2016-03-08 |
Time |
13:23 |
Rev Time |
0.00 |
Received By |
aaponte |
Date |
2016-03-08 |
Time |
13:23 |
Sent To |
|
|
Notes |
2016-03-08 13:23:35 | EXHAUST SHALL NOT PROJECT OUT FROM THE BUILDING FACE. |
|
|