Plan Review Details - Permit 16020105
Plan Review Stops For Permit 16020105
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-02-18 Cont ID  
Sent By jwitmer Date 2016-02-18 Time 14:31 Rev Time 0.00
Received By jwitmer Date 2016-02-16 Time 15:58 Sent To E
Notes
2016-02-18 14:31:23BUILDING PLAN REVIEW
 W. P. B. PERMIT: 16020105
 ADD: 1001 S. FLAGLER DR. STAIR PRESSURIZATION
 CONT: HILL YORK SERVICES
 TEL: 561-689-7355
 E-MAIL: [email protected]
  
 2014 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 2014 EXISTING BUILDING CODE LEVEL II 701.3 COMPLIANCE.
 ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND
 SPACES SHALL COMPLY WITH THE REQUIREMENTS OF THE
 FLORIDA BUILDING CODE, BUILDING.
  
 1ST REVIEW
 DATE: THURS. FEB. 18/2016
 ACTION: DENIED
  
 1) A MEETING WAS HELD TODAY WITH THE CONTRACTOR CHRIS
 TYSON AND THE PRESIDENT OF P.B.A.U. AND MYSELF ON THE
 TOPIC OF STAIR PRESSUREIZATION AND THE COORDINATING OF
 THE PLANS FOR THE VARIOUS TRADES, WHO WILL BE THE
 DESIGNER OF RECORD FOR THE WHOLE PROJECT AND THE SHOP
 DRAWING OF THE APPROVAL BY THE DESIGNER OF RECORD. THE
 (2) SUBMITTED STAIR PRESSURE DESIGN DOCUMENTS WILL
 REFLECT THE SAME EQUIPMENT AND DESIGN, NOT TO DIFFERENT
 DESIGNS.
 2) WE ALSO TALKED ABOUT THE REQUIREMENT ON THE NEXT
 SUBMITTAL ALL EXISITNG PERMIT APPLICATIONS AND THE
 ADDITIONAL ELECTRICAL AND FIRE ALARM.
 3) THE CGC PERMIT APPLICATION WILL NEED TO BE MODIFIED
 IN THE SCOPE OF WORK TO REFLECT WHAT CAN BE COVERED
 UNDER THE CGC LICENSURE.
 4) THE CGC PERMIT AND PLANS WILL ALSO NEED TO REFLECT
 THE ROOF TOP CURBS, AND INTAKE FANS, AS WEL AS THE NEW
 A/C STANDS THAT WERE ADDED UNDER THE ROOFING PERMIT
 WHICH DOES NOT SHOW ANY OF THESE PRODUCT APPROVALS
 SUBMITTED UNDER THAT PERMIT IN FILE NET THE BUILDING
 DEPARTMENT RECORD RETENSION PROGRAM.
 THE ROOFING PERMIT ALSO INDICATES THE INSTALATION OF A
 NEW DOOR ITEM # 18 CORRIN DOOR, NO PRODUCT APPROVAL HAD
 BEEN SUBMITTED.
 , 1609.6.4.4.1 COMPONENTS & CLADDING
  
 FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV.
 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION
 SYSTEMS THAT WILL REQUIRE PRODUCT APPROVALS:
 (31)(A) EXTERIOR DOORS.
 (D) ROOFING PRODUCTS AND ASSEMBLIES
 (G) PRE-ENGINEERED A/C STANDS
  
 5) THE NEW HOLES IN EITHER THE ROOF SLAB AND OR WALL
 WILL ALSO NEED TO BE ADDRESSED AND THE REQUIRED
 ANCHORING OF THE ROOF TOP EXHAUST BACK DRAFT DAMPER.
 PLEASE PROVIDE THE WIND DESIGN CRITERIA AND ANCORING.
 2014 FBC-B 1603.1.4 WIND DESIGN DATA.
  
 6) WORK TO BE DETREMINED BY OTHERS:
 6A) NEW POWER WIRING, ELECTRICAL PLANS, DISCONNECTS BY
 ELECTRICAL CONTRACTOR.
 6B) CONTROL WIRING BY ELECTRICAL CONTRACTOR.
 6C) ROOF FLASHING FOR ROOF CURBS AND WALLS
 6D) INTERFACE OF NEW STAIRWELL PRESSURIZATION SYSTEM
 INTO THE EXISTING FIRE ALARM
 6E) EMERGENCY POWER FOR NEW STAIRWELL PRESSURIZATION
 FAN ( NOT HIGHRISE, MAY NOT HAVE A BACKUP GENERATOR)?
 6F) DOOR CLOSER AND ADJUSTMENTS
  
 7) 2014 FBC-B 909.2 GENERAL DESIGN REQUIREMENTS.
 BUILDINGS, STRUCTURES OR PARTS THEREOF REQUIRED BY THIS
 CODE TO HAVE A SMOKE CONTROL SYSTEM OR SYSTEMS SHALL
 HAVE SUCH SYSTEMS DESIGNED IN ACCORDANCE WITH THE
 APPLICABLE REQUIREMENTS OF SECTION 909 AND THE
 GENERALLY ACCEPTED AND WELL-ESTABLISHED PRINCIPLES OF
 ENGINEERING RELEVANT TO THE DESIGN. THE CONSTRUCTION
 DOCUMENTS SHALL INCLUDE SUFFICIENT INFORMATION AND
 DETAIL TO ADEQUATELY DESCRIBE THE ELEMENTS OF THE
 DESIGN NECESSARY FOR THE PROPER IMPLEMENTATION OF THE
 SMOKE CONTROL SYSTEMS. THESE DOCUMENTS SHALL BE
 ACCOMPANIED BY SUFFICIENT INFORMATION AND ANALYSIS TO
 DEMONSTRATE COMPLIANCE WITH THESE PROVISIONS.
  
 8) 2014 FBC-B 909.4 ANALYSIS. A RATIONAL ANALYSIS
 SUPPORTING THE TYPES OF SMOKE CONTROL SYSTEMS TO BE
 EMPLOYED, THEIR METHODS OF OPERATION, THE SYSTEMS
 SUPPORTING THEM AND THE METHODS OF CONSTRUCTION TO BE
 UTILIZED SHALL ACCOMPANY THE SUBMITTED CONSTRUCTION
 DOCUMENTS AND SHALL INCLUDE, BUT NOT BE LIMITED TO, THE
 ITEMS INDICATED IN SECTIONS 909.4.1 THROUGH 909.4.6.
  
 9) PLEASE SEE THE REQUIREMENTS FOR ROOF TOP GUARDS,
 1013.6 MECHANICAL EQUIPMENT.
 GUARDS SHALL BE PROVIDED WHERE APPLIANCES, EQUIPMENT,
 FANS, ROOF HATCH OPENINGS OR OTHER COMPONENTS THAT
 REQUIRE SERVICE ARE LOCATED WITHIN 10 FEET (3048 MM) OF
 A ROOF EDGE OR OPEN SIDE OF A WALKING SURFACE AND SUCH
 EDGE OR OPEN SIDE IS LOCATED MORE THAN 30 INCHES (762
 MM) ABOVE THE FLOOR, ROOF OR GRADE BELOW. THE GUARD
 SHALL BE CONSTRUCTED SO AS TO PREVENT THE PASSAGE OF A
 SPHERE 21 INCHES (533 MM) IN DIAMETER. THE GUARD SHALL
 EXTEND NOT LESS THAN 30 INCHES (762 MM) BEYOND EACH END
 OF SUCH APPLIANCE, EQUIPMENT, FAN OR COMPONENT.
  
 10) 1013.7 ROOF ACCESS. GUARDS SHALL BE PROVIDED WHERE
 THE ROOF HATCH OPENING IS LOCATED WITHIN 10 FEET (3048
 MM) OF A ROOF EDGE OR OPEN SIDE OF A WALKING SURFACE
 AND SUCH EDGE OR OPEN SIDE IS LOCATED MORE THAN 30
 INCHES (762 MM) ABOVE THE FLOOR, ROOF OR GRADE BELOW.
 THE GUARD SHALL BE CONSTRUCTED SO AS TO PREVENT THE
 PASSAGE OF A SPHERE 21 INCHES (533 MM) IN DIAMETER.
  
 11) WHEN RESUBMITTING PLANS PLEASE INDICATE THE
 REVISION & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES
 AS NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2016-02-19 Cont ID  
Sent By vperez Date 2016-02-19 Time 07:00 Rev Time 0.00
Received By vperez Date 2016-02-19 Time 06:57 Sent To  
Notes
2016-02-19 07:03:30INITIAL ELECTRICAL PLAN REVIEW
  
 APPLICABLE CODES IN EFFECT:
 FLORIDA BUILDING CODE 2014 5TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH
 EDITION
 NFPA 70- 2011
 COMMENTS:
  
 1. UNABLE TO PERFORM REVIEW AS NO ELECTRICAL HAS BEEN
 SUBMITTED FOR THE SCOPE SHOWN. PROVIDE AS PER FBC
 107.3.5 MINIMUM PLAN REVIEW CRITERIA.
 2. FURTHER COMMENTS MAY FOLLOW UPON RESUBMITTAL. PLEASE
 FEEL FREE TO CONTACT ME SHOULD YOU HAVE ANY QUESTIONS
 REGARDING THIS PROJECT.
  
  
 VALENTINO PEREZ
 ELECTRICAL PLANS EXAMINER II
 561-805-6717
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2016-02-09 Cont ID  
Sent By pleduc Date 2016-02-09 Time   Rev Time 0.00
Received By pleduc Date 2016-02-09 Time 11:59 Sent To  
Notes
2016-02-09 12:01:04THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 1. PROVIDE INFORMATION REGARDING THE SYSTEM DESIGN
 TYPE, DESIGN CRITERIA AND CALCULATIONS,
 EQUIPMENTLISTING IN COMPLIANCE WITH, NFPA 92, STANDARD
 FOR SMOKE CONTROL SYSTEMS.
  
 2. THE SYSTEM DESIGN SHALL PROVIDE NOTES, INDICATIONS
 AND INFORMATION COMPLYING WITH NFPA 101, CHAPTER 9
 BUILDING SERVICE AND FIRE PROTECTION EQUIPMENT,
 INCLUDING BUT NOT LIMITED TO,
  
 9.3 SMOKE CONTROL.
 9.3.1 WHERE REQUIRED BY THE PROVISIONS OF ANOTHER
 SECTION OF THIS
 CODE, SMOKE CONTROL SYSTEMS SHALL BE INSTALLED,
 INSPECTED, TESTED,
 AND MAINTAINED IN ACCORDANCE WITH NFPA 92, STANDARD FOR
 SMOKE
 CONTROL SYSTEMS; NFPA 204, STANDARD FOR SMOKE AND HEAT
 VENTING; OR NATIONALLY RECOGNIZED STANDARDS,
 ENGINEERING GUIDES,
 OR RECOMMENDED PRACTICES, AS APPROVED BY THE AUTHORITY
 HAVING
 JURISDICTION.
 9.3.2 THE ENGINEER OF RECORD SHALL CLEARLY IDENTIFY THE
 INTENT OF
 THE SYSTEM, THE DESIGN METHOD USED, THE APPROPRIATENESS
 OF THE
 METHOD USED, AND THE REQUIRED MEANS OF INSPECTING,
 TESTING, AND
 MAINTAINING THE SYSTEM.
 9.3.3 ACCEPTANCE TESTING SHALL BE PERFORMED BY A
 SPECIAL
 INSPECTOR IN ACCORDANCE WITH SECTION 9.9.
 9.3.4 SMOKE CONTROL SYSTEM OPERATION.
 9.3.4.1 FLOOR- OR ZONE-DEPENDENT SMOKE CONTROL SYSTEMS
 SHALL BE
 AUTOMATICALLY ACTIVATED BY SPRINKLER WATERFLOW OR SMOKE
 DETECTION
 SYSTEMS.
 9.3.4.2 MEANS FOR MANUAL OPERATION OF SMOKE CONTROL
 SYSTEMS
 SHALL BE PROVIDED AT AN APPROVED LOCATION.
  
 3. ADDITIONAL, COMMNETS MAY BE PROVIDED WITH THE
 RE-SUBMITTAL OF THE ABOVE REQUIREMENTS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-03-14 Cont ID  
Sent By jroach Date 2016-03-14 Time 15:16 Rev Time 0.00
Received By jroach Date 2016-02-05 Time 08:23 Sent To  
Notes
2016-02-19 07:04:252/19 TO CAROLINE FOR ROUTING
2016-02-05 08:25:21C13

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2016-02-05 Cont ID  
Sent By ccole Date 2016-02-05 Time 08:33 Rev Time 0.00
Received By ccole Date 2016-02-05 Time 08:33 Sent To  
Notes
2016-02-05 08:54:451ST REVIEW: FBC 2014 MECHANICAL
 PERMIT #16020105
 2/5/16
  
 1) REFER TO SECTION 513.4 FBC-14 MECHANICAL AND SUBMIT
 A RATIONAL ANALYSIS FROM A FL. LICENSED P.E. THAT
 DETAILS THE SMOKE CONTROL AND PRESSURIZATION SYSTEM
 DESIGN, HOW THE FANS WERE SIZED, METHODS OF OPERATION,
 SYSTEM SUPPORT ETC.
 2) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FANS
 REVIEWED AND APPROVED WITH SIGNATURE BY THE EOR. REFER
 TO SECTION 513.10.5. AND SHOW COMPLIANCE:
 FANS: IN ADDITION TO OTHER REQUIREMENTS, BELT-DRIVEN
 FANS SHALL HAVE 1.5 TIMES THE NUMBER OF BELTS REQUIRED
 FOR THE DESIGN DUTY WITH THE MINIMUM NUMBER OF BELTS
 BEING TWO. FANS SHALL BE SELECTED FOR STABLE
 PERFORMANCE BASED ON NORMAL TEMPERATURE AND, WHERE
 APPLICABLE, ELEVATED TEMPERATURE. CALCULATIONS AND
 MANUFACTURER'S FAN CURVES SHALL BE PART OF THE
 DOCUMENTATION PROCEDURES. FANS SHALL BE SUPPORTED AND
 RESTRAINED BY NONCOMBUSTIBLE DEVICES IN ACCORDANCE WITH
 THE STRUCTURAL DESIGN REQUIREMENTS OF THE FLORIDA
 BUILDING CODE, BUILDING. MOTORS DRIVING FANS SHALL NOT
 BE OPERATING BEYOND THEIR NAMEPLATE HORSEPOWER
 (KILOWATTS) AS DETERMINED FROM MEASUREMENT OF ACTUAL
 CURRENT DRAW. MOTORS DRIVING FANS SHALL HAVE A MINIMUM
 SERVICE FACTOR OF 1.15.
 3) GUARDS MAY BE REQUIRED DEPENDING ON THE WHERE THE
 FANS ARE TO BE INSTALTED ON THE ROOF- A MINIMUM 10'
 CLEARANCE TO THE ROOF EDGES IS REQUIRED.
 4) PROVIDE THE WIND LOAD DESIGN CRITERIA ON THE PLAN
 FOR TIE DOWN OF THE ROOF TOP FANS:WIND DESIGN CRITERIA
 2014 FBC-B 1609.1.1 DETERMINATION OF WIND DESIGN-
 CHAPTER 6 OF ASCE 7-10.
 1609.3 BASIC WIND SPEED FIGURE 1609.A-C
 1609.3 WIND SPEED CONVERSION
 A) THE BASIC WIND SPEED, VU, SHALL BE DETERMINED IN
 ACCORDANCE WITH 1609.3.1 & ASCE 7-10B
 B) AN IMPORTANCE FACTOR, FIGURE 1609 A-C, ASCE 7-10.
 C) AN EXPOSURE CATEGORY SHALL BE DETERMINED IN
 ACCORDANCE WITH 1609.4 & ASCE 7-10
 D) A HEIGHT AND EXPOSURE ADJUSTMENT COEFFICIENT, *
 SHALL BE DETERMINED FROM TABLE 1609.7.2. ASCE 7-10.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop Z ZONING
Rev No 1 Status P Date 2016-03-14 Cont ID  
Sent By jroach Date 2016-03-14 Time 15:15 Rev Time 0.00
Received By jroach Date 2016-03-14 Time 15:15 Sent To  