Plan Review Details - Permit 16010739
Plan Review Stops For Permit 16010739
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2016-02-25 Cont ID  
Sent By jwitmer Date 2016-02-25 Time 12:29 Rev Time 0.00
Received By jwitmer Date 2016-02-25 Time 11:54 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-02-04 Cont ID  
Sent By jwitmer Date 2016-02-04 Time 08:20 Rev Time  
Received By jwitmer Date 2016-02-04 Time 07:01 Sent To  
Notes
2016-02-04 08:20:20BUILDING PLAN REVIEW
 W. P. B. REVISION: 16010739
 W. P. B. PERMIT: 15080784
 ADD: 330 CLEMATIS ST. SUITE 110
 CONT: FINELINE CONSTRUCTION
 TEL: 561-582-7880 EXT. 306
 E-MAIL: ??????????
  
 2014 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 2014 EXISTING BUILDING CODE LEVEL II 701.3 COMPLIANCE.
 ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND
 SPACES SHALL COMPLY WITH THE REQUIREMENTS OF THE
 FLORIDA BUILDING CODE, BUILDING.
  
 1ST REVIEW
 DATE: THURS. FEB. 04/ 2016
 ACTION: DENIED
  
 1) SHEET 1.0A:
 1A) THE FLOOR PLAN SHOWS 138 SEATING SPACES AND ONLY
 ONLY 4 ACCESSIBLE SEATS. PLEASE SHOW COMPLIANCE WITH
 THE 2014 FBC-ACCESSIBILITY CODE.
 138 X 0.05= 6.9 OR 7 SEATING SPACES AT THE DINING
 SURFACES.
  
 1B) PLEASE SHOW COMPLIANCE WITH 2014 FBC-ACCESSIBLITY
 CODE 226.2 DISPERSION. THERE ARE NO ACCESSIBLE SPACES
 SHOWN FOR THE KITCHEN HIGH TOPS OR THE BAR HIGH TOPS.
 226.2 DISPERSION. DINING SURFACES AND WORK SURFACES
 REQUIRED TO COMPLY WITH 902 SHALL BE DISPERSED
 THROUGHOUT THE SPACE OR FACILITY CONTAINING DINING
 SURFACES.
  
 2) THE SUBMITTED PRODUCT APPROVAL FOR DATBAR 4080/8080
 STEEL DOORS SHOWS A COMPLIANCE METHOD 9N-3.005(1)(D) AN
 EVALUATION REPORT BY A LICENSED PROFESSIONAL ENGINEER.
 WITHIN THIS DOCUMENT IS A LISST OF TEST REPORTS AND
 REPORT NUMBERS. SINCE THIS IS NOT A FLORIDA APPROVAL OR
 A MIAMI-DADE NOA ,THERE WAS NONE OF THE TEST SUBMITTED
 FROM THE CTLA TESTING LABS TO BACK UP THE ENGINEERING
 LETTER.
  
 THE 2ND ISSUE IS CTLA CERTIFIED TESTING LABS OF ORLANDO
 AN APPROVED TESTING LAB? THERE HAS BEEN NO
 DOCUMENTATION AS OF THIS TESTING LAB.
  
 3) WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION
 & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
 A THOROUGH REVIEW CANNOT BE MADE AT THIS TIME, AS A
 RESULT OF THE ADDITIONAL INFORMATION REQUESTED
 ADDITIONAL COMMENTS MAY APPEAR THAT WERE NOT PART OF
 THIS REVIEW.
  
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2016-02-18 Cont ID  
Sent By rlecky Date 2016-02-18 Time 13:47 Rev Time 0.00
Received By rlecky Date 2016-02-18 Time 13:39 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2016-02-08 Cont ID  
Sent By albarran Date 2016-02-08 Time 13:29 Rev Time 0.00
Received By rlecky Date 2016-02-08 Time 12:43 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2016-02-17 Cont ID  
Sent By pleduc Date 2016-02-17 Time   Rev Time 0.00
Received By pleduc Date 2016-02-17 Time 12:26 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2016-01-26 Cont ID  
Sent By pleduc Date 2016-01-26 Time   Rev Time 0.00
Received By pleduc Date 2016-01-26 Time 13:23 Sent To  
Notes
2016-01-26 13:36:08THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
 1. THE NATURE OF THE REMODEL REQUIRES AN EVALUATION OF
 THE FIRE SPRINKLER SYSTEM FOR CODE COVERAGE AND
 COMPLIANCE.
  
 THE LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR FIRE
 SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT THE
 CONSTRUCTION PERIOD.
  
 ANY AND ALL WORK ON THE FIRE SPRINKLER SYSTEMS SHALL BE
 DONE UNDER SEPARATE SHOP DRAWINGS AND BY CERTIFIED LIFE
 SAFETY CONTRACTORS.
  
 ANY TIME THAT WORK ON THE LIFE SAFETY SYSTEMS,
 SPRINKLER AND/OR FIRE ALARM, EXCEEDS 4 HOURS, A FIRE
 WATCH SHALL BE IMPLEMENTED AND MAINTAINED UNTIL FULL
 AND COMPLETE PROTECTION IS RETURNED.
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-02-25 Cont ID  
Sent By   Date 2016-02-25 Time 12:29 Rev Time 0.00
Received By lmarchan Date 2016-02-16 Time 13:55 Sent To  
Notes
2016-02-16 13:58:50B29

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-02-08 Cont ID  
Sent By rlecky Date 2016-02-08 Time 13:37 Rev Time 0.00
Received By rlecky Date 2016-01-22 Time 11:53 Sent To  
Notes
2016-01-25 11:54:38B13

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2016-02-24 Cont ID  
Sent By ccole Date 2016-02-24 Time 08:55 Rev Time 0.00
Received By ccole Date 2016-02-24 Time 08:55 Sent To  
Notes
2016-02-24 09:02:09MECHANICAL PROVISO
 2/24/16
 PERMIT #16010739
  
 1) THE 12.5 TON RTU SHALL BE REMOVED FROM THE ROOF AND
 THE ROOF OPENING SHALL BE CAPPED AND WEATHERPROOFED.
 ENGINEERED STRUCTURAL DRAWINGS FOR THE CAPPING SHALL BE
 ON-SITE AT TIME OF INSPECTION.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2016-02-25 Cont ID  
Sent By jwitmer Date 2016-02-25 Time 12:08 Rev Time 0.00
Received By jwitmer Date 2016-02-24 Time 08:50 Sent To  
Notes
2016-02-25 12:09:09PASSED BY CHRIS COLE SEE PLANS FOR SSISGNATURE.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2016-02-05 Cont ID  
Sent By ccole Date 2016-02-05 Time 11:53 Rev Time 0.00
Received By ccole Date 2016-02-05 Time 11:53 Sent To  
Notes
2016-02-05 12:27:491ST REVIEW: FBC 2014 MECHANICAL
 PERMIT #15080784
 2/5/16
  
 1) PROVIDE AC LOAD CALCULATIONS FOR THE NEW SPLIT
 SYSTEM AC SYSTEMS- REFER TO SECTION C403.2.1 FBC-14
 ENERGY CONSERVATION.
 2) REMOVE RTU-1 FROM THE VENTILATION SCHEDULE AND
 INSERT AC- 4 & 5. ADJUST THE O/A CFM TOTALS BASED ON
 THE TOTAL CFM'S SHOWN IN THE AC EQUIPMENT SCHEDULE.
 3) PROVIDE A MECHANICAL ROOF PLAN INDICATING THE
 LOCATIONS OF THE NEW CONDENSERS AND REQUIRED WORKING
 CLEARANCES.
 4) THE ABANDONED RTU MUST BE REMOVED FROM THE ROOF AND
 THE ROOF OPENING MUST BE CAPPED. PROVIDE STRUCTURAL
 DETAILS FOR CAPPING THE OPENING.
 5) PROVIDE WIND LOAD TIE-DOWN ENGINEERING FOR MOUNTING
 THE CONDENSERS ON EXISTING OR NEW ROOF STANDS.
 6) PROVIDE CONDENSATE DISPOSAL PLANS FOR THE NEW AIR
 HANDLERS INCLUDING PIPING RUNS, DISCHARGE LOCATIONS,
 AND SECONDARY PROTECTION.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved