|
 |
 |
 |
 |
 |
Plan Review Details - Permit 16010659
Plan Review Stops For Permit 16010659 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2016-01-28 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2016-01-28 |
Time |
14:30 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2016-01-28 |
Time |
14:30 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2016-01-28 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2016-01-28 |
Time |
14:31 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2016-01-28 |
Time |
14:31 |
Sent To |
|
|
Notes |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
2 |
Status |
N |
Date |
2016-01-29 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-01-29 |
Time |
02:51 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-01-29 |
Time |
02:44 |
Sent To |
|
|
Notes |
2016-01-29 02:45:51 | GAS PLAN REVIEW | | A GAS PLAN HAS BEEN INCLUDED IN THIS SUBMITTAL PACKAGE | | BUT IT IS NOT APPROVED. A SEPARATE GAS PERMIT AND PLANS | | WILL BE REQUIRED FOR A CONTRACTOR TO PERFORM THE | | RELATED WORK. PROVIDE COMPLETE PLANS, APPLIANCE/ | | EQUIPMENT SPECIFICATIONS AND GAS RISER THAT REFLECT THE | | ENTIRE SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC | | SEC. 107.2.1. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | |
|
|
Review Stop |
G |
GAS REVIEW |
Rev No |
1 |
Status |
F |
Date |
2016-01-28 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-01-28 |
Time |
05:37 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-01-28 |
Time |
05:28 |
Sent To |
|
|
Notes |
2016-01-28 05:32:59 | 1) SHOW THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL | | BTU LOAD ON THE SYSTEM. IS THE FIREPLACE GAS/ IF SO, | | SHOW IT ON THE GAS PIPING RISER.REFER TO THE 2014 | | FBC-FUEL GAS SECS.401.8 THRU 402.6.1 AND TABLES 402.4 | | (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2413. | | 2)INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM ON | | THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. | | SEC. G2413.2. | | 3) INDICATE THE GAS APPLIANCE ON THE GAS RISER. | | 4) A SEPARATE PERMIT IS REQUIRED FOR THE GAS SYSTEM. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2016-01-29 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-01-29 |
Time |
02:51 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-01-21 |
Time |
13:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
N |
Date |
2016-01-28 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2016-01-28 |
Time |
14:30 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2016-01-28 |
Time |
12:23 |
Sent To |
|
|
Notes |
2016-01-28 14:31:17 | SEE 16010883 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2016-01-29 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-01-29 |
Time |
02:44 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-01-29 |
Time |
02:30 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2016-01-28 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-01-28 |
Time |
05:40 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-01-28 |
Time |
05:09 |
Sent To |
|
|
Notes |
2016-01-28 05:27:51 | 1) SHT.A.02 - THERE ARE DEMOLITION KEY NOTES DESCRIBING | | THE DEMOLITION WORK BUT THERE ARE NO CORRESPONDING | | IDENTIFICATION TAGS ON THE PLAN THAT CORRELATES TO THE | | DEMOLITION NOTES THAT REFLECT THE SCOPE OF WORK TO BE | | DONE. THE PLANS SHALL CLEARLY SHOW THE SCOPE OF WORK TO | | BE DONE. WPB AMEND. TO FBC SEC. 107.2.1. | | 2) SHOW THE LOCATION OF THE LAUNDRY ROOM ON THE | | PLANS.WPB AMEND. TO FBC SEC. 107.2.1 | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | . | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |