Plan Review Stops For Permit 16010446 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2016-01-25 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2016-01-25 |
Time |
06:59 |
Rev Time |
0.00 |
Received By |
jwitmer |
Date |
2016-01-25 |
Time |
06:26 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2016-03-23 |
|
|
Cont ID |
|
Sent By |
albarran |
Date |
2016-03-23 |
Time |
13:12 |
Rev Time |
0.00 |
Received By |
albarran |
Date |
2016-03-23 |
Time |
13:12 |
Sent To |
|
|
Notes |
2016-03-23 13:14:10 | PER THE ATTACHED DOCUMENT THE DESIGN PROFESSIONAL HAS | | AGREED TO COMPLY WITH THE MENTIONED FBC-E CODE DAYLIGHT | | ZONE REQUIREMENTS. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2016-03-22 |
|
|
Cont ID |
|
Sent By |
albarran |
Date |
2016-03-22 |
Time |
14:40 |
Rev Time |
0.00 |
Received By |
albarran |
Date |
2016-03-22 |
Time |
13:03 |
Sent To |
|
|
Notes |
2016-03-23 09:21:27 | SPOKE W/GLEN SPINA OFFICES AND THEY WILL SEND ME AN | | EMAIL ACKNOWLEDGING MY REQUIREMENTS. ONCE RECEIVED I | | WILL APPROVE THE ELECTRICAL REVIEW WITH A PROVISO | | REQUIRING DAYLIGHT ZONE CONTROL IN THESE UNITS. | 2016-03-22 14:43:07 | ALL PREVIOUSLY MENTIONED DEFICIENCIES HAVE BEEN | | SATISFACTORILY ADDRESSED, BUT I MAY HAVE OVERSEEN THE | | TWO NEW COMMENTS ON THE LIGHTING PAGE AS MENTIONED | | BELOW. | | | | 2ND ELECTRICAL REVIEW NOTES FOR PERMIT #:16010446 | | REVIEWED FOR COMPLIANCE WITH: | | 5TH EDITION FBC 2014 | | NFPA 70 2011 (NEC) | | | | CORRECTIONS REQUIRED: | | SHEET E2.1 | | 1. ROOMS 311, 314 & 318 DO NOT COMPLY WITH THE | | FBC-C405.2.2.3 DAYLIGHT ZONE CONTROLS. PLEASE SEPARATE | | FIXTURE SWITCHING TO COMPLY. | | 2. FBC-E C402.4.8 RECESSED LIGHTING. RECESSED LIGHTING | | INSTALLED IN THE BUILDING THERMAL ENVELOPE SHALL BE IC | | RATED AND BE SEALED TO LIMIT AIR LEAKAGE BETWEEN | | CONDITIONED & UNCONDITIONED SPACES. | | | | WHEN RESUBMITTING, FOR A QUICKER RETURN ON YOUR | | RE-SUBMITTAL, PLEASE PROVIDE A RESPONSE LETTER | | (NARRATIVE) ADDRESSING EACH ITEM AND THE PAGE NUMBER | | WHERE THE CORRECTIONS APPEAR ALONG WITH THE STANDARD | | CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | CORRECTED PAGES INTO THE SUBMITTAL PACKAGE. MARK VOID | | AND LEAVE THE PREVIOUSLY REVIEWED SHEETS FOR | | COMPARATIVE REVIEW. CLOUDING THE CHANGES WILL BE | | GREATLY APPRECIATED. | | | | IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO | | CONTACT ME DIRECTLY. | | | | THANK YOU, | | MIKE ALBARRAN | | ELECTRICAL PLANS EXAMINER | | PH: 561-805-6746 | | EMAIL: [email protected] | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2016-02-10 |
|
|
Cont ID |
|
Sent By |
albarran |
Date |
2016-02-10 |
Time |
16:48 |
Rev Time |
0.00 |
Received By |
albarran |
Date |
2016-02-10 |
Time |
13:34 |
Sent To |
|
|
Notes |
2016-02-10 16:50:13 | 1ST ELECTRICAL REVIEW NOTES: | | REVIEWED FOR COMPLIANCE WITH: | | FBC 2010, NEC 2008 | | | | CORRECTIONS REQUIRED: (ITEMS MARKED IN GREEN ARE ONLY | | ENERGY CONSERVATION AND CONVENIENCE SUGGESTIONS) UNIT | | DL WAS REVIEWED FIRST, BUT COMMENTS MARKED TYPICAL | | APPLY TO ENTIRE PROJECT AND MAY BE REMEDIED WITH A | | NOTE. | | SHEET E0.1 | | 1. CORRECT MISQUOTED FBC SECTIONS AS FOLLOWS: NOTE P: | | FBC-EC405.7.3.2 & NOTE Q: FBC-EC405.7.3.1 | | SHEET 2.1 | | 2. FBC-B1011.1 ADDITIONAL EXIT SIGN REQUIRED WITHIN | | THIS AREA AS THERE CAN BE NO MORE THAN 100? BETWEEN | | EXIT SIGNS. | | 3. FBC-E C405.5. INTERIOR LIGHTING POWER REQUIREMENTS. | | A BUILDING COMPLIES WITH THIS SECTION IF ITS TOTAL | | CONNECTED LIGHTING POWER CALCULATED UNDER SECTION | | C405.5.1 IS NO GREATER THAN THE INTERIOR LIGHTING POWER | | CALCULATED UNDER SECTION C405.5.2. PROVIDE A LIGHTING | | POWER DENSITY CHART TO SHOW COMPLIANCE. | | 4. FBC-EC405.5.2 INTERIOR LIGHTING POWER ALLOWANCE. THE | | TOTAL INTERIOR POWER ALLOWANCE IS DETERMINED ACCORDING | | TO THE APPLICABLE TABLES AS INDICATED IN THIS SECTION. | | SHEET E3.1 | | 5. NEC 110.16 ARC-FLASH HAZARD WARNING: ELECTRICAL | | EQUIPMENT IN OTHER THAN DWELLING UNITS LIKELY TO | | REQUIRE SERVICED WHILE ENERGIZED SHALL BE FIELD MARKED | | TO WARN AGAINST POTENTIAL ARC-FAULT HAZARDS. | | | | WHEN RESUBMITTING, FOR A QUICKER RETURN ON YOUR | | RE-SUBMITTAL, PLEASE PROVIDE A RESPONSE LETTER | | (NARRATIVE) ADDRESSING EACH ITEM AND THE PAGE NUMBER | | WHERE THE CORRECTIONS APPEAR ALONG WITH THE STANDARD | | CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT | | CORRECTED PAGES INTO THE SUBMITTAL PACKAGE. MARK VOID | | AND LEAVE THE PREVIOUSLY REVIEWED SHEETS FOR | | COMPARATIVE REVIEW. CLOUDING THE CHANGES WILL BE | | GREATLY APPRECIATED. | | | | IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO | | CONTACT ME DIRECTLY. | | | | THANK YOU, | | MIKE ALBARRAN | | ELECTRICAL PLANS EXAMINER | | PH: 561-805-6746 | | EMAIL: [email protected] | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2016-01-20 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2016-01-20 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2016-01-20 |
Time |
15:41 |
Sent To |
|
|
Notes |
2016-01-20 16:15:36 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | INSPECTION. | | | | 1. THE NATURE OF THE REMODEL REQUIRES AN EVALUATION OF | | THE FIRE ALARM AND SPRINKLER SYSTEM FOR CODE COVERAGE | | AND COMPLIANCE. ANY REMOVAL AND/OR CONSTRUCTION OF | | WALLS REQUIRE AN EVALUATION. | | | | 2. THE LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR FIRE | | SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT THE | | CONSTRUCTION PERIOD. | | | | 3. ANY AND ALL WORK ON THE FIRE ALARM AND FIRE | | SPRINKLER SYSTEMS SHALL BE DONE UNDER SEPARATE SHOP | | DRAWINGS AND BY CERTIFIED LIFE SAFETY CONTRACTORS. | | | | 4. ANY TIME THAT WORK ON THE LIFE SAFETY SYSTEMS, | | SPRINKLER AND/OR FIRE ALARM, EXCEEDS 4 HOURS, A FIRE | | WATCH SHALL BE IMPLEMENTED AND MAINTAINED UNTIL FULL | | AND COMPLETE PROTECTION IS RETURNED. | | | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2016-03-23 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2016-03-23 |
Time |
10:28 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2016-03-08 |
Time |
09:49 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2016-02-11 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2016-02-11 |
Time |
09:27 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2016-01-19 |
Time |
11:36 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2016-03-23 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2016-03-23 |
Time |
10:23 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2016-03-23 |
Time |
10:21 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2016-02-11 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2016-02-04 |
Time |
09:27 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2016-02-04 |
Time |
16:37 |
Sent To |
|
|
Notes |
2016-02-04 16:42:35 | 1ST REVIEW: FBC 2014 MECHANICAL | | PERMIT #16010446 | | 2/4/16 | | | | 1) THE NEW VAV-1 BOX MUST BE EQUIPPED WITH HEAT UNLESS | | IT IS BEING PROVIDED BY ANOTHER SOURCE- SEE SECTION | | 309.1. | | 2) FIRE DAMPERS APPEAR TO BE MISSING FOR THE DUCTS | | PENETRATING THROUGH THE RATED CORRIDOR/WORK STATIONS | | ROOM WALL. | | 3) PROVIDE AN INSTALLATION DETAIL FOR THE NEW VAV. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2016-01-24 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-01-24 |
Time |
04:07 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-01-24 |
Time |
03:49 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2016-03-28 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2016-03-28 |
Time |
09:46 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2016-03-28 |
Time |
09:46 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2016-03-24 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2016-03-24 |
Time |
08:38 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2016-03-24 |
Time |
08:38 |
Sent To |
|
|
Notes |
2016-03-24 08:43:39 | 1ST REVIEW: FBC 2014 5TH | | | | THE MEP SHEETS ARE NOT DIGITALLY SIGNED. SUBMIT | | DIGITALLY SIGNED COPIES OR HARD COPIES. | | | | STEVEN KENNEDY, CBO | | CHIEF PLANS EXAMINER | | (561) 805-6710 | | [email protected] | | |
|
|