Plan Review Stops For Permit 16010361 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2017-03-14 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-03-14 |
Time |
08:41 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-03-14 |
Time |
08:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2017-01-23 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-01-23 |
Time |
17:14 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-01-23 |
Time |
17:14 |
Sent To |
|
|
Notes |
2017-01-23 17:15:18 | ****CORRECTIONS**** | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 [email protected] | | FBC FLORIDA BUILDING CODE 5TH EDITION | | | | 1. REVISE PLAN TO PROVIDE THE FOLLOWING INFORMATION: | | | | TOTAL NUMBER OF PARKING SPACES | | NUMBER OF ACCESSIBLE SPACES | | LOCATION OF ACCESSIBLE ENTRANCES | | | | | | SEE FBC 2014 ACCESSIBLITY 208.2 (PARKING SPACES), 502 | | (PARKING SPACES), 206 (ACCESSIBLE ROUTE). | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2016-12-14 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-12-14 |
Time |
16:45 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-12-14 |
Time |
16:45 |
Sent To |
|
|
Notes |
2016-12-14 16:47:49 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | 1. CLARIFY SCOPE. THE PERMIT APPLICATION HAS NO VALUE, | | AND THE DESCRIPTION STATES THAT STRIPING WILL BE DONE | | UNDER SEPARATE PERMIT. THE PARKING LOT STRIPING WAS NOT | | REVIEWED. | | | | THE ENGINEER'S RESPONSE LETTER STATES THAT MULTIPLE | | SHEETS WERE SUBMITTED FOR THE PAVING AND STRIPING. | | CONFIRM THAT IT IS UNDERSTOOD THAT STRIPING WILL | | REQUIRE A SEPARATE PERMIT, FEES, AND REVIEW. | | | | 2. PROVIDE A VALUE FOR THE SCOPE OF THIS WORK. FBC 109. | | THIS COMMENT WAS PREVIOUSLY IN THE SIGNATURE REVIEW | | COMMENT LIST (WHICH HAS NOW PASSED). | | | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2016-01-22 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-01-22 |
Time |
18:08 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-01-22 |
Time |
18:08 |
Sent To |
|
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
4 |
Status |
P |
Date |
2017-03-21 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-03-21 |
Time |
16:47 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-03-21 |
Time |
16:47 |
Sent To |
|
|
Notes |
2017-03-21 16:48:18 | THIS REVIEW WAS PASSED BY ENGINEERING. THE CHANGE | | SUBSEQUENT TO ENGINEERING REVIEW WAS TO ADD STRIPING TO | | THE SCOPE. APPLICANT HAS A SEPARATE ENGINEERING PERMIT. | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
3 |
Status |
F |
Date |
2017-03-07 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-03-07 |
Time |
10:18 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-03-07 |
Time |
10:17 |
Sent To |
|
|
Notes |
2017-03-07 10:17:25 | RESTAMP REQUIRED PRIOR TO REVISION ISSUANCE | | RESTAMP WILL BE DONE ON NEXT REVIEW | | | | | 2017-01-31 16:23:03 | RESTAMP NEEDED |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
P |
Date |
2016-12-15 |
|
|
Cont ID |
|
Sent By |
mgonzale |
Date |
2016-12-15 |
Time |
|
Rev Time |
1.00 |
Received By |
mgonzale |
Date |
2016-12-15 |
Time |
|
Sent To |
I |
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
N |
Date |
2016-03-17 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2016-03-17 |
Time |
08:00 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2016-03-17 |
Time |
08:00 |
Sent To |
|
|
Notes |
2016-03-16 17:06:21 | ENGINEERING REVIEW TO BE PERFORMED ON 2ND CYCLE |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2017-03-22 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2017-03-22 |
Time |
15:52 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2017-03-07 |
Time |
16:21 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2017-03-07 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-03-07 |
Time |
10:23 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-01-12 |
Time |
08:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2016-12-15 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2016-12-15 |
Time |
16:09 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2016-12-14 |
Time |
10:34 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2016-11-28 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-11-28 |
Time |
12:08 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-10-24 |
Time |
10:31 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2016-03-16 |
|
|
Cont ID |
|
Sent By |
cpuell |
Date |
2016-03-16 |
Time |
17:06 |
Rev Time |
0.00 |
Received By |
cpuell |
Date |
2016-01-18 |
Time |
08:56 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2017-03-14 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2017-03-14 |
Time |
08:44 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2017-03-14 |
Time |
08:44 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2016-12-14 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-12-14 |
Time |
16:48 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-12-14 |
Time |
16:48 |
Sent To |
|
|
Notes |
2016-12-14 16:48:26 | SIGNATURE VERIFIED FOR REVIEW CYCLE #2 | | | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2016-11-28 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-11-28 |
Time |
12:06 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-11-28 |
Time |
12:06 |
Sent To |
|
|
Notes |
2016-11-28 12:08:50 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | 1. THE PLANS SUBMITTED ARE NOT SIGNED AND SEALED. | | | | EITHER PROVIDE SIGNED AND SEALED PAPER PLANS, OR | | PROVIDE DIGITALLY SIGNED AND SEALED PLANS EITHER VIA | | EMAIL [email protected] OR BY UPLOADING INTO PROJECTDOX. | | | | 2. PROVIDE A VALUE FOR THIS SCOPE OF WORK. | | | | | | | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
P |
Date |
2017-01-31 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2017-01-31 |
Time |
16:25 |
Rev Time |
0.50 |
Received By |
eschneid |
Date |
2017-01-30 |
Time |
16:44 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2016-11-28 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2016-11-28 |
Time |
11:28 |
Rev Time |
0.50 |
Received By |
eschneid |
Date |
2016-11-28 |
Time |
10:58 |
Sent To |
|
|
Notes |
2016-11-28 11:28:44 | REMOVE TEMPORARY DRIVE PRIOR TO C.O. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2016-02-24 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2016-02-24 |
Time |
16:34 |
Rev Time |
1.00 |
Received By |
eschneid |
Date |
2016-02-24 |
Time |
16:34 |
Sent To |
|
|
Notes |
2016-02-24 16:39:45 | FAILED | | | | PROVIDE WRITTEN RESPONSES. | | | | 1) PROVIDE THE INSIDE CURB DIMENSION OF THE LANDSCAPE | | ISLANDS IN THE PARKING LOT. THESE SHALL BE A MINIMUM OF | | FIVE (5) FEET IN WIDTH. | | | | 2) WHY ARE MULTIPLE COPIES OF THE SAME PLAN SHEET | | SUBMITTED? | | | | 3) IS THIS PERMIT INTENDED TO INCLUDE THE TEMPORARY | | ACCESS DRIVE? THE DESCRIPTION OF WORK ON THE PERMIT | | DOES NOT INCLUDE IT, YET IT IS INCLUDED ON THE PLANS. | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. | | |
|
|