Plan Review Details - Permit 15120854
Plan Review Stops For Permit 15120854
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2016-01-05 Cont ID  
Sent By aclange Date 2016-01-05 Time 17:29 Rev Time 0.00
Received By aclange Date 2016-01-05 Time 17:29 Sent To E
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2016-01-06 Cont ID  
Sent By albarran Date 2016-01-06 Time 10:02 Rev Time 0.00
Received By albarran Date 2016-01-06 Time 09:25 Sent To I
Notes
2016-01-06 10:02:50IMPORTANT NOTICE: FOR FINAL ELECTRICAL INSPECTION,
 REGARDLESS IF THIS SIGN WAS CONNECTED TO NEW OR
 EXISTING POWER, FULL COMPLIANCE WITH 2011 NEC & 2014
 FBC ENERGY CONSERVATION SECTION C405.2.4 WILL BE
 REQUIRED & VERIFIED.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-01-06 Cont ID  
Sent By albarran Date 2016-01-06 Time 10:04 Rev Time 0.00
Received By albarran Date 2015-12-29 Time 13:58 Sent To Z
Notes
2016-01-06 10:05:451/6/16 PASSED ALL TRADE REVIEWS AND READY FOR ISSUANCE.
 CONTRACTOR NOTIFIED VIA EMAIL. SENT TO SMALL READY BIN
 "I". MA

Review Stop Z ZONING
Rev No 1 Status P Date 2016-01-05 Cont ID  
Sent By albarran Date 2016-01-06 Time 10:05 Rev Time 0.00
Received By sgraham Date 2016-01-05 Time 09:33 Sent To B
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved