Plan Review Details - Permit 15120234
Plan Review Stops For Permit 15120234
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2016-02-20 Cont ID  
Sent By mGONZALE Date 2016-02-20 Time   Rev Time 1.00
Received By mgonzale Date 2016-02-20 Time   Sent To P
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2015-12-16 Cont ID  
Sent By Mgonzale Date 2015-12-16 Time   Rev Time 1.00
Received By mgonzale Date 2015-12-16 Time   Sent To I
Notes
2015-12-16 21:50:46MUST PROVIDE WASTEWATER SAMPLING PORT, DOWNSTREAM OF
 OIL/SAND SEPARATOR.
  
 MANUEL J GONZALEZ
 PROJECT COORDINATOR - ENGINEERING SERVICES
 [email protected]
 (561) 319-2695
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-02-22 Cont ID  
Sent By tklarge Date 2016-02-22 Time 14:27 Rev Time 0.00
Received By tklarge Date 2016-01-21 Time 09:16 Sent To  
Notes
2016-01-22 09:17:01ROUTED TO ENGINEERING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-12-17 Cont ID  
Sent By mgonzale Date 2015-12-16 Time 21:54 Rev Time 0.00
Received By lmarchan Date 2015-12-07 Time 10:36 Sent To  
Notes
2015-12-08 10:37:21PLUMB -$5000

Review Stop P PLUMBING
Rev No 2 Status P Date 2016-02-22 Cont ID  
Sent By tklarge Date 2016-02-22 Time 14:27 Rev Time 0.00
Received By tklarge Date 2016-02-22 Time 14:27 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2015-12-09 Cont ID  
Sent By tklarge Date 2015-12-09 Time 06:09 Rev Time 0.00
Received By tklarge Date 2015-12-09 Time 05:19 Sent To  
Notes
2015-12-09 06:07:441) THE OIL SEPARATOR DOES NOT CCOMPLY WITH THE 2014
 FBC-PLUMBING, SECS. 1003.4.1, 1003.4.2.1., 1003.4.2.2.
 - THE OIL SEPARATOR SHALL HAVE A DEPTH OF NOT LESS THAN
 2 FT. BELOW THE INVERT OF THE DISCHARGE DRAIN.THE
 OUTLET OPENING OF THE SEPARATOR SHALL HAVE NOT LESS
 THAN AN 18 INCH WATER SEAL.
 2) THE OIL SEPARATORR SHALL HAVE A CAPACITY OF NOT LESS
 THAN 6 CUBIC FEET FOR THE FIRST 100 SQUARE FEET OF AREA
 TO BE DRAINED, PLUS 1 CUBIC FOOT FOR EACH ADDITIONAL
 100 SQUARE FEET OF AREA TO BE DRAINED INTO THE
 SEPARATOR.
 3) SUBMIT THE TOTAL SQUARE FOOT AREA THAT IS GOING TO
 BE DRAINED BY THE TRENCH DRAIN. WPB AMEND. TO FBC SEC.
 107.2.1.
 4) SUBMIT FACTORY SIZING CALCULATIONS FOR THE OIL
 SEPARATOR DONE BY SCHIER. CONTACT LEE SCHNEEWEISS AT
 1-800- 538-4792.
 5) THE DETAIL OF THE OS-25 WITH RISER SHOWS A 3 INCH
 PIPE SIZE BUT THE SPECIFICATIONS LISTED AT THE BOTTOM
 OF THE PAGE NOTES A 4 INCH INLET & OUTLET. CLARIFY.
 6) A SAMPLING PORT IS REQUIRED ON THE OUTLET OF THE
 SEPARATOR. WPB AMEND. TO FBC SEC. 107.2.1. I WOULD
 SUGGEST SPEAKING TO THE SCHIER REPRESENTATIVE REGARDING
 THIS ITEM.
 7) SHOW THE REQUIRED CELANOUTS ON THE INTERCEPTOR. WPB
 AMEND. TO FBC SEC. 107.2.1.
 8) SHOW THE SIZE OF THE PIPE ENTERING AND LEAVING THE
 INTERCEPTOR ON THE PLAN VIEW DRAWING.
 9) SUBMIT 2 COPIES OF INSTALLATION MANUAL FROM SCHIER
 FOR THE PROPERLY SIZED UNIT. WPB AMEND. TO FBC SEC.
 107.2.1.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  
  