Review Stop G GAS REVIEW
Rev No 3 Status P Date 2015-12-29 Cont ID  
Sent By rbrown Date 2015-12-29 Time 12:21 Rev Time 0.00
Received By rbrown Date 2015-12-29 Time 12:21 Sent To  
Notes
2015-12-29 12:25:36TIM LARGE CONFIRMED THAT CONTRACTOR REMOVED GAS DRYER
 FROM SCOPE OF WORK AS STATED ON RESUBMITTAL FORM.

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2015-12-23 Cont ID  
Sent By tklarge Date 2015-12-23 Time 04:09 Rev Time 0.00
Received By tklarge Date 2015-12-23 Time 03:54 Sent To  
Notes
2015-12-23 04:09:031) THE PERMIT APPLICATION INDICATES A GAS DRYER IS
 BEING INSTALLED BUT IT IS NOT SHOWN ON THE GAS DRAWING.
 CLARIFY.
 2) SUBMIT 2 COPIES OF THE DRYER SPECS IF IT IS BEING
 INSTALLED.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2015-12-04 Cont ID  
Sent By tklarge Date 2015-12-04 Time 06:34 Rev Time 0.00
Received By tklarge Date 2015-12-04 Time 06:05 Sent To  
Notes
2015-12-04 06:13:041) THE SUBMITTED GAS PLAN IS DONE IN PENCIL AND THERE
 IS ONLY ONE COPY OF THE PLAN. PLANS IN PENCIL ARE
 UNACCEPTABLE. TWO SETS OF PLANS ARE REQUIRED PER THE
 WPB AMEND. TO FBC SEC. 107.1.
 2) THE GAS DRAWING SHOWS A RANGE BUT THE PERMIT
 APPLICATION DOES NOT SHOW THE RANGE UNDER THE
 DESCRIPTION OF WORK. ADD THE RANGE ONTO THE PERMIT
 APPLICATION. WPB AMEND. TO FBC SEC.105.3.
 3) SUBMIT 2 COPIES OF SPECIFICATIONS FOR EACH GAS
 APPLIANCE THAT SHOWS THE APPLIANCE IS LISTED AND
 LABELED PER 2014 FBC -FUEL GAS SEC. 304.3. ONLY 1 COPY
 HAS BEEN SUBMITTED.WPB AMEND. TO FBC SEC. 107.1.
 4) INDICATE ON THE PLAN THE SPECIFIC GAS SIZING TABLES
 USED TO SIZE THE SYSTEM. WPB AMEND. TO FBC SEC.
 107.2.1.
 5) IT APPEARS THAT THE PE LINE TO THE TANKLESS WATER
 HEATER IS UNDERSIZED PER TABLE 402.4 (21) IF THAT IS
 THE TABLE YOU ARE USING.THE MAXIMUM BTU LOAD ALLOWED ON
 A 3/4" PE LINE AT 50 FT. IS 169,000. THIS LINE NEEDS TO
 BE A MINIMUM OF 1 INCH.
 6) SIZE THE 2 FOOT SECTION OF PIPE THAT SUPPLIES THE
 DRYER AND THE RANGE.
 7) SIZE THE SECTION OF PIPE COMING OFF THE METER.
 8) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE DRYER PER
 2014 FBC-FUEL GAS SEC.304.1 & 614.5.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-12-23 Cont ID  
Sent By tklarge Date 2015-12-23 Time 04:09 Rev Time 0.00
Received By tklarge Date 2015-12-22 Time 13:40 Sent To  
Notes
2015-12-22 13:40:54RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-12-29 Cont ID  
Sent By andrian Date 2015-12-29 Time 12:11 Rev Time 0.00
Received By andrian Date 2015-12-01 Time 17:22 Sent To  
Notes
2015-12-01 17:22:35PLUMB -$5000