Plan Review Details - Permit 15120030
Plan Review Stops For Permit 15120030
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2015-12-18 Cont ID  
Sent By rmcdouga Date 2015-12-18 Time 14:02 Rev Time 0.00
Received By rmcdouga Date 2015-12-18 Time 14:02 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-12-08 Cont ID  
Sent By rmcdouga Date 2015-12-08 Time 10:29 Rev Time 0.00
Received By rmcdouga Date 2015-12-08 Time 10:20 Sent To  
Notes
2015-12-08 10:36:25PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE PROPOSED POOL IS LOCATED IN AN AREA THAT IS
 KNOWN TO HAVE QUESTIONABLE SOILS. SUBMIT A SUB-SURFACE
 SOIL TEST REPORT PER FBC-R401.4.
  
 2) THE POOL PERMIT CAN NOT BE ISSUED UNTIL AN
 APPLICATION FOR THE POOL ELECTRIC SUB PERMIT HAS BEEN
 SUBMITTED AND APPROVED.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2015-12-18 Cont ID  
Sent By rmcdouga Date 2015-12-18 Time 14:02 Rev Time 0.00
Received By rmcdouga Date 2015-12-18 Time 14:02 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2015-12-08 Cont ID  
Sent By rmcdouga Date 2015-12-08 Time 10:29 Rev Time 0.00
Received By rmcdouga Date 2015-12-08 Time 10:20 Sent To  
Notes
2015-12-08 12:39:17PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY ELECTRIC
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SPECIFY THE SIZE OF THE EXISTING ELECTRICAL PANEL.
 SUBMIT TWO COPIES OF A PANEL SCHEDULE WITH LOAD
 CALCULATIONS TO SHOW THAT THE EXISTING PANEL IS
 ADEQUATE FOR THE ADDITION LOADS OF THE ELECTRIC POOL
 HEATER AND OTHER POOL EQUIPMENT. FBC 107.2.1
  
 2) SUBMIT TWO SETS OF MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATION INSTRUCTIONS FOR THE POOL HEAT PUMP. FBC
 107.2.1

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2015-12-03 Cont ID  
Sent By tklarge Date 2015-12-03 Time 06:34 Rev Time 0.00
Received By tklarge Date 2015-12-03 Time 06:34 Sent To  
Notes
2015-12-03 06:35:40THERE IS NO GAS INSTALLATION ASSOCIATED WITH THIS
 PERMIT.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-12-18 Cont ID  
Sent By rmcdouga Date 2015-12-18 Time 14:02 Rev Time 0.00
Received By rmcdouga Date 2015-12-16 Time 11:08 Sent To  
Notes
2015-12-17 11:09:05RESUB ROUTED TO RMCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-12-08 Cont ID  
Sent By rmcdouga Date 2015-12-08 Time 10:29 Rev Time 0.00
Received By rmcdouga Date 2015-12-01 Time 17:02 Sent To Z
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2015-12-03 Cont ID  
Sent By tklarge Date 2015-12-03 Time 06:33 Rev Time 0.00
Received By tklarge Date 2015-12-03 Time 06:08 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2015-12-02 Cont ID  
Sent By rmcdouga Date 2015-12-08 Time 10:29 Rev Time 0.00
Received By sgraham Date 2015-12-02 Time 11:20 Sent To B
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved