Plan Review Stops For Permit 15110006 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2015-11-04 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2015-11-04 |
Time |
11:00 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2015-11-04 |
Time |
11:00 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2015-11-02 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2015-11-02 |
Time |
11:02 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2015-11-02 |
Time |
11:02 |
Sent To |
|
|
Notes |
2015-11-02 11:12:35 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | 1. MIAMIDADE NOA SHOULD INCLUDE ALL OF THE FIRST PAGES | | WHICH DESCRIBES THE COMPONENTS OF ASSEMBLIES (TABLES 1 | | AND 2, EVIDENCE, PAGES 1 THROUGH 9), THE ASSEMBLY | | PROPOSED (PAGE 11 WAS SUBMITTED BUT THIS ASSEMBLY IS | | TWO PAGES), AND THE LAST PAGE OF THE NOA. PROVIDE ALL | | APPLICABLE PAGES. | | | | 2. SEE PAGE 33, GENERAL LIMITATION #7, ENGINEERING | | REQUIRED FOR ENHANCED FASTENING. | | | | FBC 5TH ED. RESIDENTIAL 301 | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2015-11-02 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2015-11-02 |
Time |
11:12 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2015-11-02 |
Time |
10:12 |
Sent To |
|
|
Notes |
|
|
|