Plan Review Details - Permit 15100135
Plan Review Stops For Permit 15100135
Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-10-27 Cont ID  
Sent By ccole Date 2015-10-27 Time 08:59 Rev Time 0.00
Received By ccole Date 2015-10-26 Time 14:50 Sent To  
Notes
2015-10-26 14:50:27RESUB ROUTED TO CCOLE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-10-26 Cont ID  
Sent By lmarchan Date 2015-10-26 Time 14:50 Rev Time 0.00
Received By lmarchan Date 2015-10-21 Time 10:39 Sent To M
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2015-10-27 Cont ID  
Sent By ccole Date 2015-10-27 Time 08:59 Rev Time 0.00
Received By ccole Date 2015-10-27 Time 08:59 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2015-10-21 Cont ID  
Sent By lmarchan Date 2015-10-26 Time 14:50 Rev Time 0.00
Received By ccole Date 2015-10-21 Time 12:47 Sent To  
Notes
2015-10-21 12:56:282ND REVIEW: FBC 2014 MECHANICAL
 PERMIT #15100135
 10/21/15
  
 1) THE ENERGY EFFICIENCY COMPLIANCE FORM R402-2014 IS
 NOT FILLED OUT COMPLETELY. PLEASE COMPLETE TABLES R402A
 AND R402 B.
 2) AS PREVIOUSLY REQUESTED IN THE 1ST REVIEW, PROVIDE A
 RETURN AIR SYSTEM: INDICATE HOW AIR SUPPLIED TO THE
 BEDROOMS, AND OTHER ROOMS OR SPACES WILL BE RETURNED TO
 THE AIR HANDLER.
 3) THE SUPPLY DUCT SIZES APPEAR TO BE TOO SMALL: THE 6"
 SHOULD BE 8", THE 8" SHOULD BE 10". PLEASE INDICATE HOW
 THE DUCTS WERE SIZED.
 4) AS PREVIOUSLY REQUESTED, PROVIDE STRUCTURAL DETAILS
 FOR INSTALLATION OF THE CONDENSER PAD, AND ENGINEERED
 WIND LOAD TIE DOWN DETAILS FOR MOUNTING THE CONDENSER
 TO THE PAD.
 5) AS PREVIOUSLY REQUESTED, CONTRACTOR PLANS REQUIRE A
 SIGNATURE.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2015-10-14 Cont ID  
Sent By ccole Date 2015-10-14 Time 11:59 Rev Time 0.00
Received By ccole Date 2015-10-14 Time 11:59 Sent To  
Notes
2015-10-14 12:05:251ST REVIEW: FBC 2014 MECHANICAL
 PERMIT #15100135
 10/14/15
  
 1) THE PERMIT APPLICATION WORK DESCRIPTION IS
 INCORRECT: THIS IS NOT A CHANGE-OUT, IT IS A NEW AC
 SYSTEM IN A PREVIOUSLY UNCONDITIONED BUILDING. PLEASE
 CHANGE THE DESCRIPTION ON THE APPLICATION.
 2) REFER TO SECTION R101.4.5 FBC-14 ENERGY
 CONSERVATION: CHANGE IN SPACE CONDITIONING.
 ANY NONCONDITIONED SPACE THAT IS ALTERED TO BECOME
 CONDITIONED SPACE SHALL BE REQUIRED TO BE BROUGHT INTO
 FULL COMPLIANCE WITH THIS CODE.
 PLEASE PROVIDE TWO COPIES OF ENERGY CALCULATIONS USING
 EITHER THE PRESCRIPTIVE OR PERFORMANCE COMPLIANCE PATH-
 SEE TABLE R101.5.1 FOR FORMS.
 3) REFER TO SECTION 403.6.1 AND PROVIDE AC COOLING AND
 HEATING CALCULATIONS IN ACCORDANCE WITH ACCA MANUAL J.
 4) THE SUBMITTED AC PLAN DOES NOT CLEARLY SHOW WHERE
 THE NEW AIR HANDLER IS TO BE LOCATED- PLEASE CLARIFY,
 AND NOTE THAT AIR HANDLERS SHALL NOT BE INSTALLED IN
 THE ATTIC WHEN A PLAN IS BROUGHT INTO COMPLIANCE USING
 THE PRESCRIPTIVE METHOD- SEE R402.
 5) PROVIDE STRUCTURAL DETAILS FOR INSTALLATION OF THE
 CONDENSER PAD, AND WIND LOAD TIE DOWN DETAILS FOR
 ANCHORING THE CONDENSER TO THE PAD- REFER TO SECTIONS
 M1305.1.4.1 AND M1401.4 FBC-14 RESIDENTIAL.
 6) IDENTIFY ALL ROOMS ON THE LAYOUT PLAN AND SHOW A
 MEANS OF RETURN AIR FROM REQUIRED ROOMS AND SPACES-
 REFER TO SECTION M1602 FBC-14 RESIDENTIAL.
 7) AN ELECTRICAL PLAN AND LOAD CALCULATIONS IS
 REQUIRED.
 8) PLEASE NOTE THAT ALL CONTRACTOR PLANS MUST BE SIGNED
 BY THE CONTRACTOR THAT DREW THEM- SECTIO N 107.2.1 WPB
 AMENDMENTS TO THE FBC-10 BUILDING.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  