Plan Review Stops For Permit 15091022 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2015-09-24 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2015-09-24 |
Time |
09:41 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2015-09-24 |
Time |
09:41 |
Sent To |
|
|
Notes |
2015-09-24 10:44:21 | ****PROVISO**** | | ****ISSUED AT CONTRACTOR'S RISK**** | | | | EMERGENCY MEANS OF ESCAPE FBC R310.4 REQUIRED: | | | | THE MEANS OF ESCAPE SHALL BE WITHIN THE FIRST FLOOR OF | | THE DWELLING OR DWELLING UNIT AND SHALL NOT BE LOCATED | | WITHIN A GARAGE WITHOUT A SIDE-HINGED DOOR LEADING | | DIRECTLY TO THE EXTERIOR. OCCUPANTS IN ANY PART OF THE | | DWELLING OR DWELLING UNIT SHALL BE ABLE TO ACCESS THE | | MEANS OF ESCAPE WITHOUT PASSING THROUGH A LOCKABLE DOOR | | NOT UNDER THEIR CONTROL. | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2015-09-24 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2015-09-24 |
Time |
10:44 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2015-09-23 |
Time |
14:21 |
Sent To |
|
|
Notes |
2015-09-23 14:21:19 | BLDG <5K |
|
|
|