Plan Review Details - Permit 15090079
Plan Review Stops For Permit 15090079
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2015-09-23 Cont ID  
Sent By jwitmer Date 2015-09-23 Time 16:55 Rev Time  
Received By jwitmer Date 2015-09-23 Time 16:23 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2015-11-09 Cont ID  
Sent By albarran Date 2015-11-09 Time 16:52 Rev Time 0.00
Received By albarran Date 2015-11-09 Time 15:52 Sent To I
Notes
2015-11-09 16:57:09ALMOST ALL PREVIOUSLY MENTIONED DEFICIENCIES HAVE BEEN
 SATISFACTORILY ADDRESSED. THOSE THAT HAVE NOT HAVE BEEN
 MENTIONED TO THE DESIGN PROFESSIONAL TO AVOID SURPRISES
 IN THE FIELD. THEY ARE:
 INCORRECT CODE MENTIONED ON THE PLANS. THIS WORK SHALL
 COMPLY WITH THE 2011 EDITION OF THE NEC.
 MANDATORY SWITCHING REQUIREMENTS OF THE FBC-E SHALL BE
 COMPLIED WITH
 RECESSED LIGHTING SHALL BE SEALED TO LIMIT THE TRANSFER
 OF AIR BETWEEN CONDITIONED AND NON CONDITIONED SPACE.

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2015-11-05 Cont ID  
Sent By albarran Date 2015-11-05 Time 13:19 Rev Time 0.00
Received By albarran Date 2015-11-05 Time 12:54 Sent To M
Notes
2015-11-05 14:01:06APPLICANT ERRONEOUSLY SUBMITTED SHEETS FOR JOB PERMIT
 15081103
 .
  

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2015-11-03 Cont ID  
Sent By albarran Date 2015-11-03 Time 15:10 Rev Time 0.00
Received By albarran Date 2015-11-03 Time 13:48 Sent To I
Notes
2015-11-03 15:10:55THOUGH THESE DRAWINGS WERE ONCE BEFORE REVIEWED. THE
 FAILURE TO PROVIDE A NARRATIVE PROMPTED ME TO CONDUCT A
 COMPLETE REVIEW OF THE PLANS FOR A SECOND TIME.
 THE PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH THE
 2011 EDITION OF THE NEC, (NATIONAL ELECTRICAL CODE);
 THE 5TH EDITION OF THE FBC, (FLORIDA BUILDING CODE) AS
 APPLICABLE AND BELOW ARE THE DEFICIENCIES NOTED.
  
 1. THE CODE ANALYSIS BOX IS REFERENCING STANDARDS FROM
 THE 2010 FBC, NO LONGER IN EFFECT. THE APPLICABLE CODE
 TO WHICH YOU SHALL CONFORM IS AS MENTIONED ABOVE.
 2. I NOTICE THAT THE FIXTURE SCHEDULE INDICATES THE USE
 OF RECESSED LUMINARIES WITHOUT MENTIONING THE
 REQUIREMENTS OF FBC-ENERGY CONSERVATION SECTION
 402.4.8, WHICH REQUIRES THAT ALL RECESSED LIGHTING BE
 IC RATED AND SEALED TO PREVENT AIR LEAKAGE FROM THE
 CONDITIONED AIR SPACE INTO THE NON-CONDITIONED AIR
 SPACE.
 3. YOU SHALL SUBMIT LIGHT DENSITY ALLOWANCE
 CALCULATIONS AS INDICATED IN FBC-E SECTIONS 405.5.
 4. NEC 600.5 REQUIRES THAT THERE BE A DEDICATED SIGN
 OUTLET AT EVERY PEDESTRIAN ENTRY, FOR EVERY COMMERCIAL
 OCCUPANCY.
  
 WHEN RESUBMITTING, FOR A QUICKER RETURN ON YOUR
 RE-SUBMITTAL, YOU ARE REQUIRED TO PROVIDE A RESPONSE
 LETTER (NARRATIVE) ADDRESSING EACH ITEM ALONG WITH THE
 STANDARD CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE
 INSERT CORRECTED PAGES INTO THE SUBMITTAL AND LEAVE THE
 PREVIOUSLY REVIEWED SHEETS FOR COMPARISON.
 CLOUDING THE CHANGES WILL BE GREATLY APPRECIATED.
  
 IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO
 CONTACT ME DIRECTLY.
  
 THANK YOU,
 MIKE ALBARRAN
 ELECTRICAL PLANS EXAMINER
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2015-10-01 Cont ID  
Sent By albarran Date 2015-10-01 Time 11:58 Rev Time 0.00
Received By albarran Date 2015-10-01 Time 10:37 Sent To I
Notes
2015-10-01 12:32:26PLEASE NOTE THAT I, MIKE ALBARRAN, ELECTRICAL PLANS
 EXAMINER HAVE COMPLETED THE ELECTRICAL REVIEW OF THE
 ABOVE MENTIONED JOB. BELOW ARE THE COMMENTS WITH
 REGARDS TO THE REQUIRED CORRECTIONS. THE PLANS SHALL BE
 REVISED TO ADDRESS FOLLOWING ITEMS; ONCE CORRECTED
 SHALL BE RESUBMITTED FOR ANOTHER REVIEW.
  
 1. GENERAL LIGHTING NOTES #6 QUOTED A SECTION OF THE
 FBC THAT HAS NO BEARING TO THIS JOB.
 2. GENERAL LIGHTING NOTES #7 QUOTED AN INCORRECT CODE.
 THIS JOB IS GOVERNED BY THE 2011 EDITION OF THE NEC.
 3. ALL LIGHTING SHALL COMPLY WITH 5TH EDITION
 FBC-ENERGY CONSERVATION 2014 SECTION C405.
 A) YOU SHALL PROVIDE A LIGHT DENSITY ALLOWANCE CHART
 SHOWING LIGHTING COMPLIANCE.
 B) YOU SHALL PROVIDE A LIGHTING DIAGRAM
 C) YOUR FEEDERS SHALL BE DESIGNED FOR A MAXIMUM 2%
 VOLTAGE DROP & BRANCH CIRCUITS FOR NO MORE THAN 3% VD.
 4. EXIT LIGHTS AS REQUIRED BY FBC SECTION 1011 SHALL BE
 INDICATED ON DRAWINGS.
 5. GENERAL ELECTRICAL NOTES #6 AGAIN QUOTED THE 2008
 NEC AND NOT THE 2011.
 6. YOU SHALL PROVIDE LOAD CALCS IN ACCORDANCE WITH NEC
 220.16.
 7. YOU SHALL SUBMIT A SITE SPECIFIC ELECTRICAL RISER
 DIAGRAM INDICATING THE CONDUCTOR SIZING FOR VOLTAGE
 DROP ALLOWANCES AND THE LOCATION OF ALL PANELS
 ASSOCIATED WITH THE SITE.
 8. A CIRCUIT DIRECTORY AS REQUIRED BY NEC 408.4.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND LEAVE THE
 PREVIOUSLY REVIEWED SHEETS.
  
 IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO
 CONTACT ME DIRECTLY.
  
 THANK YOU
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2015-09-08 Cont ID  
Sent By Stallwor Date 2015-09-08 Time   Rev Time  
Received By fstal Date 2015-09-08 Time   Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2015-11-09 Cont ID  
Sent By albarran Date 2015-11-09 Time 17:05 Rev Time 0.00
Received By albarran Date 2015-11-09 Time 14:53 Sent To  
Notes
2015-11-09 14:54:23RE-SUBMITTAL FORM SUBMITTED WITH CORRECT DRAWINGS. SENT
 TO MIKE ALBARRAN FOR ELECTRICAL REVIEW. JG.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-11-05 Cont ID  
Sent By skennedy Date 2015-11-05 Time 14:16 Rev Time 0.00
Received By skennedy Date 2015-11-05 Time 11:30 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-11-03 Cont ID  
Sent By albarran Date 2015-11-03 Time 15:11 Rev Time 0.00
Received By albarran Date 2015-10-27 Time 09:44 Sent To  
Notes
2015-11-03 15:12:0711/3/15 FAILED ELECTRICAL REVIEW. CONTRACTOR NOTIFIED
 VIA PHONE CALL. SENT TO LARGE DENIED BIN TBD> MA
2015-10-28 09:44:54RESUB ROUTED TO CCOLE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-10-01 Cont ID  
Sent By albarran Date 2015-10-01 Time 12:49 Rev Time 0.00
Received By albarran Date 2015-09-02 Time 16:06 Sent To  
Notes
2015-10-01 12:53:4110/1/15 FAILED ELECTRICAL REVIEW. CONTRACTOR NOTIFIED
 VIA EMAIL. SENT TO LARGE DENIED BIN "TBD". MA
2015-09-02 16:06:21B30

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2015-10-28 Cont ID  
Sent By ccole Date 2015-10-28 Time 16:41 Rev Time 0.00
Received By ccole Date 2015-10-28 Time 16:41 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2015-09-11 Cont ID  
Sent By ccole Date 2015-09-11 Time 09:52 Rev Time 0.00
Received By ccole Date 2015-09-11 Time 09:52 Sent To  
Notes
2015-09-11 09:56:231ST REVIEW: FBC 2014 MECHANICAL
 PERMIT #15090079
 9/11/15
  
 1) SHEET M/FP01.01: SHOW THE DIMENSIONS OF THE NEW VAV
 1-15 BRANCH DUCTS AT THE POINT OF CONNECTION, AND IN
 AND OUT OF THE VAV BOX.
 2) SUBMIT A CUT SHEET FOR THE VAV BOX.
  
 CHRISTOPHER L. COLE