Plan Review Details - Permit 15090071
Plan Review Stops For Permit 15090071
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2015-09-08 Cont ID  
Sent By rmcdouga Date 2015-09-08 Time 07:33 Rev Time 0.00
Received By rmcdouga Date 2015-09-08 Time 07:16 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2015-09-08 Cont ID  
Sent By rmcdouga Date 2015-09-08 Time 07:55 Rev Time 0.00
Received By rmcdouga Date 2015-09-08 Time 07:16 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2015-09-08 Cont ID  
Sent By tklarge Date 2015-09-08 Time 05:35 Rev Time 0.00
Received By tklarge Date 2015-09-08 Time 05:34 Sent To  
Notes
2015-09-08 05:35:37GAS PLAN REVIEW
 A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL
 PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT
 THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE
 REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK.
 PROVIDE COMPLETE PLANS, APPLIANCE/ EQUIPMENT
 SPECIFICATIONS AND GAS RISER THAT REFLECTS THE ENTIRE
 SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC SEC.
 107.2.1.
  
 GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE
 FBC-R, SEC. G2404.3.
 GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE FBC,
 FUEL GAS, SEC.301.3.
  
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-09-08 Cont ID  
Sent By rmcdouga Date 2015-09-08 Time 07:55 Rev Time 0.00
Received By rmcdouga Date 2015-09-02 Time 14:20 Sent To  
Notes
2015-09-02 14:20:58ROUTED TO ZONING

Review Stop P PLUMBING
Rev No 1 Status P Date 2015-09-08 Cont ID  
Sent By tklarge Date 2015-09-08 Time 05:34 Rev Time 0.00
Received By tklarge Date 2015-09-08 Time 05:13 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2015-09-04 Cont ID  
Sent By sgraham Date 2015-09-04 Time 14:52 Rev Time 0.00
Received By sgraham Date 2015-09-04 Time 14:52 Sent To B
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved