Plan Review Stops For Permit 15081110 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2016-01-13 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-01-13 |
Time |
08:30 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-01-13 |
Time |
08:21 |
Sent To |
|
|
Notes |
2016-01-13 08:38:26 | PROVISO | | COMPLIANCE WITH A2 OCCUPANCY | | IS SHOWN FOR EGRESS. FUTURE USE/ | | BUILDOUT IS TO COMPLY WITH LIMITATION | | OF 50# FLOOR DESIGN LIVE LOAD | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2015-12-17 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2015-12-17 |
Time |
10:34 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2015-12-16 |
Time |
16:02 |
Sent To |
|
|
Notes |
2015-12-17 10:42:42 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | 1. S1.4.5A, ENGINEER'S LETTER STATES THAT FLOOR LIVE | | LOAD FOR 2ND FLOOR AMENITY AREA IS 50 LB, BUT FBC TABLE | | 1607 REQUIRES 100 LB FOR ASSEMBLY USES. | | | | PLEASE INCORPORATE THE LIVE LOAD INTO THE PLAN, FBC | | 107. REVISE OCCUPANCY CLASSIFICATION FOR THE AREA TO A | | USE WITH FALLS WITHIN THE 50 LB. LIMITATION FOR THIS | | AREA (A SHEETS). | | | | PLEASE ADVISE WHEN THIS REVISION IS RESUBMITTED. THE | | BUILDING PLAN REVIEW WILL BE EXPEDITED. | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2015-11-21 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2015-11-21 |
Time |
14:09 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2015-11-21 |
Time |
14:09 |
Sent To |
|
|
Notes |
2015-11-21 14:10:19 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | 1. A0.1.2, FIRE RESISTANCE RATINGS HAVE BEEN REMOVED | | FROM THE SECOND FLOOR AMENITY AREA. IT IS NOT CLEAR HOW | | THIS AREA COMPLIES WITH FBC CHAPTER 7. REVISE PLAN TO | | INCORPORATE THE CODE WHICH SHOWS COMPLIANCE FOR THE NON | | RATED OPENINGS BETWEEN THE FIRST FLOOR AND SECOND | | FLOOR, FBC 712.4, 404. | | | | SEE ALSO FIRE COMMENTS AND PROVISO. | | | | 2. A0.1.2, REVISE PLAN TO INCLUDE SQUARE FOOT PER | | OCCUPANT | | | | 3. A0.1.2, DOOR FROM ASSEMBLY AREA TO ELEVATOR LOBBY IS | | TO SWING IN DIRECTION OF EGRESS TRAVEL, FBC1008.1.2. | | | | 4. 2ND FLOOR AMENITY AREA, FIRE DAMPER WAS REMOVED, BUT | | IT APPEARS THAT BOTH THE WALL AND FLOOR ARE REQUIRED TO | | BE RATED, 713.1. | | | | 5. A2.1.2, GRIDLINE G.A G.1, IT APPEARS THAT A PORTION | | OF THE FUTURE ADDITION WAS INCLUDED; PLEASE REMOVE AS | | IT IS NOT COVERED UNDER THE SCOPE OF THIS PERMIT. | | | | 6. S1.4.5A, SPECIFY FLOOR LIVE LOAD FOR 2ND FLOOR | | AMENITY AREA, FBC TABLE 1607. | | | | 7. BUILDING FLOOR HEIGHTS WERE REMOVED FROM S1.6A, | | S1.5A, AND POSSIBLY OTHER PAGES. INCLUDE ON THE PLAN, | | FBC107. | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2015-10-03 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2015-10-03 |
Time |
13:04 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2015-09-18 |
Time |
15:33 |
Sent To |
|
|
Notes |
2015-10-03 13:11:15 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | 1. NARRATIVE REFERS TO REVISION 10 FOR SHEET A3.1.1. I | | WAS UNABLE TO LOCATE THIS REVISION. | | | | SEE NARRATIVE, SHEET A3.1.1, ELIMINATING GUARDRAIL ATOP | | CONCRETE CRASH WALLS IN GARAGE. AFTER A THOROUGH SEARCH | | OF THIS PAGE, I WAS UNABLE TO LOCATE A REVISION 10 ON | | THIS SHEET. PLEASE NOTE THAT IT IS ALSO NOT INCLUDED IN | | THE REVISION BLOCK. SHEET A3.1.1 SUBMITTED FOR THIS | | REVISION INCLUDES REVISIONS UP TO REVISION 8. | | | | 2. CHANGE IN ELEVATION AT STAIR 3 IS NOT CLEAR. SEE FBC | | 1003.5 REGARDING CHANGE IN ELEVATION AND PROVIDE A | | DETAIL WHICH SHOWS COMPLIANCE. | | | | 3. SHEET 9.2, REVISION 10 NOT SUBMITTED. | | | | 4. ARCHITECT TO CONFIRM THAT ALL FIRE RATED WALLS SHOWN | | ON PLANS ARE IN PLACE, IN PARTICULAR THE AMENITY AREA, | | SECOND FLOOR. ALSO SEE MECHANICAL COMMENT REGARDING | | REMOVAL OF FIRE DAMPER. IT APPEARS THAT THIS FIRE RATED | | WALL IS REQUIRED, AND THE DAMPER IS REQUIRED. SEE FBC | | 713.1. PLEASE FEEL FREE TO CONTACT ME TO DISCUSS IF | | NECESSARY. | | | | | | | | | | | | | | | | | | | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2016-01-05 |
|
|
Cont ID |
|
Sent By |
albarran |
Date |
2016-01-05 |
Time |
19:27 |
Rev Time |
0.00 |
Received By |
albarran |
Date |
2015-12-15 |
Time |
08:33 |
Sent To |
|
|
Notes |
2016-01-05 19:31:14 | THOUGH THE LIFE SAFETY PLAN HAS SATISFIED THE MINIMUM | | CODE REQUIREMENTS. I BELIEVE THAT FOR THE COST OF AN | | EXIT LIGHT, LIFE SAFETY IS BEING JEOPARDIZED BY | | DIRECTING PATRONS TO AN EXIT FURTHER THAN THE AVAILABLE | | DOOR IN MANY CASES. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2015-11-17 |
|
|
Cont ID |
|
Sent By |
albarran |
Date |
2015-11-17 |
Time |
19:50 |
Rev Time |
0.00 |
Received By |
albarran |
Date |
2015-11-17 |
Time |
17:30 |
Sent To |
|
|
Notes |
2015-11-17 19:51:40 | NOT ALL CORRECTIONS HAVE BEEN SATISFACTORILY ADDRESSED. | | EMAIL SENT TO DESIGN PROFESSIONAL AND PERMIT RUNNER | | WITH COMMENTS. | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2015-10-20 |
|
|
Cont ID |
|
Sent By |
albarran |
Date |
2015-10-20 |
Time |
17:05 |
Rev Time |
0.00 |
Received By |
albarran |
Date |
2015-10-20 |
Time |
16:44 |
Sent To |
|
|
Notes |
2015-10-20 17:07:34 | PLEASE NOTE THAT THE ELECTRICAL REVIEW OF THE ABOVE | | MENTIONED JOB HAS BEEN COMPLETED. BELOW ARE THE | | COMMENTS WITH REGARDS TO THE REQUIRED CORRECTIONS. THE | | PLANS SHALL BE REVISED TO ADDRESS FOLLOWING ITEMS; ONCE | | CORRECTED SHALL BE RESUBMITTED FOR ANOTHER REVIEW. | | PG. E2.1.1 | | 1. AN ADDITIONAL EXIT LIGHT OR DUAL FACE IS REQUIRED. | | EXIT LIGHT SHALL BE VISIBLE FROM EITHER PATH OF TRAVEL. | | 2. REVIEW AND REVISE EXIT LIGHT PLACEMENT IN THE | | AMENITY & LEASING AREA. FROM THE SUBMITTED DRAWING I | | CAN?T BE CERTAIN IF ALL DOORS ACTUALLY LEAD TO THE PATH | | OF EGRESS. | | PG. E2.1.2 | | 1. EXIT LIGHT REQUIRED IN THE GARAGE AREA. THIS APPEARS | | TO BE A HANDICAP RAMP. (N/1) | | 2. EXIT LIGHT REQUIRED FROM GARAGE. (I-J/14) | | 3. EXIT LIGHT REQUIRED FROM GARAGE. (A-B/13) WILL | | COMPARE W/SHEET E4.4 | | 4. EXIT LIGHT REQUIRED FROM GARAGE. ( H/13-14) ? ? ? ? | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | RE-SUBMITTAL FORM. | | | | IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO | | CONTACT ME DIRECTLY. | | | | THANK YOU | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
P |
Date |
2015-12-11 |
|
|
Cont ID |
|
Sent By |
wjolin |
Date |
2015-12-11 |
Time |
09:04 |
Rev Time |
0.00 |
Received By |
wjolin |
Date |
2015-12-11 |
Time |
09:03 |
Sent To |
|
|
Notes |
2015-12-11 09:04:06 | SHELL SPACE SIGNAGE INDICATING "NO STORAGE" AND ADDING | | A 40-MINUTE WALL FIRE RATING IS A GOOD SOLUTION FOR THE | | TEMPORARY SHELL SPACE INCIDENTAL STORAGE. IF THE SHELL | | SPACE BECOMES PERMANENT STORAGE EXCEEDING THE | | INCIDENTAL THRESHOLD (10%) OR BECOMES A PERMANENT | | OCCUPANCY OTHER THAN ASSEMBLY, THE FIRE RATING ON THE | | WALLS WILL HAVE TO BE RE-EVALUATED FOR CODE COMPLIANCE. |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
F |
Date |
2015-11-19 |
|
|
Cont ID |
|
Sent By |
wjolin |
Date |
2015-11-19 |
Time |
15:11 |
Rev Time |
0.00 |
Received By |
wjolin |
Date |
2015-11-19 |
Time |
15:10 |
Sent To |
|
|
Notes |
2015-11-19 15:10:12 | WE CANNOT BASE OUR INSPECTIONS/PLAN REVIEWS ON FUTURE | | DESIGNS AND RISK THE CONSTRUCTION BEING LEFT UNFINISHED | | AND NON-CODE COMPLIANT. A FLOOR-TO-FLOOR FIRE | | SEPARATION IS REQUIRED BY CODE OR THE DESIGN NEEDS TO | | WHOLLY COMPLY AS EITHER A COMMUNICATING SPACE, AN | | ATRIUM, A MEZZANINE OR A CONVENIENCE OPENING. THE | | CURRENT FIELD CONDITIONS DO NOT FULLY COMPLY WITH ANY | | OF THESE OPTION. HENCE, A FINAL FIRE INSPECTION WILL | | NOT PASS INSPECTION AND A CERTIFICATE OF OCCUPANCY WILL | | NOT BE ISSUED UNTIL THE 2ND FLOOR AMENITIES AREA DESIGN | | AND CONSTRUCTION HAS BEEN COMPLETED. THIS ISSUE | | GENERATED THE FOLLOWING COMMENTS DURING FIRE PLAN | | REVIEW OVER A YEAR AGO (09/30/14): | | | | 705 NORTH OLIVE AVENUE | | PERMIT #14030096 | | REVIEW COMMENTS - FIRE DEPARTMENT | | | | *****PROVISO - THE AMENITIES/LEASING OFFICE IS NOT | | APPROVED FOR CONSTRUCTION AT THIS TIME UNTIL THE | | FLOOR/CEILING OPENINGS DESIGN HAS BEEN RESOLVED***** | | | | ROUND #3 COMMENTS: | | REPEAT COMMENT - SHEET A-0.1.2: SEVERAL AREAS IN THE | | AMENITIES/LEASING OFFICE ARE OPEN TO THE FLOOR BELOW. | | THE DESIGN SHALL CONFORM TO SECTION 8.6 VERTICAL | | OPENINGS AS EITHER A COMMUNICATING SPACE, CONVENIENCE | | OPENING, ATRIUM, OR MEZZANINE. FOR INSTANCE, EACH | | OCCUPANT NOT IN THE COMMUNICATING SPACE (SUCH AS | | AMENITY SECOND FLOOR REST ROOM) NEEDS TO HAVE ACCESS TO | | AT LEAST ONE EXIT WITHOUT HAVING TO ENTER THE | | COMMUNICATING SPACE, OR AS A CONVENIENCE OPENING, THE | | OPENINGS NEED TO BE SEPARATED FROM CORRIDORS. | | | | WESLEY R. JOLIN | | ASSISTANT FIRE MARSHAL | | FIRE INVESTIGATOR/INSPECTOR | | BUREAU OF FIRE PREVENTION | | WEST PALM BEACH FIRE RESCUE | | FIRE STATION #1: 561.804.4752 | | CONST. SERVICES : 561.805.6730 | | [email protected] | | | | | | THE SECOND FLOOR AMENITIES AREA IS NO LONGER FIRE | | SEPARATED FROM THE FIRST FLOOR AS IS REQUIRED FOR | | FLOOR-TO-FLOOR SEPARATION. OTHERWISE, AS PREVIOUSLY | | INDICATED IN 2014: SHEET A-0.1.2: SEVERAL AREAS IN THE | | AMENITIES/LEASING OFFICE ARE OPEN TO THE FLOOR BELOW. | | THE DESIGN SHALL CONFORM TO SECTION 8.6 VERTICAL | | OPENINGS AS EITHER A COMMUNICATING SPACE, CONVENIENCE | | OPENING, ATRIUM, OR MEZZANINE. FOR INSTANCE, EACH | | OCCUPANT NOT IN THE COMMUNICATING SPACE (SUCH AS | | AMENITY SECOND FLOOR REST ROOM) NEEDS TO HAVE ACCESS TO | | AT LEAST ONE EXIT WITHOUT HAVING TO ENTER THE | | COMMUNICATING SPACE, OR AS A CONVENIENCE OPENING, THE | | OPENINGS NEED TO BE SEPARATED FROM CORRIDORS. |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2015-11-04 |
|
|
Cont ID |
|
Sent By |
wjolin |
Date |
2015-09-18 |
Time |
13:36 |
Rev Time |
0.00 |
Received By |
wjolin |
Date |
2015-09-15 |
Time |
17:47 |
Sent To |
|
|
Notes |
2015-09-18 13:37:11 | THE SECOND FLOOR AMENITIES AREA IS NO LONGER FIRE | | SEPARATED FROM THE FIRST FLOOR AS IS REQUIRED FOR | | FLOOR-TO-FLOOR SEPARATION. OTHERWISE, AS PREVIOUSLY | | INDICATED IN 2014: SHEET A-0.1.2: SEVERAL AREAS IN THE | | AMENITIES/LEASING OFFICE ARE OPEN TO THE FLOOR BELOW. | | THE DESIGN SHALL CONFORM TO SECTION 8.6 VERTICAL | | OPENINGS AS EITHER A COMMUNICATING SPACE, CONVENIENCE | | OPENING, ATRIUM, OR MEZZANINE. FOR INSTANCE, EACH | | OCCUPANT NOT IN THE COMMUNICATING SPACE (SUCH AS | | AMENITY SECOND FLOOR REST ROOM) NEEDS TO HAVE ACCESS TO | | AT LEAST ONE EXIT WITHOUT HAVING TO ENTER THE | | COMMUNICATING SPACE, OR AS A CONVENIENCE OPENING, THE | | OPENINGS NEED TO BE SEPARATED FROM CORRIDORS. | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2016-01-13 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-01-13 |
Time |
08:39 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-01-11 |
Time |
12:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2016-01-06 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2016-01-06 |
Time |
08:01 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2015-12-10 |
Time |
09:38 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2015-11-21 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2015-11-21 |
Time |
14:10 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2015-10-23 |
Time |
08:58 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2015-10-22 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2015-10-22 |
Time |
11:25 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2015-08-31 |
Time |
09:22 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
P |
Date |
2015-12-15 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2015-12-15 |
Time |
11:21 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2015-12-15 |
Time |
11:21 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
F |
Date |
2015-11-04 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2015-11-04 |
Time |
10:25 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2015-11-04 |
Time |
09:40 |
Sent To |
|
|
Notes |
2015-11-04 10:38:33 | 2ND REVIEW: FBC 2014 MECHANICAL | | PERMIT #15081110 | | MASTER #14030096 | | | | 1) THE RESPONSE NARRATIVE TO COMMENT #2 FROM THE 1ST | | REVIEW INDICATES THAT THE SECOND FLOOR ATRIUM WALL THAT | | THE DUCT IS PENETRATED IS NOT A FIRE-RATED WALL, AND | | THEREFORE NO DAMPER IS REQUIRED. PLEASE REFER TO | | SECTION 404.6 FBC-10 AND INDICATE WHICH OF THE THREE | | EXCEPTIONS LISTED IS BEING USED TO DE-RATE THE WALL. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2015-09-10 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2015-09-10 |
Time |
12:48 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2015-09-10 |
Time |
12:48 |
Sent To |
|
|
Notes |
2015-09-10 12:56:55 | 1ST REVIEW: FBC 2010 MECHANICAL | | REVISION #15081110 | | MASTER #14030096 | | 9/10/15 | | | | 1) PROVIDE THE REVISED M-2.1.2 PLAN SHEET- THE REVISION | | #10 NARRATIVE INDICATES THE PLAN WAS REVISED TO SHOW | | NEW VENTILATION FANS. PLEASE BE SURE TO PROVIDE | | VENTILATION CALCULATIONS, EQUIPMENT SCHEDULES, OPENING | | PROTECTIONS (IF APPLICABLE), INSTALLATION DETAILS, AND | | REVISED ELECTRICAL PLANS | | 2) SHEET M-4.4: PLEASE CLARIFY WHY THE FIRE DAMPER WAS | | REMOVED FROM THE DUCT PENETRATING THE 2ND FLOOR WALL | | ABOVE THE FITNESS CENTER- THE WALL, AS SHOWN IN THE | | LIFE SAFETY PLAN A-0.1.2, IS A FIRE-RATED WALL. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2015-11-02 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2015-11-02 |
Time |
16:07 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2015-11-02 |
Time |
16:07 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2015-09-09 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2015-09-09 |
Time |
15:55 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2015-09-09 |
Time |
15:55 |
Sent To |
|
|
Notes |
2015-09-09 15:56:11 | 1ST REVIEW: FBC 2014 | | | | GEORGE JOHNSON | | PLUMBING PLANS EXAMINER | | 561-805-6711 | | [email protected] | | | | | | PLUMBING COMMENTS: | | | | 1.SHEETS P-2.1.2A AND P-5.2 ARE MISSING PLEASE PROVIDE. | | PER WPB AMEND SEC 107.2.1 | | 2. PLEASE PROVIDE SPECS FOR TANKLESS WATER HEATER AND | | EYE WASH. | | PER WPB AMEND SEC 107.2.1.3 | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2016-01-27 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2016-01-27 |
Time |
16:15 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2016-01-19 |
Time |
07:53 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2015-10-07 |
|
|
Cont ID |
|
Sent By |
aaponte |
Date |
2015-10-07 |
Time |
11:39 |
Rev Time |
0.00 |
Received By |
aaponte |
Date |
2015-10-07 |
Time |
11:39 |
Sent To |
|
|
Notes |
2015-10-07 11:39:58 | PROPOSED REVISIONS LISTED ON THE NARRATIVE DO NOT | | AFFECT THE EXTERIOR OF THE BUILDING. | 2015-09-25 11:50:27 | 9/25/15 |
|
|