Plan Review Details - Permit 15080980
Plan Review Stops For Permit 15080980
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2015-09-01 Cont ID  
Sent By rmcdouga Date 2015-09-01 Time 17:31 Rev Time 0.00
Received By rmcdouga Date 2015-09-01 Time 17:28 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2015-09-15 Cont ID  
Sent By rmcdouga Date 2015-09-15 Time 17:50 Rev Time 0.00
Received By rmcdouga Date 2015-09-15 Time 17:51 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2015-09-01 Cont ID  
Sent By rmcdouga Date 2015-09-01 Time 17:27 Rev Time 0.00
Received By rmcdouga Date 2015-09-01 Time 17:27 Sent To  
Notes
2015-09-01 17:27:19PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY ELECTRICAL
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SHOW COMPLIANCE WITH FBCR - E 4204.2 FOR
 EQUIPOTENTIAL BONDING.
  
 2) SHOW COMPLIANCE WITH FBCR - E 4204.3 FOR REQUIRED
 BONDING OF POOL WATER.

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2015-08-31 Cont ID  
Sent By tklarge Date 2015-08-31 Time 06:21 Rev Time 0.00
Received By tklarge Date 2015-08-31 Time 06:21 Sent To  
Notes
2015-08-31 06:23:22GAS PLAN REVIEW
 A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL
 PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT
 THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE
 REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK.
 PROVIDE COMPLETE PLANS, APPLIANCE/ EQUIPMENT
 SPECIFICATIONS AND GAS RISER THAT REFLECTS THE ENTIRE
 SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC SEC.
 107.2.1.
  
 GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE
 FBC-R, SEC. G2404.3.
 GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE FBC,
 FUEL GAS, SEC.301.3.
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-09-16 Cont ID  
Sent By tklarge Date 2015-09-16 Time 10:07 Rev Time 0.00
Received By tklarge Date 2015-09-11 Time 14:35 Sent To  
Notes
2015-09-11 14:35:40RESUB ROUTED TO RMCDOUGAL

Review Stop P PLUMBING
Rev No 2 Status P Date 2015-09-16 Cont ID  
Sent By tklarge Date 2015-09-16 Time 10:07 Rev Time 0.00
Received By tklarge Date 2015-09-16 Time 09:54 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2015-08-31 Cont ID  
Sent By tklarge Date 2015-08-31 Time 06:21 Rev Time 0.00
Received By tklarge Date 2015-08-31 Time 05:27 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2015-08-28 Cont ID  
Sent By sgraham Date 2015-08-28 Time 14:00 Rev Time 0.00
Received By sgraham Date 2015-08-28 Time 14:00 Sent To B
Notes
***NONE***