Plan Review Stops For Permit 15080892 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
P |
Date |
2016-02-08 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-02-08 |
Time |
12:53 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-02-08 |
Time |
12:52 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
F |
Date |
2016-01-21 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-01-21 |
Time |
08:43 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-01-21 |
Time |
08:43 |
Sent To |
|
|
Notes |
2016-01-21 08:45:21 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FROM PREVIOUS LIST: | | | | 1. IF ANY DOORS ARE EXTERIOR DOORS, AND IF THE BUILDING | | IS GREATER THAN 60FEET, DESIGN PRESSURES TO BE | | DETERMINED BY A DESIGN PROFESSIONAL, FBC 1609 | | (ASCE7-10), FS 471, 481. | | | | ENGINEER'S PLAN STATES TO SEE THE DOOR SPEC SHEETS FOR | | DP LIMITATIONS. | | | | ENGINEER TO STATE THE DESIGN PRESSURE REQUIREMENT FOR | | THE BUILDING. THE DOOR PRODUCT APPROVAL IS TO COMPLY | | WITH THE DESIGN PRESSURE REQUIREMENT. REVISE THE PLAN, | | OR ADD A LETTER, WHICH STATES THE DESIGN PRESSURE | | REQUIREMENTS FOR THE EXTERIOR DOORS FOR THIS PROJECT. | | NOTE THAT THIS BUILDING APPEARS TO BE LOCATED IN | | EXPOSURE D. THE DP LIMITATION FOR THE PROPOSED DOORS IS | | +65 / -53.3. | | | | NEW COMMENT: | | | | 2. PLEASE COLLATE TWO COMPLETE SETS OF PLANS FOR | | REVISION ISSUANCE. THIS SHOULD INCLUDE: | | | | DOOR PRODUCT APPROVAL REVIEWED BY DESIGNER OF RECORD, | | FBC 107. | | PLANS SHOULD INCLUDE DESIGN PRESSURE REQUIREMENTS, FBC | | 1609. | | SPEC SHEETS FOR THE PROPOSED DOOR WHICH SHOWS | | COMPLIANCE WITH THE 90 MINUTE FIRE RESISTANCE RATING IS | | REQUIRED. THE NEW NOA IS FOR MESKER N SERIES DOOR; THE | | SPEC SHEETS ARE FOR DAYBAR, FBC 107. | | INDICATE WHICH THRESHOLD IS PROPOSED. IF ADA THRESHOLD | | IS NOT SELECTED, PLEASE CONTACT ME PRIOR TO RESUBMITTAL | | TO DISCUSS. FBC 2010 ACCESSIBILITY 404.2.5, FAIR | | HOUSING. | | | | | | | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
N |
Date |
2015-12-04 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2015-12-04 |
Time |
17:37 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2015-12-04 |
Time |
17:37 |
Sent To |
|
|
Notes |
2015-12-04 17:40:12 | CONTRACTOR SENT LETTER STATING THAT THE OWNER DOES NOT | | WANT TO HAVE THE OPAQUE DOOR WHICH WAS RESUBMITTED | | INSTALLED. OWNER CURRENTLY HAS A 90 MINUTE DOOR WITH | | GLASS. THE DOOR INITIALLY PROPOSED HAS A DP LIMITATION | | OF -53 BUT THE BUILDING HAS A DP REQUIREMENT OF +-65. | | | | SPOKE WITH ROBERT BROWN; ADVISED CONTRACTOR THAT A NON | | IMPACT DOOR WOULD BE ACCEPTABLE (GLAZING LIMITED TO 100 | | SI) | | | | PROPOSED PRODUCT SUBMITTED COMPLIES WITH CODE BUT | | PULLED FROM REVIEW BY CONTRACTOR. | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2015-10-14 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2015-10-06 |
Time |
16:15 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2015-10-14 |
Time |
18:19 |
Sent To |
|
|
Notes |
2015-10-14 18:21:18 | ****CORRECTIONS**** | | REVISED 9/16 | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FROM PREVIOUS LIST: | | | | 3. IF ANY DOORS ARE EXTERIOR DOORS, AND IF THE BUILDING | | IS GREATER THAN 60FEET, DESIGN PRESSURES TO BE | | DETERMINED BY A DESIGN PROFESSIONAL, FBC 1609 | | (ASCE7-10), FS 471, 481. | | | | ENGINEER'S PLAN STATES TO SEE THE DOOR SPEC SHEETS FOR | | DP LIMITATIONS. | | | | ENGINEER TO STATE THE DESIGN PRESSURE REQUIREMENT FOR | | THE BUILDING. THE DOOR PRODUCT APPROVAL IS TO COMPLY | | WITH THE DESIGN PRESSURE REQUIREMENT. REVISE THE PLAN, | | OR ADD A LETTER, WHICH STATES THE DESIGN PRESSURE | | REQUIREMENTS FOR THE EXTERIOR DOORS FOR THIS PROJECT. | | NOTE THAT THIS BUILDING APPEARS TO BE LOCATED IN | | EXPOSURE D. THE DP LIMITATION FOR THE PROPOSED DOORS IS | | +65 / -53.3. | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2015-08-29 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2015-08-29 |
Time |
11:06 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2015-08-29 |
Time |
11:06 |
Sent To |
FIRE |
|
Notes |
2015-08-29 11:07:49 | ****CORRECTIONS**** | | REVISED 9/16 | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | 1. PROVIDE A PLAN SHOWING LOCATION OF PROPOSED DOORS, | | FIRE RATING OF PROPOSED DOORS, AND FIRE RATING FOR THE | | WALLS. | | | | NOT ENOUGH INFORMATION WAS PROVIDED TO PERFORM A PLAN | | REVIEW, FBC 107. | | | | PLAN SHOULD SHOW LOCATION OF DOORS, ALL FIRE RATED | | WALLS (ALL APPLICABLE SEPARATIONS SUCH AS FIRE PUMP | | ROOMS, ELECTRICAL ROOMS, STORAGE AS WELL AS OCCUPANCY | | SEPARATION, ETC.). SEE FBC CHAPTERS 5, 7. | | | | 2. FBC 107, THE PLAN IS TO INCLUDE THE PRINTED NAME AND | | SIGNATURE OF THE INDIVIDUAL TAKING RESPONSIBILITY FOR | | THE INFORMATION AND DESIGN. A DESIGN PROFESSIONAL MAY | | BE REQUIRED, FS471, 481.229(C). | | | | 3. IF ANY DOORS ARE EXTERIOR DOORS, AND IF THE BUILDING | | IS GREATER THAN 60FEET, DESIGN PRESSURES TO BE | | DETERMINED BY A DESIGN PROFESSIONAL, FBC 1609 | | (ASCE7-10), FS 471, 481. | | | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
P |
Date |
2016-01-11 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2016-01-11 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2016-01-11 |
Time |
09:39 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2015-10-06 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2015-10-14 |
Time |
18:23 |
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2015-10-06 |
Time |
16:06 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2015-08-31 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2015-08-31 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2015-08-31 |
Time |
10:48 |
Sent To |
PC |
|
Notes |
2015-08-31 10:55:34 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | 1) THERE IS INSUFFICIENT DETAIL TO PROVIDE A PROPER OR | | COMPLETE PLAN REVIEW. | | | | 2) THERE IS NO INDICATION OF THE LOCATION OR NUMBER OF | | DOORS. | | | | 3) THERE IS NO DOOR SCHEDULE. | | | | 4) THERE IS NO INDICATION OF EXISTING DOORS OR DOOR | | TYPES. | | | | 5) THERE IS NO INDICATION OF VALUE OF WORK; PROVIDE | | COST OR COPY OF CONTRACT. | | | | 6) ADDITIONAL COMMENTS MAY BE PROVIDED BASED ON THE | | SUBMITTAL OF THE ABOVE. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2016-02-08 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-02-08 |
Time |
12:53 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-01-28 |
Time |
15:29 |
Sent To |
|
|
Notes |
2016-01-28 15:29:47 | RESUB ROUTED TO SHILL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2016-01-21 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2016-01-21 |
Time |
08:51 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2016-01-08 |
Time |
12:49 |
Sent To |
|
|
Notes |
2016-01-08 12:49:46 | RESUB ROUTED TO PLEDUC |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2015-12-04 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2015-12-04 |
Time |
17:40 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2015-12-01 |
Time |
10:55 |
Sent To |
|
|
Notes |
2015-12-01 10:55:14 | RESUB ROUTED TO SHILL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2015-10-14 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2015-10-14 |
Time |
18:23 |
Rev Time |
0.00 |
Received By |
shill |
Date |
2015-10-01 |
Time |
12:51 |
Sent To |
FIRE |
|
Notes |
2015-10-09 10:43:16 | 10/9 TO SH DESK | | | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2015-08-31 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2015-08-31 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2015-08-24 |
Time |
08:18 |
Sent To |
|
|
Notes |
2015-08-29 11:08:18 | 8/29 TO FIRE BOX | | | | | 2015-08-25 09:01:18 | REVISION ROUTED TO SHILL |
|
|