Plan Review Details - Permit 15070440
Plan Review Stops For Permit 15070440
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2015-08-12 Cont ID  
Sent By skennedy Date 2015-08-12 Time 10:35 Rev Time 0.00
Received By skennedy Date 2015-08-12 Time 10:35 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2015-08-01 Cont ID  
Sent By skennedy Date 2015-08-01 Time 13:22 Rev Time 0.00
Received By skennedy Date 2015-08-01 Time 13:22 Sent To P
Notes
2015-08-01 13:39:182ND REVIEW: FBC 2014 5TH ED.
  
 YOU HAVE NOW SUBMITTED IN ADDITION TO THE SPEC SHEET
 FOR APC CORK, A PLUMBING RISER AND A STATEMENT THAT YOU
 ARE CONVERTING A TUB TO A SHOWER AND KITCHEN CABINET
 DRAWINGS FROM HOME DEPOT.
  
 YOU SUBMITTED NO TEST REPORTS ON THE STC AND ICC FOR
 THE CORK AND YOU DID NOT PROVIDE THE FLOOR ASSEMBLY .
 THE REPORT WE HAVE ON FILE FOR THIS PRODUCT IS FOR USE
 WITH QUARRY TILE OVER A 6" CONCRETE SLAB. ARE YOU USING
 QUARRY TILE? WHAT IS THE THICKNESS OF THE SLAB? PLEASE
 PROVIDE TEST REPORTS AND A BETTER PLAN TO INDICATE WHAT
 THE MATERIALS ARE TO BE FOR THE BATHROOM
 RE-CONFIGURATION. IT MAY BE THAT THIS CORK PRODUCT DOES
 NOT MEET THE SOUND TRANSMISSION CRITERIA OF FBC 1207.
  
 PLEASE PROVIDE A PLAN AS REQUESTED PRIOR PER FBC
 107.2.1 TO FULLY INDICATE THE EXTENT OF THE WORK
 PROPOSED IN DETAIL.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-07-15 Cont ID  
Sent By skennedy Date 2015-07-15 Time 07:57 Rev Time 0.00
Received By skennedy Date 2015-07-15 Time 07:57 Sent To  
Notes
2015-07-15 08:08:00FBC 2014 5TH EDITION 1ST REVIEW
  
 YOU HAVE ONLY SUBMITTED INFORMATION ON A CORK
 UNDERLAYMENT. ARE YOU DOING ANYTHING OTHER THAN TILE
 FLOORING? DOES THE SCOPE OF THE JOB INCLUDE ACTUAL
 REMODELING OR IS IT SIMPLY FIXTURE AND CABINET
 REPLACEMENT IN THE SAME LOCATIONS?
  
 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 CONSTRUCTION DOCUMENTS SHALL BE DIMENSIONED AND DRAWN
 UPON SUITABLE MATERIAL. ELECTRONIC MEDIA DOCUMENTS
 SHALL BE SUBMITTED WHEN APPROVED BY THE BUILDING
 OFFICIAL. CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT
 CLARITY TO INDICATE THE LOCATION, NATURE AND EXTENT OF
 THE WORK PROPOSED AND SHOW IN DETAIL THAT IT WILL
 CONFORM TO THE PROVISIONS OF THIS CODE AND RELEVANT
 LAWS, ORDINANCES, RULES AND REGULATIONS, AS DETERMINED
 BY THE BUILDING OFFICIAL. SUCH DRAWINGS AND
 SPECIFICATIONS SHALL CONTAIN INFORMATION, IN THE FORM
 OF NOTES OR OTHERWISE, AS TO THE QUALITY OF MATERIALS,
 WHERE QUALITY IS ESSENTIAL TO CONFORMITY WITH THE
 TECHNICAL CODES. SUCH INFORMATION SHALL BE SPECIFIC,
 AND THE TECHNICAL CODES SHALL NOT BE CITED AS A WHOLE
 OR IN PART, NOR SHALL THE TERM "LEGAL" OR ITS
 EQUIVALENT BE USED AS A SUBSTITUTE FOR SPECIFIC
 INFORMATION. ALL INFORMATION, DRAWINGS, SPECIFICATIONS
 AND ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE
 OF THE PERSON RESPONSIBLE FOR THE DESIGN. (SEE ALSO
 SECTION 107.3.5).
  
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-08-12 Cont ID  
Sent By skennedy Date 2015-08-12 Time 10:35 Rev Time 0.00
Received By skennedy Date 2015-07-31 Time 15:56 Sent To  
Notes
2015-07-31 15:56:08RESUB ROUTED TO SKENNEDY

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-07-15 Cont ID  
Sent By skennedy Date 2015-07-15 Time 07:59 Rev Time 0.00
Received By skennedy Date 2015-07-10 Time 07:55 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2015-08-12 Cont ID  
Sent By skennedy Date 2015-08-12 Time 10:35 Rev Time 0.00
Received By skennedy Date 2015-08-12 Time 10:35 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2015-08-03 Cont ID  
Sent By gjohnson Date 2015-08-03 Time 14:32 Rev Time 0.00
Received By gjohnson Date 2015-08-03 Time 14:32 Sent To  
Notes
2015-08-03 14:41:191ST REVIEW : FBC 2014
  
  
 COMMENTS
  
 1.MUST SUMMIT FLOOR AND ELIVATION PLAN.
 PER WPB AMENDMENTS 107.2.1
  
 2.BUILDING MUST COMPLY WITH FEDERAL REGULATION OF FAIR
 HOUSING ACT.
  
 3.FLOOR PLAN FOR BATHROOM SHALL SHOW DIMENTIONS FOR
 REINFORCEMENT OF GRAB BARS.
 FAIR HOUSING ACT DESIGN MANUUAL CH 6
  
 $. FLOOR PLAN SHALL SHOW CLEAR FLOOR SPACE IN BATHROOM
 AND KITCHEN.
 FAIR HOUSING ACT DESIGN MANUAL CH7
  
  
  
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 EX. 561-805-6711
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved