Plan Review Details - Permit 15061087
Plan Review Stops For Permit 15061087
Review Stop G GAS REVIEW
Rev No 3 Status P Date 2015-11-03 Cont ID  
Sent By tklarge Date 2015-11-03 Time 09:04 Rev Time 0.00
Received By tklarge Date 2015-11-03 Time 05:27 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2015-07-04 Cont ID  
Sent By tklarge Date 2015-07-04 Time 06:53 Rev Time 0.00
Received By tklarge Date 2015-07-04 Time 05:47 Sent To  
Notes
2015-07-04 06:52:561) THE PIPING PLAN SHOWS UNDERGROUND GAS PIPING &
 SLEEVE TO TWO DRYERS. GAS PIPING IS PROHIBITED PER THE
 2010 FBC-R SEC. G2415.4. THE INSTALLATION OF GAS PIPNG
 BENEATH BUILDINGS IS PERMITTED WHEN THERE IS NO OTHER
 WAY TO INSTALL THE PIPING. SUBMIT A FLOOR PLAN SHOWING
 THE LOCATION OF ALL ALL GAS APPLIANCES IN RELATION TO
 THE GAS METER. THE DRYERS SHALL NOT BE PIPED UNDER THE
 SLAB UNLESS THAT IS THE ONLY ALTERNATIVE.
 2) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR ALL
 GAS APPLIANCES & EQUIPMENT. ALL APPLIANCES & EQUIPMENT
 SHALL BE LISTED PER THE 2010 FBC-R SEC.G2404.3.
 3)THE FOLLOWING ITEMS SHALL BE IDENTIFIED ON BOTH
 DRAWINGS FOR THE INSTALLATION OF THE GAS PIPING UNDER
 THE BUILDING SLAB IF IT IS ALLOWED. THE INSTALLATION
 UNDER THE SALB IS CONTINGENT UPON THE LOCATION OF THE
 GAS DRYERS.
 A) INDICATE THE TYPE OF SLEEVE MATERIAL FOR THE PIPING
 FOR THE DRYERS ON THE PLAN. THE MATERIAL SHALL COMPLY
 WITH 2010 FBC-R SEC.G2415.12.
 B) THE TERMINATION OF THE CONDUIT INDOOR AND OUTDOOR
 SHALL COMPLY WITH 2010 FBC-R SEC. G2415.12.1.
 C) INDICATE ON THE PLAN HOW THE ANNULAR SPACE BETWEEN
 THE GAS PIPING AND THE SLEEVE IS TO BE SEALED. BE
 SPECIFIC.
 D) INDICATE THE TYPE OF GAS PIPING TO BE INSTALLED TO
 THE DRYERS. PE PIPING CAN ONLY BE INSTALLED OUTSIDE
 UNDERGROUND PER THE 2010 FBC-R SEC. G2415.15.1.
 4) INDICATE THE APPLICABLE SIZING TABLES USED FOR THE
 SIZING OF THE PE LINE AND ALSO THE PIPING TO THE
 DRYERS.2010 FBC-R SEC. G2413.3.
 5) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR THE 2
 PSI REGULATORS. REGULATORS SHALL COMPLY WITH 2010 FBC-R
 SEC.G2421.1 & G2421.2.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2015-06-25 Cont ID  
Sent By tklarge Date 2015-06-25 Time 07:27 Rev Time 0.00
Received By tklarge Date 2015-06-25 Time 05:56 Sent To  
Notes
2015-06-25 05:55:081)THE GAS PLAN IS UNACCEPTABLE. THERE ARE TOO MANY
 DEFICIENCIES TO LIST. COMPLY WITH ALL THE APPLICABLE
 REQUIREMENTS OF THE REQUIREMENTS FOR GAS PERMIT FORM
 THAT I HAVE ATTACHED TO THE PLANS. WPB AMEND. TO 2010
 FBC SEC. 107.2.1.
 2) THE CONTRACTOR IS LICENSED AS A CLASS "A" MECHANICAL
 CONTRACTOR. FLA. STATUTES 489.105 ( F ) DOES NOT ALLOW
 A CLASS "A" MECHANICAL CONTRACTOR TO RUN ANY GAS PIPE.
 A CLASS "A" CONTRACTOR MAY ONLY DISCONNECT AND
 RECONNECT CHANGEOUTS OF LP OR NATURAL GAS APPLIANCES.
 THIS PERMIT WILL NOT BE ISSUED TO THIS MECHANICAL
 CONTRACTOR.
 3) GAS PERMIT APPLICATION REQUIREMENTS
  
 EFFECTIVE IMMEDIATELY THE FOLLOWING INFORMATION SHALL
 BE SHOWN ON ALL GAS DRAWINGS SUBMITTED FOR PERMITTING
 IN THE CITY OF WEST PALM BEACH:
  
 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL
 CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS PER
 FBC-2010 FUEL GAS, SECS. 402.4.1, 402.4.2.
  
 2. SHOW TYPE OF PIPING MATERIAL BEING INSTALLED, ALL
 PIPE SIZES, AND THE EHD NUMBER OF CORRUGATED STAINLESS
 STEEL TUBING FOR EACH PIPE SIZE IF BEING USED.
  
 3. TYPE OF GAS, (LP OR NATURAL).
  
 4. BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON
 THE SYSTEM. REFER TO THE FBC-2010 FUEL GAS SECS. 401.8
 THRU 402.6.1 AND TABLES 402.4(1) THRU 402.4(35)
  
 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY,
 (METER), TO THE MOST REMOTE OUTLET IN THE BUILDING
 AND/OR SYSTEM PER THE FBC-2010 FUEL GAS APPENDIX A ?
 USE OF CAPACITY SECTION A.3.1(4) & 2010 FUEL GAS CODE
 SEC. 402.4.1.
  
 6. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE
 FBC-2010 FUEL GAS CODE SEC. 304
  
 7. INDICATE THE DELIVERY PRESSURE (PSI) PER FBC-2010
 FUEL GAS SEC. 402.2. IF NATURAL GAS SPECIFY .5 PSI OR 2
 PSI.
  
 8. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND
 TERMINATION OF THE GAS VENTS PER FBC-2010 FUEL GAS CODE
 SEC. 502 THRU 505.
  
 9. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL
 GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA
 54, NFPA 58, AND FBC-2010 FUEL GAS SEC. 402.2
  
 ANY QUESTIONS REGARDING THESE REQUIREMENTS MAY BE
 REFERRED TO:
  
 CHIEF PLUMBING INSPECTOR (561) 805-6692
  
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-11-03 Cont ID  
Sent By tklarge Date 2015-11-03 Time 09:04 Rev Time 0.00
Received By tklarge Date 2015-11-02 Time 13:34 Sent To  
Notes
2015-11-02 13:35:06RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-11-03 Cont ID  
Sent By lmarchan Date 2015-07-04 Time 13:34 Rev Time 0.00
Received By tklarge Date 2015-07-02 Time 16:33 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved