Plan Review Details - Permit 15061015
Plan Review Stops For Permit 15061015
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2015-08-27 Cont ID  
Sent By skennedy Date 2015-08-27 Time 10:48 Rev Time 0.00
Received By skennedy Date 2015-08-27 Time 10:48 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-08-17 Cont ID  
Sent By skennedy Date 2015-08-17 Time 17:20 Rev Time 0.00
Received By skennedy Date 2015-08-17 Time 17:20 Sent To  
Notes
2015-08-17 17:27:381ST REVIEW: FBC 2010
  
 SUBMIT POLE SPEC AND STRUCTURAL CALCULATIONS FOR THE
 LIGHT POLES PER THE NOTES ON SHEET PH1.2. MUST MEET FBC
 CHAPTER 16.
  
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2015-08-11 Cont ID  
Sent By skennedy Date 2015-08-17 Time 17:21 Rev Time 0.00
Received By albarran Date 2015-08-11 Time 10:21 Sent To Z
Notes
2015-08-11 13:18:14ELECTRIC PROVISO TO PERMIT 15061015
 MANDATORY LIGHTING CONTROLS AS REQUIRED BY 2010 FBC-E
 505 SHALL BE IN PLACE FOR FINAL.
 ALL APPLICABLE ELECTRICAL EQUIPMENT SHALL BE MARKED FOR
 ARC-FLASH PROTECTION
  

Review Stop E ELECTRICAL
Rev No 1 Status N Date 2015-07-27 Cont ID  
Sent By albarran Date 2015-07-27 Time 16:17 Rev Time 0.00
Received By albarran Date 2015-07-15 Time 10:38 Sent To  
Notes
2015-07-27 16:08:457/27/15 - I RECEIVED A CALL FROM STEVE ROLLIN OF FAE
 CONSULTING TO DISCUSS THIS PERMIT. I INSTRUCTED HIM TO
 MARK PANEL "HP" ON THE RISER DIAGRAM AND TO INCLUDE A
 DETAILED SCOPE OF WORK ON THE PERMIT AND PLANS TO
 INCLUDE THE WORK FOR THE CHARGING STATION. IF THE SCOPE
 IS FOR A JUCTION BOX FOR A FUTURE CHARGING STATION
 ONLY, INDICATE SO AND I WILL MARK THE PLANS
 ACCORDINGLY. IN SUCH A CASE A SEPARATE PERMIT WILL BE
 REQUIRED FOR THE INSTALLATION OF THE CHARGING STATION.
 OTHERWISE, IF THE CHARGING STATION IS BEING INSTALLED,
 DATA ON IT SHALL ACCOMPANY THE PERMIT APPLICATION.
2015-07-15 11:09:347/15/15 - CONTACTED CONTRACTOR WITH QUESTIONS ON RISER
 DIAGRAM. ON MY DESK WAITING FOR RESPONSE.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-08-27 Cont ID  
Sent By skennedy Date 2015-08-27 Time 10:48 Rev Time 0.00
Received By skennedy Date 2015-08-21 Time 16:29 Sent To Z
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-08-17 Cont ID  
Sent By dhayes Date 2015-08-17 Time 17:21 Rev Time  
Received By skennedy Date 2015-06-23 Time   Sent To E
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2015-08-24 Cont ID  
Sent By skennedy Date 2015-08-27 Time 10:48 Rev Time 0.00
Received By dkittred Date 2015-08-24 Time 12:29 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2015-08-17 Cont ID  
Sent By dkittred Date 2015-08-17 Time 12:24 Rev Time 0.00
Received By dkittred Date 2015-08-17 Time 17:20 Sent To B
Notes
2015-08-17 12:24:54PLANNING AND ZONING COMMENTS: ***FAILED***
  
 8/17/15
  
 1. REVISED PLANS SHOW INCREASED LIGHT SPILLAGE ALONG
 WESTERN BOUNDARY. PLEASE REVISED PLANS TO DEMONSTRATE
 COMPLIANCE WITH ZLDR SEC. 94-207(D)(8) - ILLUMINATION.
 ANY SOURCE OF ILLUMINATION LOCATED WITHIN A COMMERCIAL
 OR INDUSTRIAL PLANNED DEVELOPMENT DISTRICT SHALL NOT
 EXCEED ONE FOOTCANDLE AT OR BEYOND THE BOUNDARIES OF
 SUCH DEVELOPMENT.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT:
  
 DANIELLE J. KITTREDGE, AICP
 SENIOR PLANNER
 PLANNING & ZONING DIVISION
 PHONE: (561)-822-1443
 EMAIL: [email protected]
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved