Plan Review Details - Permit 15060603
Plan Review Stops For Permit 15060603 |
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2015-08-15 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-08-15 |
Time |
05:28 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-08-13 |
Time |
13:43 |
Sent To |
|
|
Notes |
2015-08-13 13:43:55 | RESUB ROUTED TO TKLARGE |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2015-08-15 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2015-06-19 |
Time |
10:30 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-06-19 |
Time |
09:37 |
Sent To |
P |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2015-08-15 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-08-15 |
Time |
05:14 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-08-15 |
Time |
05:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2015-08-15 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-06-19 |
Time |
10:30 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-06-19 |
Time |
10:01 |
Sent To |
|
|
Notes |
2015-06-19 10:29:07 | 1) SUBMIT A ROOF PLAN SHOWING THE LOCATION OF THE ROOF | | DRAINS AND SHOW THE SQUARE FOOTAGE OF THE ROOF THAT IS | | BEING DRAINED INTO EACH DRAIN.WPB AMEND. TO 2010 FBC | | SEC. 107.2.1. | | 2) THE SIZING OF THE ROOF DRAINS AND ALL VERTICAL AND | | HORIZONTAL PIPING SHALL BE SIZED IN ACCORDANCE WITH | | TABLES 1106.2 (1) & 1106.3 FOR A RAINFALL RATE OF 5 | | INCHES PER HOUR. | | 3) INDICATE TYPE OF PIPING TO INSTALLED. IF PVC, IT | | SHALL BE SUPPORTED AT 4 FT.INTERVALS HORIZONTALLY AND | | 10 FT. INTERVALS VERTICALLY. INDICATE ON THE PLANS HOW | | THE PIPE WILL BE SUPPORTED. | | 4) SUBMIT DETAILS FOR SECONDARY (EMERGENCY) DRAINAGE | | PER 2010 FPC SEC.1107.1. | | 5) INDICATE IF THERE IS A PARAPET WALL ON THIS PROJECT. | | IF SO, ONE-HALF THE AREA OF ANY VERTICAL WALL THAT | | DIVERTS RAINWATER TO THE ROOF SHALL BE ADDED TO THE | | PROJECTED ROOF AREA PER 2010 FPC SEC.1106.4. | | 6) SHOW THE TERMINATION POINT OF EACH DRAIN. THE | | VERTICAL LEADERS/CONDUCTORS SHALL DISCHARGE A MINIMUM | | OF ONE (1) FOOT FROM THE STRUCTURE SIDEWALL PER THE | | 2010 FBC SEC.1503.7. SUBMIT A PLAN SHOWING THE | | TERMINATION/DISCHARGE POINTS OF THE LEADERS/CONDUCTORS. | | WPB AMEND. TO 2010 FBC SEC. 107.2.1. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | 2015-06-19 09:38:14 | ROUTED TO PLUMBING/CC |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |