Plan Review Details - Permit 15060516
Plan Review Stops For Permit 15060516
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2015-07-22 Cont ID  
Sent By sgraham Date 2015-07-22 Time 12:17 Rev Time 0.00
Received By skennedy Date 2015-07-22 Time 12:17 Sent To FIRE
Notes
2015-07-22 14:39:09REVIEW BY DAHAYES

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2015-07-16 Cont ID  
Sent By dhayes Date 2015-07-16 Time 09:22 Rev Time 0.00
Received By dhayes Date 2015-07-16 Time 07:53 Sent To  
Notes
2015-07-16 09:22:437/16/2015
 PROJECT: COMMERCE PLACE GENERATOR
 PERMIT#: 15060516
 CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC,
 2010 WPB AMENDMENTS TO THE FBC, CHAPTER ONE,
 ADMINISTRATION, 2012 FBC SUPPLEMENTS.
 1ST ELECTRICAL PLAN REVIEW
 ACTION: DENIED
  
 REVISE YOUR PLANS IN RESPONSE TO THE FOLLOWING REVIEW
 COMMENTS:
  
 1) THE RISER DIAGRAM INDICATES A 225AMP BAREAKER IN THE
 GENERATOR CONNECTED TO A 3/0 FEEDER TO FEED A 200AMP
 RATED ATS. NEITHER THE ATS NOR THE 3/0 FEEDER ARE
 APPROVED FOR A 225AMP. REPLACE THE GENERATOR BREAKER
 WITH A 200AMP MAX. MANUFACTURER SPEC, PLUS NEC 240.4,
 408.36
  
 2) PROVIDE THE REQUIRED SIGNAGE SHALL BE PLACED AT THE
 SERVICE-ENTRANCE EQUIPMENT THAT INDICATES THE TYPE AND
 LOCATION OF ON-SITE OPTIONAL STANDBY POWER SOURCES. NEC
 702.8
  
 3) PROVIDE AN ACCURATE GROUNDING ELECTRODE SYSTEM. YOU
 HAVE INDICATED IN YOUR NOTES THAT THIS IS A MULTI-UNIT
 SERVICE. INDICATE THE SIZE OF THE SERVICE ENTRANCE
 CONDUCTORS AND THE APROPRIATE SERVICE GROUNDING
 ELECTRODE CONDUCTOR BASED ON NEC 250.66
  
 4) YOU HAVE INDICATED ON THE PANEL SCHEDULE PROVIDED
 THAT THERE ARE LOADS TO BE SHED. HOWEVER I DO NOT SEE
 ANY LOAD SHED CAPABILITIES IN THE MAUNUFACTURER PRODUCT
 DATA SHEETS PROVIDED. NEC 702.5
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. SEE LINK:
 HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/
 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF
  
 A THOROUGH REVIEW CANNOT BE MADE AT THIS TIME, AS A
 RESULT OF THE ADDITIONAL INFORMATION REQUESTED
 ADDITIONAL COMMENTS MAY APPEAR THAT WERE NOT PART OF
 THIS REVIEW.
 ADDITIONALLY, IT IS REQUIRED TO INSERT THE CORRECTED
 PAGES INTO THE DENIED SUBMITTAL PACKAGE. VOID THE
 PREVIOUSLY REVIEWED SHEETS AND LEAVE FOR COMPARATIVE
 REVIEW.
 DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421,
 561-805-6717 OR [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2015-07-24 Cont ID  
Sent By pleduc Date 2015-07-24 Time   Rev Time 0.00
Received By pleduc Date 2015-07-24 Time 15:18 Sent To PC
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2015-07-15 Cont ID  
Sent By pleduc Date 2015-07-15 Time   Rev Time 0.00
Received By pleduc Date 2015-07-15 Time 17:10 Sent To E
Notes
2015-07-15 17:22:41THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 PROVIDE BOLLARD PROTECTION Q 3' WITH REFLECTIVE TAPE
 AROUND THE TANK.
  

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2015-07-18 Cont ID  
Sent By tklarge Date 2015-07-18 Time 05:04 Rev Time 0.00
Received By tklarge Date 2015-07-18 Time 04:08 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2015-06-20 Cont ID  
Sent By tklarge Date 2015-06-20 Time 08:23 Rev Time 0.00
Received By tklarge Date 2015-06-20 Time 07:33 Sent To  
Notes
2015-06-20 08:19:031) THE GAS SIZING TABLE FOR THE GASTITE PE PIPE THAT
 HAS BEEN IDENTIFIED ON THE DOCUMENTS IS SHOWN AS A GAS
 PRESSURE OF 10 PSI, YET THE FIRST PAGE OF THE GAS
 DRAWING NOTES AN 11" W.C. CLARIFY. WPB AMEND. TO 2010
 FBC SEC. 107.3.5.1.5.
 2) INDICATE THE PSI ON THE SYSTEM BETWEEN THE TANK AND
 THE 2ND STAGE REGULATOR AND FROM THE 2ND STAGE
 REGULATOR TO THE GENERATOR. THE ONLY PRESSURE INDICATED
 ON THE PLANS IS 11" W.C. CLARIFY.
 3)THE TWO TABLES REFERENCED ON THE GAS RISER DRAWING
 ARE FOR NATURAL GAS. SUBMIT THE CORRECT TABLES FOR THE
 LP GAS AND THE PRESSURES.
 4) THE DOCUMENTS FROM TIE-DOWN ENGINEERING SHALL BEAR
 THE SEAL AND WET SIGNATURE OF THE ENGINEER PER THE FL.
 ADMIN. CODE SEC. 61G15-23.002. THE SUBMITTED DOCUMENTS
 ARE COPIES.
 5) THIS AN ABOVE GROUND TANK AND YOU HAVE ALSO
 SUBMITTED SPECS FOR AN UNDERGROUND TANK. REMOVE ANY
 DOCUMENTS THAT DO NOT APPLY. WPB AMEND. TO 2010 FBC
 SEC. 107.2.1.
 6) THE TANK IS LOCATED IN A TRAFFIC AREA. SUBMIT
 DETAILS AS TO HOW THE TANK IS GOING TO BE PROTECTED IN
 ACCORDANCE WITH NFPA 58 SEC.6.6.6 (D). IF BOLLARDS ARE
 USED SUBMIT DETAILS. SHOW THE HEIGHT OF THE BOOLARDS
 ABOVE GROUND, THE BURIAL DEPTH BELOW GROUND, THE
 DIAMETER, CENTER TO CENTER SPACING, ETC.NFPA 58 SEC.
 6.6.1.2.
 7) THE NOTES WRITTEN ON THE SURVEY ARE DONE IN PECIL.
 PENCILED PLANS ARE UNACCEPTABLE.SUBMIT TWO COPIES OF
 PLANS THAT CANNOT BE ALTERED.
 8) INDICATE THE CORRESPONDING EHD OF THE FLEX LINE FROM
 THE 2ND STAGE REGULATOR TO THE GENERATOR.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-07-24 Cont ID  
Sent By pleduc Date 2015-07-24 Time   Rev Time 0.00
Received By pleduc Date 2015-07-17 Time 14:30 Sent To  
Notes
2015-07-17 14:30:22TLARGE DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-07-16 Cont ID  
Sent By dhayes Date 2015-07-16 Time 09:23 Rev Time 0.00
Received By dhayes Date 2015-06-11 Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2015-06-12 Cont ID  
Sent By sgraham Date 2015-06-12 Time 11:56 Rev Time 0.00
Received By sgraham Date 2015-06-12 Time 11:56 Sent To E
Notes
***NONE***