Plan Review Details - Permit 15051221
Plan Review Stops For Permit 15051221
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2015-06-12 Cont ID  
Sent By tmoore Date 2015-06-12 Time 16:28 Rev Time 0.00
Received By tmoore Date 2015-06-12 Time 16:28 Sent To  
Notes
2015-06-12 16:28:18RECEIVED OUTSTANDING GAS RELEASE AND SEWER LATERALS ARE
 NOW CAPPED. OK TO ISSUE WITH ENGINEERING AND HISTORICS
 APPROVAL. TM

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-06-02 Cont ID  
Sent By tmoore Date 2015-06-02 Time 08:49 Rev Time 0.00
Received By tmoore Date 2015-06-02 Time 08:48 Sent To ENG
Notes
2015-06-02 08:49:29MET CONTRACTOR ON SITE AFTER MEETING UTILITIES
 DEPARTMENT. OUTSANDING UTILITY RELEASES REMAIN AND
 SEWER LATERAL CAPPING NOT COMPLETE. MOVING TO
 ENGINEERING FOR THEIR REVIEW.

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2015-06-19 Cont ID  
Sent By cranford Date 2015-06-19 Time 15:39 Rev Time 0.00
Received By cranford Date 2015-06-19 Time 15:39 Sent To  
Notes
2015-06-19 15:39:37BOND RECEIVED. PUT IN EDS SAFE.
  
 KELLY CRANFORD

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2015-06-03 Cont ID  
Sent By cranford Date 2015-06-03 Time 08:43 Rev Time 0.00
Received By cranford Date 2015-06-03 Time 08:39 Sent To HIST
Notes
2015-06-03 08:43:491. A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) MUST
 BE SUBMITTED. THE PLAN WILL NEED TO ADDRESS PREVENTING
 TURBID WATER, DIRT, DUST AND OTHER CONSTRUCTION DEBRIS
 FROM LEAVING THE SITE EXCEPT IN SEALED CONTAINERS.
 GUIDELINES FOR PREPARING THE SWPPP ARE UNDER:
 HTTP://WPB.ORG/WP-CONTENT/UPLOADS/SITES/7/2012/05/2011-
 12-21-15-00-29-SWPPPGUIDE.PDF
  
 2. APPLICANTS FOR DEMOLITION AND/OR BUILDING PERMITS TO
 PERFORM LAND DISTURBING CONSTRUCTION AND LAND
 DEVELOPMENT ACTIVITIES SHALL SUBMIT A BOND OR DEPOSIT
 IN AN AMOUNT COVERING THE COST ASSOCIATED WITH
 IMPLEMENTATION OF THE SWPPP AND LAND STABILIZATION OF
 THE SITE. PLEASE SUBMIT A COPY OF THE AUTOCALC
 CERTIFIED COST ESTIMATE FORM AND A BOND FOR THE
 IMPLEMENTATION OF THE SWPPP AND LAND STABILIZATION OF
 THE SITE.
 HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/ THE
 BOND WILL BE RELEASED UPON APPROVED INSPECTION OF
 TIE-BEAMS OR SIMILAR VERTICAL CONSTRUCTION. (CITY CODE
 SECTION 94-450)
  
 KELLY CRANFORD, P.E.
 LAND DEVELOPMENT ENGINEER
 PUBLIC WORKS DEPARTMENT
 CITY OF WEST PALM BEACH
 [email protected]
 561-494-1098 (OFFICE)

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2015-06-08 Cont ID  
Sent By fmittner Date 2015-06-08 Time 10:14 Rev Time 0.00
Received By fmittner Date 2015-06-08 Time 10:14 Sent To  
Notes
***NONE***