Plan Review Details - Permit 15051119
Plan Review Stops For Permit 15051119
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2015-07-27 Cont ID  
Sent By rmcdouga Date 2015-07-27 Time 07:45 Rev Time 0.00
Received By rmcdouga Date 2015-07-27 Time 07:45 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-06-26 Cont ID  
Sent By rmcdouga Date 2015-06-26 Time 07:32 Rev Time 0.00
Received By rmcdouga Date 2015-06-26 Time 07:31 Sent To  
Notes
2015-06-26 07:33:50PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC 2010
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) SUBMIT TWO COPIES OF AN UP TO DATE SURVEY AS
 REQUESTED BY ZONING REVIEW. FBC 107.2.1

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2015-06-26 Cont ID  
Sent By rmcdouga Date 2015-06-26 Time 07:35 Rev Time 0.00
Received By rmcdouga Date 2015-06-26 Time 07:35 Sent To  
Notes
2015-06-26 07:56:20APPROVED WITH EXCEPTION. THIS PLAN HAS BEEN APPROVED
 PROVISIONALLY. FAILURE TO CORRECT THE LISTED
 DEFICIENCIES IN THIS PLAN PRIOR TO INSPECTION WILL
 RESULT IN FAILED INSPECTION(S) AND ASSESSMENT OF
 RE-INSPECTION FEE(S).
 1) AN ELECTRICAL PERMIT IS REQUIRED. FBC 105.1
 2) THE NEW POOL EQUIPMENT AND DECK IS REQUIRED TO BE
 BONDED IN ACCORDANCE WITH 2008 NEC 680.26.
  

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2015-06-04 Cont ID  
Sent By tklarge Date 2015-06-04 Time 09:10 Rev Time 0.00
Received By tklarge Date 2015-06-04 Time 09:10 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-07-30 Cont ID  
Sent By tklarge Date 2015-07-30 Time 14:15 Rev Time 0.00
Received By tklarge Date 2015-07-30 Time 14:15 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-07-27 Cont ID  
Sent By rmcdouga Date 2015-07-27 Time 07:45 Rev Time 0.00
Received By rmcdouga Date 2015-07-07 Time 13:14 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-06-26 Cont ID  
Sent By rmcdouga Date 2015-06-26 Time 07:35 Rev Time 0.00
Received By rmcdouga Date 2015-05-28 Time 17:05 Sent To  
Notes
2015-06-03 08:18:456/3 TO POOL BOX
  
2015-05-28 17:05:195/28 TO ZONING
 (DISREGARD PREVIOUS NOTE)
2015-05-27 18:33:55SENT TO ELECTRICAL UNDER $5000 SHELF FOR REVIEW. JG.

Review Stop P PLUMBING
Rev No 3 Status P Date 2015-07-30 Cont ID  
Sent By tklarge Date 2015-07-30 Time 14:16 Rev Time 0.00
Received By tklarge Date 2015-07-30 Time 14:15 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2015-07-27 Cont ID  
Sent By tklarge Date 2015-07-27 Time 08:16 Rev Time 0.00
Received By tklarge Date 2015-07-27 Time 08:16 Sent To  
Notes
2015-07-27 08:18:05NONE OF THE PLUMBING REVIEW COMMENTS FROM THE PREVIOUS
 REVIEW DONE ON 6/4/15 HAVE BEEN ADDRESSED. SEE BELOW.
  
 THE WORK INVOICE NOTES " INSTALL EQUIPMENT (EQUIPMENT
 SUPPLIED). INDICATE IF THIS IS THE REMOVAL AND
 REINSTALLING THE EXISTING EQUIPMENT OR IF THIS IS THE
 REPLACEMENT OF THE EXISTING WITH NEW. INDICATE IF A
 POOL HEATER WILL BE INSTALLED.IF A NEW PUMP IS BEING
 INSTALLED, INDICATE IF IT IS THE SAME SIZE, IF IT IS A
 LARGER PUMP, SUBMIT MANUFACTURER'S SPEC SHEETS AND A
 COPY OF THE PUMP CURVE FOR TOTAL DYNAMIC HEAD AND GPM
 FLOW.SUBMIT DETAILS OF THE PIPNG FOR THE MAIN DRAINS
 (PIPE SIZES). THE FLOW THROUGH THE SYSTEM SHALL COMPLY
 W/ FBC-RESIDENTIAL. SEC.R4101.6.3.
  
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2015-06-04 Cont ID  
Sent By tklarge Date 2015-06-04 Time 09:10 Rev Time 0.00
Received By tklarge Date 2015-06-04 Time 09:00 Sent To  
Notes
2015-06-04 09:10:041) THE WORK INVOICE NOTES " INSTALL EQUIPMENT
 (EQUIPMENT SUPPLIED). INDICATE IF THIS IS THE REMOVAL
 AND REINSTALLING THE EXISTING EQUIPMENT OR IF THIS IS
 THE REPLACEMENT OF THE EXISTING WITH NEW. INDICATE IF A
 POOL HEATER WILL BE INSTALLED.IF A NEW PUMP IS BEING
 INSTALLED, INDICATE IF IT IS THE SAME SIZE, IF IT IS A
 LARGER PUMP, SUBMIT MANUFACTURER'S SPEC SHEETS AND A
 COPY OF THE PUMP CURVE FOR TOTAL DYNAMIC HEAD AND GPM
 FLOW.SUBMIT DETAILS OF THE PIPNG FOR THE MAIN DRAINS
 (PIPE SIZES). THE FLOW THROUGH THE SYSTEM SHALL COMPLY
 W/ FBC-RESIDENTIAL. SEC.R4101.6.3.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status P Date 2015-07-10 Cont ID  
Sent By sgraham Date 2015-07-10 Time 09:27 Rev Time 0.00
Received By sgraham Date 2015-07-10 Time 09:27 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2015-06-02 Cont ID  
Sent By sgraham Date 2015-06-02 Time 08:53 Rev Time 0.00
Received By sgraham Date 2015-06-02 Time 08:53 Sent To B
Notes
2015-06-02 08:54:446/2/15 ZONING FAILED
  
 1. SUBMIT TWO UP TO DATE SURVERYS SHOWING LOCATION OF
 ALL EQUIPMENT