Plan Review Details - Permit 15051048
Plan Review Stops For Permit 15051048
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2015-09-10 Cont ID  
Sent By jwitmer Date 2015-09-10 Time 14:11 Rev Time 0.00
Received By jwitmer Date 2015-09-10 Time   Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2015-06-09 Cont ID  
Sent By jwitmer Date 2015-06-09 Time 17:36 Rev Time  
Received By jwitmer Date 2015-06-09 Time 15:44 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2015-09-28 Cont ID  
Sent By skennedy Date 2015-09-28 Time 10:50 Rev Time 0.00
Received By skennedy Date 2015-09-28 Time 10:48 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2015-06-04 Cont ID  
Sent By rlecky Date 2015-06-04 Time 12:05 Rev Time 0.00
Received By rlecky Date 2015-06-04 Time 12:00 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2015-08-31 Cont ID  
Sent By pleduc Date 2015-08-31 Time   Rev Time 0.00
Received By pleduc Date 2015-08-31 Time 10:43 Sent To  
Notes
2015-08-31 10:44:22THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE
 5TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING
 THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER
 APPLICABLE CODES OR STANDARDS.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2015-05-28 Cont ID  
Sent By pleduc Date 2015-05-28 Time   Rev Time 0.00
Received By pleduc Date 2015-05-28 Time 12:17 Sent To  
Notes
2015-05-28 12:40:09THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE
 5TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING
 THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER
 APPLICABLE CODES OR STANDARDS.
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-09-28 Cont ID  
Sent By skennedy Date 2015-09-28 Time 10:50 Rev Time 0.00
Received By skennedy Date 2015-08-28 Time 10:11 Sent To  
Notes
2015-08-28 10:30:55B08

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-06-22 Cont ID  
Sent By tklarge Date 2015-06-22 Time 06:43 Rev Time 0.00
Received By tklarge Date 2015-06-19 Time 17:19 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status F Date 2015-06-09 Cont ID  
Sent By jwitmer Date 2015-06-09 Time 17:46 Rev Time  
Received By jwitmer Date 2015-05-22 Time   Sent To  
Notes
2015-05-22 17:21:50B04

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status N Date 2015-06-09 Cont ID  
Sent By jwitmer Date 2015-06-09 Time 17:36 Rev Time 0.00
Received By jwitmer Date 2015-06-09 Time 17:36 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2015-09-09 Cont ID  
Sent By tklarge Date 2015-09-09 Time 13:14 Rev Time 0.00
Received By tklarge Date 2015-09-09 Time 06:20 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2015-06-22 Cont ID  
Sent By tklarge Date 2015-06-22 Time   Rev Time 0.00
Received By tklarge Date 2015-06-22 Time 06:07 Sent To  
Notes
2015-06-22 06:16:341) THE RELIEF VENT SHOWN IS UNACCEPTABLE AS DRAWN. IT
 DOES NOT MEET THE INTENT OF THE PLUMBING CODE. WHERE
 AND WHAT DOES IT CONNECT TO? COMPLY W/2010 FPC
 SEC.917.3.2.
 2) SUBMIT THE CALCULATIONS THAT YOU USED TO SIZE THE
 GREASE TRAP UNDER THE 3 COMPARTMENT SINK. I ASKED FOR
 THIS ON MY LAST REVIEW. 2ND REQUEST.
 3) IN MY LAST REVIEW I STATED THAT THE STACK FOR THE
 MOP SINK WAS A THREE INCH STACK. THE STACK IS A
 CONTINUOUS 3 INCH STACK, NOT A 3 INCH STACK WITH A 2
 INCH VENT.
 4) SUBMIT A WATER RISER FOR THE NEW MOP SINK. WPB
 AMEND. TO 2010 FBC SEC. 107.3.5.1.3. 2ND REQUEST.
 5INDICATE ON THE PLANS IF ANY COOKING WILL BE DONE ON
 THE PREMISES AND IF SO SHOW ALL EQUIPMENT ON THE PLANS.
 2ND REQUEST.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2015-06-09 Cont ID  
Sent By tklarge Date 2015-06-09 Time 16:56 Rev Time 0.00
Received By tklarge Date 2015-06-09 Time 16:24 Sent To  
Notes
2015-06-09 16:56:271) THE PLANS NOTE THE SCOPE OF PLUMBING WORK TO ADD A
 WASHING MACHINE AND A TANKLESS WATER HEATER. THERE IS
 NO TANKLESS WATER HEATER OR WASHING MACHINE SHOWN ON
 THE PLANS. CLARIFY.
 2) SUBMIT A WATER RISER DIAGRAM FOR REVIEW. WPB AMEND.
 TO 2010 FBC SEC. 107.3.5.1.3.
 3) THE PLANS SHOW THE OCCUPANCY AS MERCANTILE. INDICATE
 ON THE PLANS WHAT WILL BE SOLD. THE PLANS SHOW A NEW
 PREP TABLE. WILL THERE BE ANY TYPE OF FOOD PREPARATION
 OR COOKING DONE ON THE PREMISES? INDICATE ON THE
 PLANS.WPB AMEND. TO 2010 FBC SEC. 107.2.1.
 4) A GREASE REMOVAL DEVICE MAY BE REQUIRED DEPENDENT
 UPON THE TYPE OF GOODS BEING PREPARED. SUBMIT
 CALCULATIONS FOR A GREASE TRAP/ INTERCEPTOR IN
 ACCORDANCE WITH FBC-PLUMBING SEC.1003.3.1.
 5) THE NEW HAND SINK IS SHOWN CONNECTING TO AN EXISTING
 2" STACK. UPON RESEARCH OF CITY RECORDS, THIS STACK
 APPEARS TO BE AN EXISTING 3"STACK. REVISE.
 6) SINCE THIS IS A MULTI-STORY BUILDING, THE USE OF A
 AIR ADMITTANCE VALVE ON THE MOP SINK WILL REQUIRE A
 RELIEF VENT IN ACCORDANCE WITH 2010 FBC-PLUMBING
 SEC.917.3.2 OR REVISE THE DESIGN TO A STACK & VENT
 SYSTEM.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved