Plan Review Stops For Permit 15050732 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2015-06-06 |
|
|
Cont ID |
|
Sent By |
jwitmer |
Date |
2015-06-06 |
Time |
16:42 |
Rev Time |
0.00 |
Received By |
jwitmer |
Date |
2015-06-06 |
Time |
16:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2015-05-26 |
|
|
Cont ID |
|
Sent By |
rlecky |
Date |
2015-05-26 |
Time |
13:23 |
Rev Time |
0.00 |
Received By |
rlecky |
Date |
2015-05-26 |
Time |
13:14 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2015-05-29 |
|
|
Cont ID |
|
Sent By |
scaldero |
Date |
2015-05-29 |
Time |
11:22 |
Rev Time |
0.00 |
Received By |
scaldero |
Date |
2015-05-29 |
Time |
11:22 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2015-06-20 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-06-20 |
Time |
08:57 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-06-19 |
Time |
16:58 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2015-06-18 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-06-18 |
Time |
08:00 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-06-12 |
Time |
15:41 |
Sent To |
|
|
Notes |
2015-06-15 15:43:19 | SENT TO CHRIS COLE FOR MECHANICAL REVIEW. JG. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2015-06-18 |
|
|
Cont ID |
|
Sent By |
ajones |
Date |
2015-06-18 |
Time |
08:01 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-05-18 |
Time |
18:29 |
Sent To |
|
|
Notes |
2015-05-18 17:42:46 | SENT TO B03. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2015-06-16 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2015-06-16 |
Time |
13:42 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2015-06-16 |
Time |
13:42 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2015-06-10 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2015-06-10 |
Time |
15:09 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2015-06-10 |
Time |
15:09 |
Sent To |
|
|
Notes |
2015-06-10 15:43:17 | 1ST REVIEW: FBC 2010 MECHANICAL | | | | 1) MINIMUM VENTILATION CALCULATIONS ARE REQUIRED FOR | | THE PROPOSED NEW FOOT MASSAGE BUSINESS IN COMPLIANCE | | WITH SECTION 709.1 FBC-10 EXISTING BUILDING. PLEASE SEE | | TABLE 403.3 FBC-10 MECHANICAL AND PROVIDE A TABLE ON | | THE PLAN INDICATING THE TOTAL CFM'S OF REQUIRED OUTDOOR | | AIR, AND THE TOTAL OUTDOOR AIR THAT IS BEING PROVIDED | | TO THE SPACES BY THE EXISTING SYSTEMS, OR BY ANY | | PROPOSED NEW SYSTEMS. | | 2) PROVIDE AN AC LAYOUT PLAN INDICATING THE LOCATIONS | | OF ALL SUPPLY AND RETURN DUCTS, DIFFUSERS AND GRILLS. | | PROVIDE NOTES AND SYMBOLS ON THE PLAN TO CLEARLY | | INDICATE WHAT COMPONENTS ARE EXISTING, RELOCATED, OR | | NEWLY INSTALLED. | | 3) PLEASE REMOVE THE SUBMITTED MANUAL J AC | | CALCULATIONS. ACCA MANUAL J IS A CALCULATION METHOD FOR | | RESIDENTIAL AC SYSTEMS. IF NEW AC SYSTEM IS PROPOSED, | | THE SIZING CALCULATION SHALL BE PERFORMED IN ACCORDANCE | | WITH ACCA MANUAL N OR ASHRAE STANDARD 183- SECTION | | 503.2.1 FBC-10 ENERGY CONSERVATION | | | | CHRISTOPHER COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] | | | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2015-06-20 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-06-20 |
Time |
08:57 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-06-20 |
Time |
08:45 |
Sent To |
|
|
Notes |
2015-06-19 16:59:10 | ROUTED TO PLUMBING/CC |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2015-06-18 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-06-18 |
Time |
08:00 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-06-18 |
Time |
06:50 |
Sent To |
|
|
Notes |
2015-06-18 08:00:06 | 1) SHT. S-1 - ZONING & OCCUPANCY BOX - SHOWS THE | | OCCUPANCY TYPE AS MERCANTILE AND THE GENERAL BUILDING | | CODE ANALYSIS BOX ON E-1 NOTES THE OCCUPANCY AS | | BUSINESS.CLARIFY. ALSO, THE INFORMATION IN THE GENERAL | | BUILDING CODE ANALYSIS BOX ON SHT. E-1 DOES NOT APPEAR | | TO BE FOR THIS SPACE. THE TENANT SPACE IS LISTED AS | | 6300 SQ.FT. AND SHT. S-1 NOTES THIS SPACE AS 1300 SQ. | | FT. IF DOES NOT APPLY TO THIS SPACE THEN DELETE IT FROM | | THE PLANS. | | 2) THIS OCCUPANCY SHALL BE CLASSIFIED PER SEC. 302 OF | | THE 2010 - FBC-BUILDING.INDICATE THE CORRECT OCCUPANCY | | ON BOTH SHEETS OF BOTH SETS OF PLANS. | | 3) THERE IS ALSO A DISCREPANCY IN THE TYPE OF | | CONSTRUCTION ON THE PLANS.SHT. S-1 NOTES THE TYPE OF | | CONSTRUCTION AS TYPE III ( IN THE ZONING & OCCUPANCY | | BOX) & AS TYPE IIB ( IN THE CODE INFORMATION BOX). WHAT | | TYPE OF CONSTRUCTION IS IT? SHT. E-1 SHOWS THE TYPE OF | | CONSTRUCTION AS IIB IN THE GENERAL BUILDING CODE | | ANALYSIS BOX. THE TYPE OF CONSRTUCTION SHALL BE THE | | SAME ON ALL SHEETS. REVISE THE INFORMATION ON ALL | | SHEETS TO MATCH. | | 4) THE NEW P-1 SHEET THAT WAS SUBMITTED SHOWS THE | | OCCUPANCY CLASSIFICATION AS "BUSINESS" AND | | "MERCANTILE". CLARIFY. THIS DOES NOT APPEAR TO BE A | | MIXED OCCUPANCY AND IT IS NOT A MERCANTILE | | OCCUPANCY.REVISE ALL THE SHEETS TO REFLECT THE CORRECT | | OCCUPANCY OF THIS SPACE AND THE CORRECT TYPE OF | | CONSTRUCTION. | | 5) THE FLOOR DRAIN SHALL BE EQUIPPED WITH A FLOOR | | DRAIN.SHOW THIS ON THE PLAN. | | 6) THERE IS NO CONNECTION OF THE HOT WATER LINE SHOWN | | AT THE HOT WATER HEATER. CLARIFY. | | | | NOTE: CORRECTIONS SHALL BE MADE TO ALL THE SHEETS ON | | BOTH SETS OF PLANS. | | | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2015-06-09 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-06-09 |
Time |
09:48 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-06-09 |
Time |
09:15 |
Sent To |
|
|
Notes |
2015-06-09 09:28:01 | 1) SUBMIT A WATER RISER FOR REVIEW. WPB AMEND. TO 2010 | | FBC SEC. 107.3.5.1.3. | | 2) THE WASHING MACHINE SHALL BE ON A 3 INCH STACK PER | | THE 2010 FPC SEC.406.3. | | 3) SUBMIT MANUFACTURER'S SPECIFICATIONS/INSTALLATION | | MANUAL FOR THE TANKLESS WATER HEATER. WPB AMEND.TO 2010 | | FBC SEC. 107.2.1. | | 4) CLEANOUTS ARE REQUIRED IN WASTE STACKS PER 2010 FPC | | SEC.708.3.4. | | 5) THE SINK IN THE BREAK ROOM SHALL COMPLY WITH THE FL. | | ACCESS. CODE SEC. 212, 606.1- 606.5. THE MAXIMUM HEIGHT | | SHALL BE 34 INCHES. SHOW THIS ON BOTH SETS OF PLANS. | | 6) SHT. S-1 SHOWS THE OCCUPANCY TYPE AS MERCANTILE AND | | THE GENERAL BUILDING CODE ANALYSIS BOX ON E-1 NOTES THE | | OCCUPANCY AS BUSINESS.CLARIFY. ALSO, THE BOX ON SHT. | | E-1 DOES NOT APPEAR TO BE FOR THIS SPACE. THE TENANT | | SPACE IS LISTED AS 6300 SQ.FT. AND SHT. S-1 NOTES THIS | | SPACE AS 1300 SQ. FT.THERE IS ALSO A DIS | | 7) THIS OCCUPANCY SHALL BE CLASSIFIED PER SEC. 302 OF | | THE 2010 - FBC-BUILDING.INDICATE THE CORRECT OCCUPANCY | | ON BOTH SHEETS OF BOTH SETS OF PLANS. | | 8) THERE IS ALSO A DISCREPANCY IN THE TYPE OF | | CONSTRUCTION ON THE PLANS.SHT. S-1 NOTES THE TYPE OF | | CONSTRUCTION AS TYPE III (ZONING 7 OCCUPANCY BOX) & AS | | TYPE IIB (CODE INFORMATION BOX) AND AS TYPE IIB ON SHT. | | E-1. CLARIFY. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2015-05-29 |
|
|
Cont ID |
|
Sent By |
ajones |
Date |
2015-05-29 |
Time |
08:40 |
Rev Time |
0.00 |
Received By |
ajones |
Date |
2015-05-29 |
Time |
08:40 |
Sent To |
|
|
Notes |
|
|