Plan Review Stops For Permit 15050695 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
6 |
Status |
P |
Date |
2016-04-05 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2016-04-05 |
Time |
11:35 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2016-04-05 |
Time |
11:35 |
Sent To |
E |
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
P |
Date |
2016-03-08 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2016-03-08 |
Time |
13:31 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2016-03-08 |
Time |
13:31 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
F |
Date |
2016-01-19 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2016-01-19 |
Time |
14:57 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2016-01-19 |
Time |
14:57 |
Sent To |
|
|
Notes |
2016-01-19 15:07:53 | CHRISTOPHER S. THROOP, C.B.O. | | BLDG. PLANS EXAMINER ? PX3169 | | (561) 805-6718 | | [email protected] | | | | 4TH BUILDING REVIEW. | | | | THE FOLLOWING REVIEW COMMENTS FROM THE PREVIOUS THREE | | (3) REVIEWS HAVE NOT BEEN ADDRESSED. | | FLORIDA STATUTE 553.80 (2) (B) MANDATES THE APPLICATION | | OF 4 TIMES THE ORIGINAL PLAN REVIEW FEE BE APPLIED TO | | THIS APPLICATION. | | | | PROVIDE RESPONSES TO THE FOLLOWING ITEMS: | | 1. ROOFING - PROVIDE PRODUCT APPROVALS. | | 2. PROVIDE DETAIL FOR NEW CONCRETE FLOOR. | | 3. PROVIDE DETAIL FOR THE APPLICATION OF STUCCO. | | 4. PROVIDE DETAIL FOR ROOF OVERHANG. | | 5. CONFLICT BETWEEN SHEET A-1, BLDG. C "NEW WORK" AND | | SHEET E-1, BLDG. C "NO CHANGES". | | 6. CONFLICT BETWEEN INSULATION VALUES ON PLAN -VS- | | ENERGY SUBMITTAL. | | | | NOTE: THIS PLAN REMAINS DEFICIENT. ENGINEER OF RECORD | | SHOULD FULLY RE-EVALUATE PLAN PRIOR TO RE-SUBMITTAL. | | | | 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. | | CONSTRUCTION DOCUMENTS SHALL BE DIMENSIONED AND DRAWN | | UPON SUITABLE MATERIAL. CONSTRUCTION DOCUMENTS SHALL BE | | OF SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE | | AND EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT | | IT WILL CONFORM TO THE PROVISIONS OF THIS CODE AND | | RELEVANT LAWS, ORDINANCES, RULES AND REGULATIONS, AS | | DETERMINED BY THE BUILDING OFFICIAL. SUCH DRAWINGS AND | | SPECIFICATIONS SHALL CONTAIN INFORMATION, IN THE FORM | | OF NOTES OR OTHERWISE, AS TO THE QUALITY OF MATERIALS, | | WHERE QUALITY IS ESSENTIAL TO CONFORMITY WITH THE | | TECHNICAL CODES. SUCH INFORMATION SHALL BE SPECIFIC, | | AND THE TECHNICAL CODES SHALL NOT BE CITED AS A WHOLE | | OR IN PART, NOR SHALL THE TERM "LEGAL" OR ITS | | EQUIVALENT BE USED AS A SUBSTITUTE FOR SPECIFIC | | INFORMATION. ALL INFORMATION, DRAWINGS, SPECIFICATIONS | | AND ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE | | OF THE PERSON RESPONSIBLE FOR THE DESIGN. (SEE ALSO | | SECTION 107.3.5). | | | | FBC 107.3.4 - PROVIDE PRODUCT APPROVALS FOR THOSE | | PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED | | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. | | SPECIFICALLY, PROVIDE ROOFING SUBMITTALS. | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2015-10-02 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2015-10-02 |
Time |
10:45 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2015-10-02 |
Time |
09:19 |
Sent To |
|
|
Notes |
2015-10-02 10:42:53 | 3RD REVIEW: FBC 2010 | | | | THE PLANS DO NOT CONTAIN SUFFICIENT CLARITY TO INDICATE | | THE WORK PROPOSED OR SHOW IN DETAIL THAT IT WILL | | CONFORM TO THE PROVISIONS OF THIS CODE AND RELEVANT | | LAWS, ORDINANCES, RULES AND REGULATIONS | | | | FBC 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. | | CONSTRUCTION DOCUMENTS SHALL BE DIMENSIONED AND DRAWN | | UPON SUITABLE MATERIAL. ELECTRONIC MEDIA DOCUMENTS | | SHALL BE SUBMITTED WHEN APPROVED BY THE BUILDING | | OFFICIAL. CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT | | CLARITY TO INDICATE THE LOCATION, NATURE AND EXTENT OF | | THE WORK PROPOSED AND SHOW IN DETAIL THAT IT WILL | | CONFORM TO THE PROVISIONS OF THIS CODE AND RELEVANT | | LAWS, ORDINANCES, RULES AND REGULATIONS, AS DETERMINED | | BY THE BUILDING OFFICIAL. SUCH DRAWINGS AND | | SPECIFICATIONS SHALL CONTAIN INFORMATION, IN THE FORM | | OF NOTES OR OTHERWISE, AS TO THE QUALITY OF MATERIALS, | | WHERE QUALITY IS ESSENTIAL TO CONFORMITY WITH THE | | TECHNICAL CODES. SUCH INFORMATION SHALL BE SPECIFIC, | | AND THE TECHNICAL CODES SHALL NOT BE CITED AS A WHOLE | | OR IN PART, NOR SHALL THE TERM "LEGAL" OR ITS | | EQUIVALENT BE USED AS A SUBSTITUTE FOR SPECIFIC | | INFORMATION. ALL INFORMATION, DRAWINGS, SPECIFICATIONS | | AND ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE | | OF THE PERSON RESPONSIBLE FOR THE DESIGN. (SEE ALSO | | SECTION 107.3.5). | | | | PLEASE RESOLVE THE FOLLOWING CONFLICTS OR PROVIDE | | ADDITIONAL DETAIL IN THE SUBMITTED DRAWINGS AS FOLLOWS: | | | | 1. INCORPORATE SHEET S-0 INTO THE DRAWING SET IF IT IS | | INTENDED THAT IT REMAIN PART OF THE SUBMITTAL. | | 2. SHEET S-0 INDICATES BUILDING C WILL HAVE NO WORK | | DONE ON IT YET SHEET S-1 STATES "NEW WORK IN THIS | | BUILDING." | | 3. SHEET S-1 FLOOR PLAN SHOWS A SECTION A IS ON SHEET | | S-1 BUT NO SECTION A EXIST. | | 4. SHEET S-1 INDICATES NEW CONCRETE FLOOR BUT HAS NO | | DETAIL. | | 5. INSULATION VALUES ON PLAN V. ENERGY SUBMITTAL | | CONFLICT. | | 6. INADEQUATE DETAILS ARE PROVIDED FOR THE APPLICATION | | OF STUCCO. | | 7. COVERED PATION FOUNDATION DETAILS LACK BASIC | | REEQUIRED INFORMATION. | | 8. ELEVATIONS AND DETAILS PROVIDED ARE NOT COORDINATED | | WITH PLAN. | | | | NOTE; IN GENERAL, THIS PLAN IS DEFICIENT TO THE POINT | | THAT A REVIEW CANNOT BE EFFICIENTLY PERFORMED. IT IS | | SUFFICIENT TO STATE THAT THE ENGINERE OF RECORD SHOULD | | FULLY RE-EVALUATE THIS PLAN. | | | | | | GENERAL COMMENTS FROM 1ST & 2ND REVIEW ARE BELOW: | | | | | | MINIMUM PLAN REVIEW CRITERIA SHALL BE PROVIDED PER FBC | | 107 TO INCLUDE BUT NOT LIMITED TO: | | | | 1.AN ENERGY SUBMITTAL | | | | 2.PRODUCT APPROVALS FOR WINDOWS & ROOFING FBC 107.3.4 - | | PROVIDE PRODUCT APPROVALS FOR THOSE PRODUCTS WHICH ARE | | REGULATED BY | | FAC RULE 9N-3 REVIEWED AND APPROVED IN WRITING BY THE | | DESIGNER OF RECORD. SPECIFICALLY, PROVIDE ROOFING, | | WINDOW, AND DOOR SUBMITTALS. | | | | 3.STRUCTURAL DETAILS FOR THE NEW OVERHANGS | | | | 4. OPEN CONDITION WHERE EXISTING SHUTTERS ARE PROPOSED | | TO BE REMOVED | | | | STEVEN KENNEDY, CBO | | CHIEF PLANS EXAMINER | | (561) 805-6710 | | [email protected] | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2015-08-07 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2015-08-07 |
Time |
13:07 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2015-08-07 |
Time |
13:07 |
Sent To |
|
|
Notes |
2015-08-07 13:12:15 | 2ND REVIEW: FBC 2010 | | | | THE REVIEW COMMENTS FROM THE FIRST REVIEW WERE NOT | | ADDRESSED. ONE SHEET WAS RE-SUBMITTED AND WAS RETRIEVED | | BY THE APPLICANT THIS DATE. ESSIENTIALLY, THE | | RE-SUBMITTAL ACCOMPLISHED NOTHING EXCEPT A MEETING SUCH | | THAT THE INADEQUACY OF THE INITIAL SUBMITTAL AND THE | | RE-SUBMITTAL COULD BE EXPLAINED TO THE DRAFTSMAN AND | | THE CONTRACTOR REPRESENTATIVE. | | | | STEVEN KENNEDY, CBO | | CHIEF PLANS EXAMINER | | (561) 805-6710 | | [email protected] | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2015-07-08 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2015-07-08 |
Time |
15:10 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2015-07-08 |
Time |
14:07 |
Sent To |
|
|
Notes |
2015-07-08 15:30:56 | 1ST REVIEW: FBC 2010 | | | | THE PLANS DO NOT CONTAIN SUFFICIENT CLARITY TO INDICATE | | THE WORK PROPOSED OR SHOW IN DETAIL THAT IT WILL | | CONFORM TO THE PROVISIONS OF THIS CODE AND RELEVANT | | LAWS, ORDINANCES, RULES AND REGULATIONS | | | | FBC 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. | | CONSTRUCTION DOCUMENTS SHALL BE DIMENSIONED AND DRAWN | | UPON SUITABLE MATERIAL. ELECTRONIC MEDIA DOCUMENTS | | SHALL BE SUBMITTED WHEN APPROVED BY THE BUILDING | | OFFICIAL. CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT | | CLARITY TO INDICATE THE LOCATION, NATURE AND EXTENT OF | | THE WORK PROPOSED AND SHOW IN DETAIL THAT IT WILL | | CONFORM TO THE PROVISIONS OF THIS CODE AND RELEVANT | | LAWS, ORDINANCES, RULES AND REGULATIONS, AS DETERMINED | | BY THE BUILDING OFFICIAL. SUCH DRAWINGS AND | | SPECIFICATIONS SHALL CONTAIN INFORMATION, IN THE FORM | | OF NOTES OR OTHERWISE, AS TO THE QUALITY OF MATERIALS, | | WHERE QUALITY IS ESSENTIAL TO CONFORMITY WITH THE | | TECHNICAL CODES. SUCH INFORMATION SHALL BE SPECIFIC, | | AND THE TECHNICAL CODES SHALL NOT BE CITED AS A WHOLE | | OR IN PART, NOR SHALL THE TERM "LEGAL" OR ITS | | EQUIVALENT BE USED AS A SUBSTITUTE FOR SPECIFIC | | INFORMATION. ALL INFORMATION, DRAWINGS, SPECIFICATIONS | | AND ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE | | OF THE PERSON RESPONSIBLE FOR THE DESIGN. (SEE ALSO | | SECTION 107.3.5). | | | | MINIMUM PLAN REVIEW CRITERIA SHALL BE PROVIDED PER FBC | | 107 TO INCLUDE BUT NOT LIMITED TO: | | | | 1.AN ENERGY SUBMITTAL | | | | 2.PRODUCT APPROVALS FOR WINDOWS & ROOFING FBC 107.3.4 - | | PROVIDE PRODUCT APPROVALS FOR THOSE PRODUCTS WHICH ARE | | REGULATED BY | | FAC RULE 9N-3 REVIEWED AND APPROVED IN WRITING BY THE | | DESIGNER OF RECORD. SPECIFICALLY, PROVIDE ROOFING, | | WINDOW, AND DOOR SUBMITTALS. | | | | 3.STRUCTURAL DETAILS FOR THE NEW OVERHANGS | | | | 4. OPEN CONDITION WHERE EXISTING SHUTTERS ARE PROPOSED | | TO BE REMOVED | | | | STEVEN KENNEDY, CBO | | CHIEF PLANS EXAMINER | | (561) 805-6710 | | [email protected] | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
6 |
Status |
P |
Date |
2016-04-05 |
|
|
Cont ID |
|
Sent By |
albarran |
Date |
2016-04-05 |
Time |
18:41 |
Rev Time |
0.00 |
Received By |
albarran |
Date |
2016-04-05 |
Time |
18:35 |
Sent To |
I |
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
5 |
Status |
P |
Date |
2016-04-05 |
|
|
Cont ID |
|
Sent By |
albarran |
Date |
2016-04-04 |
Time |
18:35 |
Rev Time |
0.00 |
Received By |
albarran |
Date |
2016-04-04 |
Time |
17:34 |
Sent To |
|
|
Notes |
2016-04-04 18:39:58 | AN ELECTRICAL STOP HAD NOT BEEN ADDED TO THE REVIEWS | | BECAUSE THIS WAS TAKEN IT WITHOUT MENTIONING THE CHANGE | | TO THE ELECTRICAL PLAN. I PASSED THE ELECTRICAL REVIEW | | THOUGH THE LOAD CALCS WERE NOT CORRECT, THE 200 AMP | | SERVICE IS AMPLE FOR THE LOAD. THE FILE WAS HAND | | DELIVERED TO CT. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
4 |
Status |
P |
Date |
2016-02-24 |
|
|
Cont ID |
|
Sent By |
albarran |
Date |
2016-02-24 |
Time |
19:02 |
Rev Time |
0.00 |
Received By |
albarran |
Date |
2016-02-24 |
Time |
16:01 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
F |
Date |
2016-01-21 |
|
|
Cont ID |
|
Sent By |
mvaldes |
Date |
2016-01-21 |
Time |
11:25 |
Rev Time |
0.00 |
Received By |
mvaldes |
Date |
2016-01-21 |
Time |
11:25 |
Sent To |
|
|
Notes |
2016-01-21 11:41:01 | JOB PERMIT NUMBER: 15050695 | | JOB ADDRESS: 616 CLAREMORE DR | | WEST PALM BEACH | | DATE: JAN 21 2016 | | ELECTRICAL PLAN REVIEW COMMENTS | | | | THE PLANS FOR THE ABOVE MENTIONED PERMIT APPLICATION | | HAVE BEEN REVIEWED FOR COMPLIANCE WITH THE EDITION OF | | THE NEC, (NATIONAL ELECTRICAL CODE) AND THE FBC, | | (FLORIDA BUILDING CODE) AS WELL AS THE CITY OF WEST | | PALM BEACH AMENDMENTS IN EFFECT AT THE TIME OF | | SUBMITTAL. BELOW IS A LIST OF THE DEFICIENCIES NOTED. | | 1. PANEL B IS SHOWN AS 200 AMPS ON RISER DIAGRAM | | DOESN?T MATCH BUILDING B WHICH STATES 150 AMPS AND IS | | NON ?COMPLIANT ACCORDING TO DEMAND LOAD CALCULATIONS. | | FBC-R E3704.2 | | | | PLEASE REVISE YOUR DRAWINGS TO REFLECT THE ABOVE | | MENTIONED DEFICIENCIES. | | WHEN RESUBMITTING, FOR A QUICKER RETURN ON YOUR | | RE-SUBMITTAL, YOU ARE REQUIRED TO PROVIDE A RESPONSE | | LETTER (NARRATIVE) ADDRESSING EACH ITEM ALONG WITH THE | | STANDARD CITY RE-SUBMITTAL FORM. THE NARRATIVE SHOULD | | INCLUDE THE PLAN REVIEWER?S COMMENTS AND YOUR RESPONSE | | OR ACTION TO SAME. ADDITIONALLY, PLEASE INSERT | | CORRECTED PAGES INTO THE SUBMITTAL AND LEAVE THE | | PREVIOUSLY REVIEWED SHEETS FOR COMPARISON. | | CLOUDING THE CHANGES WILL BE GREATLY APPRECIATED. | | | | IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO | | CONTACT ME DIRECTLY. | | | | FBC 2014 5TH ED. NEC 2011/RESIDENTIAL | | MARIO VALDES | | ELECTRICAL PLAN EXAMINER | | 516-805-6700 | | [email protected] | | ALTERNATE CONTACT | | MIKE ALBARRAN | | 561-805-6746 | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2015-10-23 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2015-10-23 |
Time |
11:39 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2015-10-23 |
Time |
11:38 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2015-06-29 |
|
|
Cont ID |
|
Sent By |
albarran |
Date |
2015-06-29 |
Time |
18:43 |
Rev Time |
0.00 |
Received By |
albarran |
Date |
2015-06-29 |
Time |
18:07 |
Sent To |
|
|
Notes |
2015-06-29 18:49:24 | LIMITED APPROVAL ON THIS PERMIT AS MARKED ON PLANS. THE | | SUBMITTED DRAWINGS INCLUDE A POOL AND SUPPORTING | | EQUIPMENT AS WELL AS INDICATION OF NEW ELECTRICAL | | PANEL; NONE OF WHICH IS ADDRESSED ON THE PERMIT | | APPLICATION, THEREFORE NOT INCLUDED AS PER THE SCOPE OF | | WORK ALLOWED. | | SHALL COMPLY WITH THE SMOKE DETECTOR REQUIREMENTS OF | | FBC-R 314 |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
4 |
Status |
P |
Date |
2016-03-08 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2016-03-08 |
Time |
11:18 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2016-03-08 |
Time |
11:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
3 |
Status |
P |
Date |
2015-12-11 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2015-12-11 |
Time |
15:55 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2015-12-11 |
Time |
15:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
2 |
Status |
P |
Date |
2015-10-06 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2015-10-06 |
Time |
10:56 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2015-10-06 |
Time |
10:56 |
Sent To |
|
|
Notes |
|
|
Review Stop |
HIST |
HISTORICAL |
Rev No |
1 |
Status |
F |
Date |
2015-06-04 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2015-06-04 |
Time |
16:24 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2015-06-04 |
Time |
16:24 |
Sent To |
|
|
Notes |
2015-06-04 16:25:35 | CHANGES TO FRONT FACADE REQUIRE COA SUBMITTAL. OPENING | | SIZES/SHAPES SHALL NOT BE CHANGED. QUESTIONS CONTACT | | FRIEDERIKE MITTNER, CITY HISTORIC PRESERVATION PLANNER | | AT 822-1457. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
7 |
Status |
N |
Date |
2016-04-05 |
|
|
Cont ID |
|
Sent By |
albarran |
Date |
2016-04-05 |
Time |
18:42 |
Rev Time |
0.00 |
Received By |
albarran |
Date |
2016-04-05 |
Time |
11:29 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2016-04-05 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2016-04-05 |
Time |
11:29 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2016-03-22 |
Time |
10:02 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2016-03-08 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2016-03-08 |
Time |
15:18 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2016-02-10 |
Time |
09:39 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2016-01-22 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2016-01-22 |
Time |
16:59 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2015-12-01 |
Time |
09:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2015-10-23 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2015-10-23 |
Time |
11:39 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2015-09-08 |
Time |
09:24 |
Sent To |
|
|
Notes |
2015-09-09 09:24:44 | RESUB ROUTED TO SKENNEDY |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2015-08-07 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2015-08-07 |
Time |
13:08 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2015-07-20 |
Time |
13:59 |
Sent To |
|
|
Notes |
2015-07-23 13:59:43 | ROUTED TO SKENNEDY |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2015-07-08 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2015-07-08 |
Time |
15:32 |
Rev Time |
|
Received By |
skennedy |
Date |
2015-05-18 |
Time |
|
Sent To |
|
|
Notes |
2015-05-19 09:05:21 | EXPEDITED!!! SENT TO R10. |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
4 |
Status |
P |
Date |
2016-04-07 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2016-04-07 |
Time |
16:40 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2016-04-07 |
Time |
16:40 |
Sent To |
|
|
Notes |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
3 |
Status |
F |
Date |
2016-04-05 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2016-04-05 |
Time |
11:32 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2016-04-05 |
Time |
11:32 |
Sent To |
|
|
Notes |
2016-04-05 11:35:18 | 6TH REVIEW: FBC 2014 5TH ED | | CHRISTOPHER S. THROOP, C.B.O. | | BLDG. PLANS EXAMINER ? PX3169 | | (561) 805-6718 | | [email protected] | | | | PLANS REQUIRE REVIEW BY THE PBC IMPACT FEE OFFICE. CALL | | 233-5025. UPON APPROVAL, YOU MAY CHECK OUT ONE PLAN AND | | TAKE TO THAT OFFICE FOR REVIEW. PLEASE RETURN STAMPED | | WITH A COPY OF RECEIPT AS APPLICABLE. |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
2 |
Status |
F |
Date |
2016-01-22 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2016-01-22 |
Time |
16:58 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2016-01-22 |
Time |
16:58 |
Sent To |
|
|
Notes |
2016-01-22 16:58:36 | PERMIT #15050695 | | 1/22/16 | | | | PLANS REQUIRE REVIEW BY THE PBC IMPACT FEE OFFICE. CALL | | 233-5025. UPON APPROVAL, YOU MAY CHECK OUT ONE PLAN AND | | TAKE TO THAT OFFICE FOR REVIEW. PLEASE RETURNED STAMPED | | WITH A COPY OF RECEIPT AS APPLICABLE. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] | | | | | | |
|
|
Review Stop |
IMPACT |
COUNTY IMPACT FEES |
Rev No |
1 |
Status |
F |
Date |
2015-08-07 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2015-08-07 |
Time |
13:07 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2015-08-07 |
Time |
13:07 |
Sent To |
|
|
Notes |
2015-08-07 13:08:52 | 1ST REVIEW: FBC 2010 | | | | PLANS REQUIRE REVIEW BY THE PBC IMPACT FEE OFFICE. CALL | | 233-5025. UPON APPROVAL, YOU MAY CHECK OUT ONE PLAN AND | | TAKE TO THAT OFFICE FOR REVIEW. PLEASE RETURNED STAMPED | | WITH A COPY OF RECEIPT AS APPLICABLE | | | | | | STEVEN KENNEDY, CBO | | CHIEF PLANS EXAMINER | | (561) 805-6710 | | [email protected] | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
5 |
Status |
P |
Date |
2016-03-08 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2016-03-08 |
Time |
14:07 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2016-03-08 |
Time |
14:07 |
Sent To |
|
|
Notes |
2016-03-08 14:11:22 | FBC 2010 RESIDENTIAL M | | | | PROVISIONALLY APPROVED WITH ASSUMPTION SHEET E-1 ONLY | | WILL BE RESUBMITTED TO RESOLVE FLOOR PLAN CONFLICT | | LAUNDRY V. BATH. | | | | STEVEN KENNEDY, CBO | | CHIEF PLANS EXAMINER | | (561) 805-6710 | | [email protected] | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
4 |
Status |
F |
Date |
2016-02-29 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2016-02-29 |
Time |
15:01 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2016-02-29 |
Time |
15:01 |
Sent To |
|
|
Notes |
2016-02-29 15:01:19 | 4TH REVIEW: FBC 2014 MECHANICAL | | PERMIT #15050695 | | 2/29/16 | | | | 1) AS PREVIOUSLY REQUESTED SUBMIT AC PLANS FOR THE | | PROPOSED PROIECT | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
F |
Date |
2016-01-22 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2016-01-22 |
Time |
16:55 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2016-01-22 |
Time |
16:55 |
Sent To |
|
|
Notes |
2016-01-22 16:56:54 | 1ST REVIEW: FBC 2014 MECHANICAL | | PERMIT #15050695 | | 1/22/16 | | | | 1) PLEASE SUBMIT MECHANICAL PLANS FOR REVIEW. NO PLANS | | WERE SUBMITTED WITH THE PLAN SETS AND THE AC | | CALCULATIONS. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] | | |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2015-10-02 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2015-10-02 |
Time |
14:36 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2015-10-02 |
Time |
14:36 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2015-07-08 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2015-07-08 |
Time |
15:31 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2015-07-08 |
Time |
15:31 |
Sent To |
|
|
Notes |
2015-07-08 15:34:47 | 1ST REVIEW: FBC 2010 | | | | FBC 107 PROVIDE MECHAMICAL PLAN, EQUIPMENT SCHEDULE, | | ENERGY AND SIZING CALCULATIONS. | | | | STEVEN KENNEDY, CBO | | CHIEF PLANS EXAMINER | | (561) 805-6710 | | [email protected] | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
5 |
Status |
P |
Date |
2016-04-01 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2016-04-01 |
Time |
14:17 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2016-04-01 |
Time |
14:17 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
4 |
Status |
F |
Date |
2016-02-20 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2016-02-20 |
Time |
04:22 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2016-02-20 |
Time |
03:50 |
Sent To |
|
|
Notes |
2016-02-20 04:07:06 | 1) ONE SET OF THE REVISED PLANS IS MISSING SHT. #3 AND | | THE OTHER SET HAS SHT. #3 DATED 11/22/15 WHICH HAS NOT | | BEEN CORRECTED. SUBMIT TWO REVISED SETS OF PLANS | | SHOWING THE ENTIRE SCOPE OF PLUMBING WORK TO BE DONE IN | | ALL BUILDINGS. IF NO PLUMBING WORK IS TO BE PERFORMED | | IN A STRUCTURE, CLEARLY NOTE IT ON THE PLANS. 2014 FBC | | SEC. 107.2.1. | | 2) SHT. A-1 SHOWS A NEW BATHROOM AND SHT. E-1 SHOWS A | | LAUNDRY ROOM IN THE SAME LOCATION. CLARIFY. 2ND | | REQUEST. | | 3) SHT. A-1 SHOWS SHELVES IN THE BATHROOM NEXT TO THE | | KITCHEN AND SHT. E-1 SHOWS A NEW SHOWER IN THE SAME | | LOCATION. CLARIFY. 2ND REQUEST. | | 4) PROVIDE AN EXISTING FLOOR PLAN. 2014 FBC SEC. | | 107.2.1. | | 5) INDICATE ON THE PLANS IF ANY NEW PLUMBING WORK WILL | | BE DONE IN BUILDING A.2ND REQUEST. | | 6) PROVIDE A RISER DIAGRAM THAT MATCHES THE FLOOR PLAN | | AND SHOWING ALL FIXTURES FOR ALL NEW PLUMBING WORK TO | | BE DONE IN EACH BUILDING. 2014 FBC SEC. 107.2.1. 2ND | | REQUEST. | | | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
F |
Date |
2015-12-06 |
|
|
Cont ID |
|
Sent By |
gjohnson |
Date |
2015-12-06 |
Time |
09:34 |
Rev Time |
0.00 |
Received By |
gjohnson |
Date |
2015-12-06 |
Time |
09:34 |
Sent To |
|
|
Notes |
2015-12-06 09:50:46 | 3RD REVIEW: FBC 2010 | | | | GEORGE JOHNSON | | PLUMBING PLANS EXAMINER | | CITY OF WEST PALM BEACH | | 561-805-6711 | | [email protected] | | | | PLUMBING COMMENTS: | | | | 1.SHEET A-1 SHOWS A NEW BATHROOM. SHEET E-1 SHOWS A | | LAUNDRYROOM IN SAME LOCATION PLEASE CLARIFY. | | PER WPB AMEND. TO FBC SEC 107.2.1 | | 2.SHEET A-1 SHOWS SHELVES IN BATHROOM NEXT TO KITCHEN . | | SHEET E-1 SHOWS A NEW SHOWER IN THAT SAME LOCATION | | PLEASE CLARIFY. | | PER WPB AMEND. TO FBC SEC 107.2.1 | | 3.PLEASE PROVIDE EXISTING FLOOR PLAN. | | PER WPB AMEND. TO FBC SEC 107.2.1 | | 4. PLEASE CLARIFY IS THERE ANY PLUMBING WORK BEING DONE | | IN BUILDING A. | | PER WPB AMEND. TO FBC SEC 107.2.1 | | 5. PLEASE PROVIDE A SINGLE RISER DIAGRAM MATCHING THE | | FLOOR PLAN AND SHOWING ALL FIXTURES. | | PER WPB AMEND. TO FBC SEC 107.2.1 | | |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2015-10-04 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-10-04 |
Time |
03:34 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-10-04 |
Time |
03:18 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2015-06-10 |
|
|
Cont ID |
|
Sent By |
tklarge |
Date |
2015-06-10 |
Time |
05:26 |
Rev Time |
0.00 |
Received By |
tklarge |
Date |
2015-06-10 |
Time |
05:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
3 |
Status |
P |
Date |
2016-03-08 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2016-03-08 |
Time |
15:19 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2016-03-08 |
Time |
15:19 |
Sent To |
|
|
Notes |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
2 |
Status |
F |
Date |
2016-01-19 |
|
|
Cont ID |
|
Sent By |
cthroop |
Date |
2016-01-19 |
Time |
14:40 |
Rev Time |
0.00 |
Received By |
cthroop |
Date |
2016-01-19 |
Time |
14:40 |
Sent To |
|
|
Notes |
2016-01-19 14:43:04 | CHRISTOPHER S. THROOP, C.B.O. | | BLDG. PLANS EXAMINER ? PX3169 | | (561) 805-6718 | | [email protected] | | | | PREVIOUS REQUEST FOR PRODUCT APPROVALS NOT ADDRESSED. | | | | FBC 107.3.4 - PROVIDE PRODUCT APPROVALS FOR THOSE | | PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED | | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. | | SPECIFICALLY, PROVIDE ROOFING SUBMITTALS. | | |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
1 |
Status |
F |
Date |
2015-07-08 |
|
|
Cont ID |
|
Sent By |
skennedy |
Date |
2015-07-08 |
Time |
15:32 |
Rev Time |
0.00 |
Received By |
skennedy |
Date |
2015-07-08 |
Time |
15:32 |
Sent To |
|
|
Notes |
2015-07-08 15:33:26 | 1ST REVIEW: FBC 2010 | | | | FBC 107.3.4 - PROVIDE PRODUCT APPROVALS FOR THOSE | | PRODUCTS WHICH ARE REGULATED BY | | FAC RULE 9N-3 REVIEWED AND APPROVED IN WRITING BY THE | | DESIGNER OF RECORD. SPECIFICALLY, PROVIDE ROOFING, | | | | | | STEVEN KENNEDY, CBO | | CHIEF PLANS EXAMINER | | (561) 805-6710 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
P |
Date |
2016-03-08 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2016-03-08 |
Time |
11:18 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2016-03-08 |
Time |
11:18 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
P |
Date |
2015-12-11 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2015-12-11 |
Time |
15:56 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2015-12-11 |
Time |
15:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2015-10-06 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2015-10-06 |
Time |
10:56 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2015-10-06 |
Time |
10:56 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2015-06-04 |
|
|
Cont ID |
|
Sent By |
fmittner |
Date |
2015-06-04 |
Time |
16:25 |
Rev Time |
0.00 |
Received By |
fmittner |
Date |
2015-06-04 |
Time |
16:25 |
Sent To |
|
|
Notes |
|
|