Plan Review Stops For Permit 15050687 |
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2015-06-04 |
|
|
Cont ID |
|
Sent By |
albarran |
Date |
2015-06-04 |
Time |
08:48 |
Rev Time |
0.00 |
Received By |
albarran |
Date |
2015-06-04 |
Time |
08:23 |
Sent To |
I |
|
Notes |
2015-06-04 08:48:43 | ELECTRICAL PROVISO: | | THE SYSTEM GROUNDING SHALL BE INSPECTED FOR INTEGRITY | | AND ANY DEFICIENCY CORRECTED AS PER CURRENT CODE | | REQUIREMENTS. INTER-SYSTEM BONDING TERMINAL REQUIRED AS | | PER NEC 250.94 | | |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2015-06-02 |
|
|
Cont ID |
|
Sent By |
albarran |
Date |
2015-06-02 |
Time |
17:38 |
Rev Time |
0.00 |
Received By |
albarran |
Date |
2015-06-02 |
Time |
17:36 |
Sent To |
I |
|
Notes |
2015-06-02 17:39:13 | SCOPE OF WORK NEEDS TO BE CLEARLY DEFINED ON THE | | DRAWINGS |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2015-06-04 |
|
|
Cont ID |
|
Sent By |
albarran |
Date |
2015-06-04 |
Time |
08:55 |
Rev Time |
|
Received By |
albarran |
Date |
2015-05-18 |
Time |
|
Sent To |
|
|
Notes |
2015-06-04 08:56:30 | SENT TO SMALL READY "E" | 2015-05-18 17:16:30 | SENT TO <$5K ELECTRICAL BOX. |
|
|
|