Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2015-09-02 Cont ID  
Sent By cranford Date 2015-09-02 Time 08:27 Rev Time 0.00
Received By cranford Date 2015-09-02 Time 07:53 Sent To  
Notes
2015-09-02 08:26:421. WORK WITHIN RIGHT OF WAY TO COMPLY WITH CITY
 STANDARD DETAILS GC-1 AND GC-6. HTTP://WPB.ORG/ENGINEER
 ING/ENGINEERING-SERVICES/ENGINEERING-STANDARDS/
  
 2. SIDEWALKS SHALL BE OF PORTLAND CEMENT CONCRETE, A
 MINIMUM OF 3,000 PSI, FOUR INCHES (4") THICK, AND FIVE
 FEET (5.0') WIDE. SIDEWALKS SHALL EXTEND ACROSS
 DRIVEWAYS, AT WHICH LOCATIONS THEY SHALL HAVE A MINIMUM
 THICKNESS OF 6" AND BE REINFORCED WITH FIBERMESH. ANY
 NECESSARY OBSTRUCTION SHALL BE PLACED SO AS TO MAINTAIN
 THE MAXIMUM CLEAR WIDTH AND MEET THE REQUIREMENTS OF
 THE AMERICANS WITH DISABILITIES ACT. SIDEWALKS SHALL BE
 MAINTAINED BY THE CITY. THE ABUTTING PROPERTIES SHALL
 MAINTAIN DRIVEWAYS, INCLUDING THE SIDEWALK SECTIONS.
  
 3. MAINTENANCE OF TRAFFIC PLAN (MOT) FOR SIDEWALK
 CLOSURE MUST BE APPROVED BY CITY.
  
 4. SIDEWALKS SHALL HAVE A TRANSVERSE SLOPE OF 2% PER
 FOOT DOWN TOWARD THE SWALE OR GUTTER AND SHALL BE GIVEN
 TRANSVERSE BROOM FINISH. SPECIAL SURFACE TREATMENTS
 SUCH AS PAVERS, TILE, ETC., AND PAINT ARE NOT
 PERMITTED..
  
 5. ALL CONCRETE PLACED WITHIN RIGHT-OF-WAY MUST BE FROM
 A CONCRETE MIX PLANT. BATCH TICKETS ARE TO BE SUBMITTED
 TO CITY INSPECTOR. NO BAG CONCRETE IS AUTHORIZED FOR
 USE WITHIN THE RIGHT OF WAY.
  
 6. WHEN THE REMOVAL OF SIDEWALKS, CURBS OR GUTTERS IS
 NECESSARY FOR CONSTRUCTION, THEY SHALL BE REMOVED IN
 FULL SECTIONS OR A MINIMUM OF FIVE FEET IN LENGTH, AND
 ALL BROKEN EDGES CUT SMOOTH BY USE OF A SUITABLE POWER
 SAW OR OTHER APPROPRIATE MEANS.
  
  
 KELLY CRANFORD, P.E.
 LAND DEVELOPMENT ENGINEER
 PUBLIC WORKS DEPARTMENT
 CITY OF WEST PALM BEACH
 [email protected]
 561-494-1098 (OFFICE)
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2015-06-18 Cont ID  
Sent By cranford Date 2015-06-18 Time 13:33 Rev Time 0.00
Received By cranford Date 2015-06-18 Time 13:19 Sent To  
Notes
2015-06-18 13:32:49PLANS DO NOT SHOW PROPOSED DRIVEWAY OR SIDEWALK
 LOCATIONS.
  
 WORK WITHIN RIGHT OF WAY MUST COMPLY WITH CITY STANDARD
 DETAILS, WHICH MAY BE DOWNLOADED AT
 HTTP://WPB.ORG/ENGINEERING/FORMS-AND-PUBLICATIONS/
  
 KELLY CRANFORD, P.E.
 LAND DEVELOPMENT ENGINEER
 PUBLIC WORKS DEPARTMENT
 CITY OF WEST PALM BEACH
 [email protected]
 561-494-1098 (OFFICE)

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-09-24 Cont ID  
Sent By cpuell Date 2015-09-24 Time 15:39 Rev Time 0.00
Received By cpuell Date 2015-08-25 Time 12:41 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-07-09 Cont ID  
Sent By cpuell Date 2015-07-09 Time 16:05 Rev Time 0.00
Received By cpuell Date 2015-05-15 Time 10:21 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2015-09-24 Cont ID  
Sent By ajones Date 2015-09-24 Time 15:21 Rev Time 0.00
Received By ajones Date 2015-09-24 Time 15:21 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2015-07-09 Cont ID  
Sent By sgraham Date 2015-07-09 Time 15:33 Rev Time 0.00
Received By ajones Date 2015-07-09 Time 15:33 Sent To  
Notes
2015-07-09 15:41:227/9/15- FAILED A SURVEY/SITE PLAN NEEDS TO BE SUBMITTED
 SHOWING THE WIDTH OF THE DRIVEWAY AND SITE SETBACKS.
  
 ANGELLA VANN, AICP
 561-822-1441


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved