Plan Review Details - Permit 15050172
Plan Review Stops For Permit 15050172
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2015-06-13 Cont ID  
Sent By rmcdouga Date 2015-06-13 Time 10:40 Rev Time 0.00
Received By rmcdouga Date 2015-06-09 Time 09:43 Sent To M
Notes
2015-06-13 09:23:30REVISION REQUIRED.
 SUBMIT TWO SETS OF PLANS SHOWING THE SIZE AND LOCATION
 OF THE FLOOD OPENINGS.
  
 APPROVED WITH EXCEPTION. THIS PLAN HAS BEEN APPROVED
 PROVISIONALLY. FAILURE TO CORRECT THE LISTED
 DEFICIENCIES IN THIS PLAN PRIOR TO INSPECTION WILL
 RESULT IN FAILED INSPECTION(S) AND ASSESSMENT OF
 RE-INSPECTION FEE(S).
 FBC R322.2.2 (2)(2.1) THERE SHALL BE A MINIMUM OF TWO
 FLOOD OPENINGS ON DIFFERENT SIDES OF EACH ENCLOSED
 AREA: IF A BUILDING HAS MORE THAN ONE ENCLOSED AREA
 BELOW THE DESIGN FLOOD ELEVATION, EACH AREA SHALL HAVE
 OPENINGS ON EXTERIOR WALLS.
  
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2015-06-09 Cont ID  
Sent By rlecky Date 2015-05-19 Time 10:55 Rev Time 0.00
Received By rlecky Date 2015-05-19 Time 10:55 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-06-18 Cont ID  
Sent By ccole Date 2015-06-18 Time 16:32 Rev Time 0.00
Received By ccole Date 2015-06-18 Time 16:32 Sent To  
Notes
2015-06-18 14:48:54INCOMING SENT TO C. COLES' DESK.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-06-16 Cont ID  
Sent By rmcdouga Date 2015-06-16 Time 15:04 Rev Time 0.00
Received By rmcdouga Date 2015-06-16 Time 13:06 Sent To  
Notes
2015-06-16 13:06:44TO CHRIS COLE DESK
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-06-16 Cont ID  
Sent By shill Date 2015-06-15 Time 13:05 Rev Time 0.00
Received By shill Date 2015-05-07 Time 17:00 Sent To  
Notes
2015-05-07 17:00:29****EXPEDITED****
 R27
  

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2015-06-16 Cont ID  
Sent By rmcdouga Date 2015-06-16 Time 15:02 Rev Time 0.00
Received By rmcdouga Date 2015-06-16 Time 15:02 Sent To  
Notes
2015-06-16 15:03:12MU2015-14446 , NO IMPACT FEES WERE DUE.

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2015-06-09 Cont ID  
Sent By rmcdouga Date 2015-06-09 Time 09:43 Rev Time 0.00
Received By rmcdouga Date 2015-06-09 Time 09:43 Sent To  
Notes
2015-06-09 09:44:16BEFORE A PERMIT TO CONSTRUCT CAN BE ISSUED, IMPACT FEES
 MUST BE PAID TO PALM BEACH COUNTY. UPON APPROVAL, ONE
 SET OF PLANS SHALL BE SIGNED OUT AND SUBMITTED TO PALM
 BEACH COUNTY FOR AN IMPACT FEE REVIEW. THE PLANS WITH
 THE IMPACT FEE STAMP AND A COPY OF THE PAID RECEIPT
 MUST BE RETURNED TO THE CITY BUILDING DEPARTMENT BEFORE
 THE BUILDING PERMIT CAN BE ISSUED. FOR INFORMATION CALL
 PALM BEACH COUNTY IMPACT FEES AT (561) 233-5025.

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2015-06-18 Cont ID  
Sent By ccole Date 2015-06-18 Time 16:32 Rev Time 0.00
Received By ccole Date 2015-06-18 Time 16:31 Sent To  
Notes
2015-06-18 16:35:42MECHANICAL PROVISO:
 6/18/15
  
 THE CONTRACTOR SHALL SUBMIT REVISED ENERGY CALCULATIONS
 SIGNED BY THE PREPARER AND THE OWNER.
 THE CALCULATIONS SHALL SHOW THE CORRECT VALUES AND DATA
 FOR THE GARAGE THERMAL ENVELOPE- WALLS, FLOORS,
 CEILING, MAN DOORS, AND GARAGE DOOR.
 MUST BE SUBMITTED FOR FINAL C/O.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2015-06-16 Cont ID  
Sent By ccole Date 2015-06-16 Time 14:35 Rev Time 0.00
Received By ccole Date 2015-06-16 Time 14:35 Sent To  
Notes
2015-06-16 14:44:012ND MECHANICAL REVIEW
  
 1) THE REVISED ENERGY CALCULATIONS AND AC LOAD ARE FOR
 THE SECOND LEVEL GAME ROOM ONLY. AS PREVIOUSLY
 REQUESTED PROVIDE CALCULATIONS FOR THE ENTIRE ADDITION
 INCLUDING THE CONDITIONED 1ST LEVEL GARAGE.
 2) PLEASE PROVIDE THE MANUAL J WORKSHEETS FOR THE
 PROPOSED SPACES, AND INCLUDE THE COOLING AND HEATING
 EQUIPMENT SELECTIONS ON THE REVISED SUMMARY SHEET.
  
 CHRISTOPHER COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  
  
  
  
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2015-06-15 Cont ID  
Sent By ccole Date 2015-06-15 Time 08:15 Rev Time 0.00
Received By ccole Date 2015-06-15 Time 08:15 Sent To  
Notes
2015-06-15 08:20:591ST REVIEW: FBC 2010 MECHANICAL
  
 1) THE PROPOSED NEW MINI-SPLIT AC SYSTEM TO CONDITION
 THE GARAGE AND GAME ROOM REQUIRES A REVISION TO BOTH
 THE ENERGY CALCULATIONS AND THE MANUAL J AC LOAD
 CALCULATIONS.
  
 CHRISTOPHER COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status P Date 2015-06-04 Cont ID  
Sent By sgraham Date 2015-06-04 Time 14:52 Rev Time 0.00
Received By sgraham Date 2015-06-04 Time 14:52 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2015-05-27 Cont ID  
Sent By sgraham Date 2015-05-27 Time 15:26 Rev Time 0.00
Received By sgraham Date 2015-05-27 Time 15:25 Sent To  
Notes
2015-05-27 15:26:485/27/15 ZONING FAILED
  
 1. SUBMIT TWO UP TO DATE SURVEYS.